HomeMy WebLinkAboutAmendment No. 1 to PSA - American Structurepoint, Inc. - Additional DTSB Road ImprovementsAMENDMENT 1 TO OWNER -ENGINEER AGREEMENT 1. Background Data: a. Effective Date of Owner -Engineer Agreement: February 14, 2017 b. Owner: City of South Bend c. Engineer: American Structurepoint, Inc. d. Project: Additional South Bend Downtown Road, Traffic, and Signal Improvements 2. Nature of Amendment X Additional Services to be performed by Engineer X Modifications to Payment to Engineer 3. Description of Modifications Attachment 1, "Modifications" Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is the date of the latest requires signature below. Owner: City of South Bend, Indiana Board of Public Works Title: Gary A. Gilot, Presidgnt By: �,14 A A�- '� % L (. ,k /,,-- Title: L,916zanna Frit berg, Member B y: Vh � Title: lzabeth A. Maradik, Member By: _,,� Z �� Title: Therese J. Do6ua0ember IN Title: .lames Mueller, Member Attest: � � Title: nda Martin, Clerk Date: Engineer: American Structurepoint, Inc. By: Title: Gregor lnski, Road Group Leader Date: j Page 1 of 1 201401351 This is Attachment 1, consisting of 2 pages, to Amendment No. 1 Modifications Engineer shall perform the following Additional Services: Exhibit A, Part I.A is revised by adding the following: Design and plan development for the addition of an eastbound to northbound left -turn lane at the intersection of Sample Street and Main Street. Design services shall include additional topographic survey (Exhibit B, attached hereto and incorporated herein), road design, utility coordination, traffic signal modification, project meetings with City staff and INDOT, right of way engineering for two parcels, bidding phase services, and construction phase services. Right-of-way engineering will include title work, title work updates, plats and legal descriptions, staking and appraisal problem analysis (APAs). Review submittals will include preliminary field check plans (40% complete), final plans (95% complete), and Final Tracings (100% complete). Prepare a separate submittal for independent bid package of said area to be bid by Owner (Exhibit E, attached hereto and incorporated herein). 6. Prepare a separate submittal for an independent quote package from the northwest corner of Main Street and Washington Street, in front of the Chase Building, for work between back of curb and face of building, including plan sheet(s), quantities, and specifications relating to construction of said area. 7. Adjust signal timings along Martin Luther King, Main Street, and Lafayette Street between Sample Street and Bartlett Street as outlined in Exhibit C, attached hereto and incorporated herein. The retiming of signals shall include the following: signal system inventory assessment, analysis and timing development, and deployment. Exhibit A, Part 1.13 is added to read as follows: B. Services Not Included in Engineer's Scope: 1. Hydraulics analysis and design of storm sewer 2. Geotechnical investigation Subsurface utility engineering 4. Lighting design and plan development 5. Sanitary and water line design and plan development 6. Land Acquisition Services 2. