Change Order No. 01
Western Avenue Corridor Improvements
Project No. 115-097
The following sections of the Contract Documents are revised as a result of the above changes:
BIDDING AND CONTRACT REQUIREMENTS:
Bid/Proposal Form:
NO CHANGE
SPECIFICATIONS:
The following special provisions have been amended or added to the Contract Documents and are issued
as part of this Change Order:
XIII. PROSECUTION AND PROGRESS
B. Additions
3. The project will have intermediate completion dates as listed in the table below for substantial
completion:
Phase I & 11: Kaley Street and Meade Street Sewer and Water Crossings — June 30, 2017
Phase III: South Side Improvements — August 31, 2017
Phase IV: North Side Improvements — October 10, 2017
Phase V: Fixtures, Trees, Fencing, and Landscaping — October 13, 2017
a. The project will have an intermediate substantial completion date of June 30, 2017 for
storm sewer to be constructed from the intersection of Western Avenue and Kaley Street to
its northern connection on Kaley Street and for water crossings at Meade Street and at
Kaley Street, A minimum of one travel lane and one parking lane along Western Avenue
shall be open to traffic during the lane closure.
b. The project will have an intermediate substantial completion date of August 31, 2017 for
construction of curb, sidewalk, roadway, lighting, pavers, and all project elements complete
and in -place on the southern side of the roadway centerline except for pavement markings,
benches, bike racks, landscaping, and trees. A minimum of one travel lane and one parking
lane along Western Avenue shall be open to traffic during the lane closure period.
Temporary parking lane closures will be permitted for water service connections. Phase III
of the project can occur simultaneously with Phase II, provided that the contractor maintains
a minimum of one travel lane along Western Avenue and submits a revision to the
Maintenance of Traffic Plan that is approved by the City prior to construction.
c. The project will have an intermediate substantial completion date of October 10, 2017 for
construction of curb, sidewalk, roadway, lighting, pavers, pavement markings, and all
project elements complete and in -place on the north side of the roadway centerline except
for benches, bike racks, landscaping, and trees. A minimum of one travel lane and one
parking lane along Western Avenue shall be open to traffic during the lane closure period.
d. The project will have an intermediate substantial completion date of October 13, 2017 for
installation of benches, bike racks, landscaping, fencing, and trees. A minimum of two travel
lanes on Western Avenue shall be open to traffic during the lane closure period.
XXX. CONCRETE PAVEMENT REMOVAL
SHEET 2 OF 3
Change Order No. 01
Western Avenue Corridor Improvements
Project No. 115-097
B. Additions
10. The removal of concrete pavements not designated on plans for concrete pavement removal
will be paid for as common excavation unless otherwise noted.
LXX. TEMPORARY LIGHTING
B. Additions
3. On July 26, 2017, the Contractor shall assume responsibility for maintaining the temporary
lighting until permanent lighting is in place. The Contractor shall turn temporary lights on in the
evening and off in the morning. The Contractor shall be responsible for fueling the lights, In the
event that South Bend Traffic and Lighting needs to remove the temporary lighting, the
Contractor shall be responsible for procuring replacement temporary lighting at their cost.
DRAWINGS:
The following sheets have been revised and are issued as new sheets as a part of this Change Order:
NO CHANGE
END CHANGE ORDER 1