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: Section 7.0 ] A. I is revised as follows: Page l of 2 201401351 1. For services other than right-of-way engineering, an amount equal to the cumulative hours charged to the Project by each class of Engineer's employees times standard hourly rates for each applicable billing class for all services performed on the Project, plus reimbursable expenses and Engineer's consultants' charges, if any, not to exceed 9 8k1 $157,1_00. Section 7.01A.2 is added to read as follows: 2. The ENGINEER shall be compensated for right -of way engineering services based on the specific cost per unit multiplied by the actual units of work. Estimated unit costs are shown in Exhibit D, which is attached Hereto and incorporated herein. The final amount will be adjusted according to the actual subconsultant invoices; however, the final amount shall not exceed $6,900 unless and until a supplemental agreement is executed. Two parcels are assumed. Page 2 of 201401351 Exhibit B ATTACHMENT 8 ? ti LFTy OF 5OLMi SUM FASFDMP40 WFt,7 MET LT TURN CUCEPITUAL DMG1i - SUViiY LIll-r 4 C' *A 201401351 pa sn- , I UT -1-,; 51 - z. -PA IL Y. g Ad, I dF A 11 V •Of 4t r vi Lgi x 1A tir FF L-q -7 `p _-L 77V. _- - 4_4 Vol X bm W4. 7. 1s 1 Ui -4 4yll j Its Vit I _3 ef-I 61 D" red i, 6 A F11,42 f A �D: �4 it _tkf". c 41 _3 Wi WS v 0 _Xk. F TR R Jig am T te, P, 7Af, R 6. 11, 1%;eat IM :4 ttS. K I PY It,: 0'1, -o to AN f 6 R7, ta, a to a 1- J O r 2 i me . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........ ....... IV a a Ina "s 0 rL 7i ITIT. �717_77 p .,p AIN AW: E ,,'T Summary of Fees - Amendment No. 1 to 2/14/17 Agreement 6/13/2017 Main and Sample Intersection Fee Additional Topographic Survey $1,700 Road Design and Plan Development $38,650 Traffic Signal Modification $6,000 Utility Coordination $3,230 Progress Meetings $2,600 INDOT Meetings $2,300 Bidding Phase Services $3,200 Construction Phase Services $5,000 Right of Way Engineering - Two parcels $6,900 Location Route Survey Plat for Right of Way Engineering $7,000 Quote Package Main and Washington at Chase Tower $7,800 Traffic Signal Retiming $46,000 Downtown South Bend Total $1.30,380 Estimated Remaining Balance $16,365 Request for Additional Funds $114,015 Project: South Bend One -Way to Two Way Conversion Description: Road Design - Sample and Main Intersettion Road Design - Manhour Justification 02417 WORK CLASSIFICATION ESTIMATED TIME HOURS TOTAL Project Manager Senior Engineer Project En over Staff En ineer Senior Technician Technician Preliminary Field Check Plans 40 % complete) Review Field Survey from Others 0 1 0 1 1 0 3 Generate Existing Ground Model 0 0 0 0 1 0 1 Plot and Check To olCross Sections 0 0 1 1 1 01 3 Develop and check Title Sheet 0 0 1 0 0 1 2 Develop and check index Sheet 0 0 1 0 1 1 3 Develop Typical Sections 0 1 2 2 1 4 6 Level One and Level Two Checklist 0 1 0 11 0 0 2 Layout Existing Roadway Alignment 1 I I 1 0 1 5 Design Preliminary ADA compliant Sidewalk Profile Grades 0 1 0 2 0 1 4 Develop Plan & Profile Sheets I I I 1 1 0 5 Preliminary bike and Sidewalk Design 0 0 0 0 0 01 0 Prelirnin Rigt-of-way detenninations 0 1 1 2 0 0 4 preliminary Drainage 1 2 2 t 0 0 6 Assessment of Drives 0 1 1): 2 0 0 3 Preliminary MOT Design 1 3 4 81 0 0 16 Preliminary Construction Details 1 2 4 41 0 4 15 Preliminary Lighting Plans 0 0 0 01 0 0 0 Assess Pavement Cores 01 l 0 0 0 0 1 elimina Pavement Markings 0 1 1 1 0 1 4 Preliminary Signing 0 0 1 2 0 0 3 Preliminary Quantities 0 1 1 4 0 0 6 Preliminary Cost Estimate 1 2 1 2 0 0 6 Preliminary Erosion Control 0 1 0 2 0 0 3 Attend field Check 0 4 0 0 0 0 4 C/ A Plans 2 4 0 01 0 0 6 Coordination and Management 21 8 0 01 0 0 10 Wepare Submittal Packet 01 1 0 1 1 0 3 Subtotal 10 38 22 38 7 9 124 Stake 3 Plans 90% complete) Revisions from previous review 1 2 21 6 3 3 17 Finalize Title Sheet 0 1 0 01 1 0 2 Finalize Index Sheet 01 0 1 0 1 0 2 Finalize Typical Sections 0 1 1 1 1 0 4 Level One Checklist Complete 0 0 0 1 0 0 1 Final RoadwayAli ent 0 1 1 1 1 0 4 Final ADA compliant Sidewalk Profilc Grades 0 1 0 2 2 0 5 Final Plan & Profile Sheets 1 1 2 2 2 0 8 Final Cross Sections 0 2 0 3 3 0 8 Final Bike Lane and Sidewalk Design 0 1 1 21 0 0 4 Riph(-Of-WRY Com lete 01 1 1 1 0 0 3 Final Drainage Structures 0 2 2 2 1 1 8 Final Drive DcAgn 0 1 1 2 0 0 4 Rule 5 Pormit 1 2 2 2 0 0 7 Final Construction Details 2 2 2 6 3 3 18 Miscellaneous Details 1 2 2 2 21 0 9 Final MOT Plans andkqgM 1 4 2 4 2 2 15 Final Pavement Markings 0 2 1 2 0 1 6 Final Erosion Control 0 1 1 1 0 0 3 Finalize Tables 0 1 0 1 1 0 3 Final Quantities 0 1 1 8 0 0 10 Final Cost Estimate 0 1 2 2 0 0 5 Final Contract Specifications and Book 0 2 2 41 0 01 8 C! APIans 2 6 0 0 0 0' 8 Coordination and Management 2 8 0 0 0 0 10 Prepare Submittal Packet 01 1 1 1 0 0 3 Subtotal 11 47 28 56 23 to 175 Final Plans 100% Complete. Revisions from previous review 1 2 4 4 4 0 15 Final QC/A Plans and Design 2 8 0 0 0 0 10 Submit Final Packa e 0 4 4 4 0 4 16 0 Subtotal 3 14 8 8 4 4 41 Subtotal 24 99 58 102 34 23 340 Page 1 201101043 Project: South Bend One -Way to Two Way Conversion Description. Road Design -Sample and Main Intersection Road Design - Manhour Justification 02-1nn-17 WORK CLASSIFICATION ESTIMATED TIME HOURS TOTAL Project Manager Senior Engineer Project En inter Staff I E-zineer Senior Technician Technictan TOTAL HOURS 24 99 58 102 34 23 340 WEIGHTED HOURLY RATE $165,26 $145,33 $111,36 $78.58 $112.14 $75.64 DIRECT SALARY COST $3 966.24 $14 387.67 $6 458.88 38,01536 $3 812 76 $1,739-72 1 $38 80.43 DIRECT COSTS See Below $260.00 [TOTAL FEE $38,640.43 Unit Cost Qaanlity Cost Mileage $0,535 0 $0.00 Shipping LSUM 0 $0.00 Blueprints $1.50 100 $150.00 Copies $0.10 100 $10-00 Rule 5 Permit $100.00 1 $100.00 TOTAL. _ 1 $260.00 Page 2 201101043 AMERICAN STRUCTUREPOINT, INC. MANHOUR JUSTIFICATION South Bend pne-Way to Two Way Conversion DESCRIPTION: Chase Building Quote Package June 2, 2017 WORK CLASSIFICATION ESTIMATED TIME Senior En ineer Project En ineer Staff En ineer Senior Technlclan Technician TOTAL Pavement Design Site Assessment 4 4 0 0 0 8 Title Sheet 0 0 0 0 0 0 Index Sheet 0 0 0 0 0 0 Co & Ad Ls TyRical Section 0 1 2 0 1 4 Create Plan and Profile Sheet to Appropriate Scale 2 1 4 0 2 9 Create Construction Detail Sheet & Adjust for Previous Construction 2 1 6 4 0 13 Compile Detail Sheets (Lighting, Landscaping, Signing, Spot Elevations, Signal) & Adjust for New Quote Package 0 2 4 2 0 8 Cam ute Quantities 0 2 6 0 1 9 Pay Item List for Quote Package & Estimate 0 2 2 0 0 4 Compile Specifications 2 2 2 0 0 6 Review Utility Conflicts 0 2 0 0 0 2 QClQA 2 2 0 0 0 4 Coordination with City 4 2 0 0 0 6 TOTAL HOURS 16 21 26 6 4 T3 AVERAGE HOURLY RATE $ 146.33 ; 111.361 $ 78.58 $ 112.14 $ 75.64 DIRECT SALARY COST $ 2,325.28 $ 2,338.56 1 $ 2,043.08 $ 672.84 $ 302,66 $ 7,682.32 FIXED FEE included in avera a hour) rate $ DIRECT COSTS {See Below) $ 128.40 TOTAL FEE $ 7,810,72 Direct Expenses Cost Unit Cost Units Quantity Cost Lodging $79.00 Nights 0 $0.00 Meals $26.00 Days 0 $D.00 Mileage - Field Check $0.636 Miles 240 $128.40 Mileage - Coordinatlon Mts $0.636 Miles 0 $0.00 Blueprints $1.60 Each 0 $0.00 Copies $0.10 Each 0 $0.00 M tars $3.60 Each 0 0,00 Total $128,40 Chase Bldg Quote Package Page 1 of 1 IN201401351Quote Package Chase Bldg-pkw edit AMERICAN STRUCTUREPOINT, INC. MANHOUR JUSTIFICATION 5/18/2017 South Bend Street One -Way to Two Conversion DESCRIPTION: UTILITY COORDINATION - Main and Sample WORK CLASSIFICATION ESTIMATED TIME Project Manager Senior Engineer Staff Engineer Senior Technician Technician TOTAL UtilIV Coordination Services Prepare & distribute Initial Notices 0 0 1 0 0 1 Initial Meeting with Utilities 2 2 0 0 0 2 Prepare & distribute existing plans for verification 0 0 1 0 1 2 Prepare & distribute preliminary plans 0 0 1 0 0 1 Review construction plans for potential utility conflicts 0 1 1 0 0 2 Prepare & distribute preliminary final plans 0 0 1 0 0 1 Conduct Utility Coordination Meeting 0 1 1 0 0 2 Review relocation plans 0 2 1 0 0 3 Review written work plans 0 1 0 0 0 1 Coordinate with South Bend to issue notice to proceed 0 1 1 0 0 2 Review any cost reduction measures proposed by utilities 0 1 1 0 0 2 Prepare Utility special provision 0 2 1 0 0 3 Prepare utili coordination certification 0 0 1 0 0 1 "track utility relocations 0 1 1 0 0 2 One Additional Utility Coordination Meeting 0 0 0 0 0 0 Consultant Coordination 0.0 0.0 0.0 0.0 0.0 0 TOTAL HOURS 2 12 12 0 1 25 AVERAGE HOURLY RATE $165.26 $145.33 $78.58 $112,14 $75.64 SUBTOTAL $330.62 $1 743.96 $942.96 $0.00 $75.64 $3 093.08 DIRECT COSTS see below $139.10 TOTAL FETE $3,232.18 DIRECT COSTS UNIT COST QUANTITY COST Travel, field checks, office reviews, coordination meetings, etc. $0.535 260 $139.10 Shipping (overnight) $12.00 0 $0.00 Certified Letters $5.00 0 $0.00 TOTAL $139.10 Utility Coordination Page 1 of 1 200901278 AMERICAN STRUCTUREPOINT, INC. Road Design - Manhour Justification Project- South Bend One -Way to Two -Way Conversion Description - Progress Meetings - Sample to Main 02-J n,-i 7 WORK CLASSIFICATION ESTIMATED TIME HOURS TOTAL Project Manager Senior Engineer Staff Engineer Project Engineer Technician In office Progress Meetings with City 2 8 8 0 0 0 16 0 0 0 0 01 0 0 0 0 0 0 0 0 0 01 0 0 0 TOTAL HOURS 8 8 0 0 0 16 WEIGHTED I IOURLY RATE $165.26 $145.33 $78.58 $111.36 $75.64 DIRECT SALARY COST $1 322.08 $1,162.64 $0.00 $0.00 $0.00 $2,484.72 DIRECT COSTS See Below $139.10 TOTAL FEE $2.623.82 11 Milea a $0.535 260 $139.10 ShipRing LSUM 0 $0.00 Meals $26.00 0 $0,00 Lodging. $89.00 0 $0.00 Blue rints 1$1.50 1 0 1 $0,00 Ca ies I $0.10 1 D 1 $0,00 M iars 1 $3.50 1 D 1 $0-00 1 $139.10 1 Page 1 201401351_DESIGN.South Bend..Mise MHJ AMERICAN STRUCTUREPOINT, INC. Road Design » Manhour Justification Project: South Bend One -Way to Two -Way Conversion Description- INDOT Meetings - Sample to Main 02-lw-17 WORK CLASSIFICATION ESTIMATED TIME I10C1RS TOTAL Project Mann er Senior pn ineer Staff Engineer Project Engineer Technician Coordination Meetings with INDOT one 7 7 0 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL HOURS 7 7 1 0 0 0 14 WEIGHTED HOURLY RATE $165.26 $145.33 $7$.58 $I11.36 $75.64 DIRECT SALARY COST $1 156.82 $1 017.31 $0.00 $0.00 $0.00 $2,174.13 DIRECT COSTS See Below $139.10 TOTAL FEE S2 313.23 Mileage $0.535 260 $139,10 Shipping LSUM 0 $0.00 Meals $26.00 0 $0.00 Lodging $89.00 0 $0.00 Blue rints $1.50 1 0.00 Co ies $0.10 1 D 1 $0.00 M lars $3.50 0 1 $0.00 I $139.10 j Page 1 201401351_DESIGN.South Bend..Misc MHJ AMERICAN STRUCTUREPOINT, INC. Road Design - Manhour Justification Project: South Bend One -Way to Two -Way Conversion Description: Bldding Phase Services 02-1un-17 WORK CLASSIFICATION ESTIMATED TIME HOURS TOTAL Project Manager Senior Engineer Staff Engineer Project Engineer Technician Bidding Phase Services Attend Pre -Bid Meeting 0 4 0 0 0 Pre are Addenda 1 4 1 0 0 Answer questions and Issue Addendums 2 4 2 0 0 Evaluation of Bid Award 1 3 0 0 0 Subtotal TOTAL HOURS 4 15 3 0 0 22 WEIGHTED HOURLY RATE $165.26 .33 $78.58 $111.36 $75.64 DIRECT SALARY COST $661.04r!$2 t179.95 $235.74 $0.00 $0,00 $3,076.73 DIRECT COSTS LSee Below $139.10 OTAL FBE $3 215.83 Unit Cost Cost Mileage $0,535 ___QnantLty 260 $139.10 Shipping LSUM 0 $0.00 Meals $26.00 0 $0.00 Lodging $89.00 0 $0.00 Blueprints $1.50 0 Copies $0.10 1 0 $0.00 M tars $3.50 1 0 $0.00 TOTAL= 1 $139.101 Page 1 201401351_DESIGN.South Bend-Misc MHJ AMERICAN STRUCTUREPOINT, INC. Road Design - Manhour Justification Project: South Bend One -Way to Two -Way Conversion Description: Construction Phase - Sample and Main 02-Iun-17 WORK CLASSIFICATION ESTIMATED TIME HOURS TOTAL Project Manager Senior Engineer Staff Engineer Project Engineer Technician Shop Drawing Review 0 2 0 0 0 Attend Preconstruction Meeting 6 6 0 0 0 Answer Questions 2 4 4 0 0 Attend Progress Meetings two 2 8 0 0 0 Subtotal TOTAL HOURS 10 20 4 0 0 34 WEIGHTED IIOURLY RATE $165.26 $145,33 $78.58 $111.36 $75.64 DIRECT SALARY COST $1,652.60 $2,906.60 $314.32 $0.00 $0.00 $4 873.52 DIRECT COSTS See Below $139.10 TOTALFEE $5,012.67 Unit Cost Quanti Cost Mileage $0.535 260 $139.10 Shipping LSUM 0 $0.00 Meals $26.00 0 $0.00 Lodging $89.00 0 $0,00 Blueprints $1.50 0 $0.00 ,Copies $0.10 0 $0,00 M lars $3so o $0.00 TOTAL = $139,10 Page 1 201401351_DESIGN.South Bend..Misc MHJ AMERICAN STRUCTUREPOINT, INC. Traffic Signal Modification - Manhour Justification Project: South Bend 2-way Conversion Description: Traffic Signal Modification Design - Sam to and Main 26-May-17 WORK CLASSIFICATION ESTIMATED TIME (HOURS) TOTAL, Project Manager Senior I Engineer Project Engineer Staff Engineer Senior Technician Technician Final Signal Design Signal Modification Tasks (Per Intersection) Identify Available Signal Equipment 0 2 0 0 0 0 2 Create Intersection Detail Sheet 0 0 0 0 0 0 0 Preliminary Signal Design 0 1 2 4 1 0 8 Preliminary Quantities 0 1 0 2 0 0 3 Check Utility conflicts 0 1 1 0 0 0 2 Final Signal Design 1 1 2 00 6 20 Final Plans for Bid 1 I 2 1:�4 2 4 14 Final Quantities for Signal Items 0 1 t 2 0 0 4 Hours Per Intersection 2 8 8 22 3 10 53 # of Intersections I Signal Modification Tasks Subtotal 2 8 8 22 3 10 53 Signal Removal Tasks (Per Intersection) Field Review and Inventory 0 0 0 0 0 0 0 Create Intersection Detail Sheet 0 0 0 0 0 0 0 Preliminary Signal Design 0 0 0 0 0 0 0 Preliminat Quantities 0 0 0 D 0 0 0 Final Signal Design 0 0 0 0 0 0 0 Final Plans for Bid 0 0 0 0 0 0 0 Final Quantities for Signal Items 1 0 0 0 0 0 0 0 Hours Per Intersection 0 D 0 0 0 0 0 # of Intersections 0 Signal Removal Tasks Subtotal 0 0 0 0 0 0 0 General Tasks Title Sheet* Project Layout Sheet* Benchmarks Sheet* Coordinate Service Points 0 0 0 0 0 0 0 Specifications 0 2 2 0 0 0 4 Contract Book 0 0 0 0 0 0 0 Coordination Meetings 0 0 0 0 0 0 0 Preliminary Cost Estimate 0 0 01 0 0 01 0 Final Cost Estimate 0 I 1 0 0 0 2 Aries Implelentatian &Field Adjustments for 3 Timing Pla 0 0 0 0 0 0 0 General Tasks Subtotal 0 3 3 0 0 0 6 TOTAL. HOURS 2 11 11 22 3 t0 59 WEIGHTED HOURLY RATE $165.26 $145.33 $111.36 $78.58 $112.14 $75.64 DIRECT SALARY COST $330.52 $1,598.63 $1,224.96 $1,728.76 $336.42 $756.40 $5,975,69 DIRECT COSTS (See Below) I I I I I 1 1 $0.o0 TOTAL FEE (ROUNDED TO NEARST $100) $6,000.00 Unit Cost Quantity Cost Mileage $0.565 0 $0.00 Shipping LSUM 0 $0.00 Blueprints $1.50 0 $0.00 Copies 1 $0.10 0 $0.00 Mylars 1 $3.50 1 0 TOTAL W I $0-00 PAUL A. HUMMEL, P.E. PIPER C. TITTLE, P.E, MICHAEL J. GUZIK, P.E. LAWSON-FISHER ASSOCIATES P.C. 9029.90 GREGORY L. HOLDEN, P.E. JON E. RIEMKE, P,E, JEFFREY L. McKEAN, P.E, RANDOLPH J. LINDLEY, P.E, CHRISTOPHER J. JETER, P,E, DENNIS A. ZEBELL, P.E. May 31, 2017 BENJAMIN P. HOLDEN, P.E. DAN G. DELGADO. P.E. MICHAEL F. JOHNSTON, P,E. JEFFREY M. BYRD, P.E. JARED M. HUSS, P.E, Mr. Richard J. Zielinski SKY K. MEDORS, P.E. Project Development Director, Road Group AARON W. BLANK, P.L.S., P.E. American Structurepoint, Inc. BREAGANP.EICHER,P.E. RICHARDA. CHAPMAN, 11, P.E. 7260 Shadeland Station THOMASJ.MeNICHOLAS,P.E. I Indianapolis, IN 46256 KEVIN J. SIEDLECK4, P,E. CHRISTOPHER M. VANHULLE, P.E. MICHELLE M.G. SLACK, P,LS. RE: Eastbound Sample Street Left Turn South Bend, Indiana Topographic Survey and Right of Way Analysis Dear Mr. Zielinski: Lawson -Fisher Associates P.C, (LFA) is presenting a sub -contractor scope of work, manhour justification and scope limit exhibit based upon your request for proposal dated May 24, 2017 and subsequent discussions regarding survey scope. These survey services will support American Structurepoint, Inc. (Structurepoint) as they respond to the City of South Bend, Indiana (CITY) request for professional design services pertaining to a proposed left turn lane at Sample Street and Main Street for eastbound traffic on Sample Street. As requested and attached to this letter, you will find a Scope of Services, a list of Owner Provided Data, a Proposed Schedule, Proposed Fee, Manhour Estimates (Attachments Al and A2), and scope limit exhibit (Attachment B), for submittal to the CITY for consideration. Scope of Services A. LFA shall provide: 1. One time necessary topographic survey and utility representation, for roadway design purposes, within the areas indicated on the attached survey scope map. 2. A recorded Location Control Route Surrey along Sample Street from Lafayette Boulevard to Main Street described below: All of the work above shall be in accordance with Indiana Code (I,C. 25- 21.5); Indiana Administrative Code (865 I.A.C. 1-12), and the Design Manual, Indiana Department of Transportation, Part III, Location Surveys (Survey Manual). If there is any conflict between these guidance documents, the order of precedence shall be: a) I.C.25-21.5 b) 865 I.A.C. 1-12, and c) Survey Manual 525 WEST WASHINGTON AVENUE • SOUTH BEND, INDIANA 46601 •574-234-3167.574-236-133© (FAX) L FAVAVA k Mr. Richard J. Zielinski May 31, 2017 Page 2 S. LFA shall provide the following deliverables: 1. Electronic files including a stand-alone survey base drawing (1-foot contours) in Microstation compatible format. Provided survey data will be supplemental to other completed work and in the same coordinate system. 2. Electronic copy of all field notes. 3. Survey summary language to accompany drawing. 4. Location Control Route Survey Plat in .pdf format. C. This proposal does not include: 1. Updated INDOT-style fieldbook. 2. Additional control monumentation. 3. Revised, overall base drawing of previously surveyed data. 4. Collection of information regarding underground storage tanks. Owner -Provided Data The following items will be provided by Structurepoint through the CITY or otherwise considered an additional service not included with the described professional services. 1. Structurepoint through CITY shall provide any construction plans of any past improvements in their records. 2. it is understood that LFA shall have access to all CITY plans andlor records in its possession and at its disposal pertaining to this work. Proposed Schedule LFA proposes to submit to Structurepoint a supplemental survey drawing and associated deliverables within: 1. 30 calendar days of notice to proceed, for topographic survey deliverables. 2. 60 calendar days of notice to proceed, for Location Control Route Survey Plat. Proposed Fee The LFA fee for the scope of services detailed above is submitted as lump sum as follows: Topographic Survey $1,700.00 Location Control Route Survey Plat $7,000.00 Please indicate your scope selection by initialing next to the requested services. L FAVAVA Mr. Richard J. Zielinski May 31, 2017 Page 3 It is expected that this fee proposal information will be adequate to complete the parent agreement between CITY and Structurepoint. It is also anticipated that Structurepoint's subconsultant agreement will cite, by reference, the terms and conditions of the parent agreement. If you have any questions, please do not hesitate to contact us. Very truly yours, LAWSON-FISHER ASSOCIATES P.C. 4 Michael J. GV21k, P.E. Vice President /1�44 6*ta_' Aaron W. Blank, PLS, P.E. Surveying Manager MJG:AWBIcas Encls. c: Paul A. Hummel, P.E. w/Encls ATTACHMENT'A1' STAFF HOUR JUSTIFICATION -Conventional Survey LAWSON-FISHER ASSOCIATES P.C. PROJECT., Sample at Maio Street 525 WEST WASHINGTON AVENUE Topographic SOUTH SEND, INDIANA 46601 May 30, 2017 No. Work Element STAFF HOURS BY CLASSIFICATION Total Principal LS Suv. Tech, Crew Tech. Survey Tech. Clerical Shis Hours Field Measurements Select, Set, Occupy and Reference Horizontal Control 1 1 2 Select, Set, Occupy and Reference Vertical Control 1 1 2 Topo Measurements 2 2 Data Adjustments, Reduction and Reporting 1 1 Structure Inspections 2 2 4 Generate Deliverable Linework Completion, Labeling, Edit to prior survey limit 1 2 3 Surface Generation 2 2 TOTAL HOURS 0 1 9 4 2 0 16 HOURLY RATE $ 210.00 S 148,00 $ 110.00 $ 90.00 $ 97.00 S 119.00 COSTS 5 - $148.00 1990.00 $360.00 $194.00 $0.00 TOTAL COST $1,692.00 Rounding Function $8.00 TOTAL FEE S1,700.00 U:1Promo19029.90-AMERICAN STRUCTUREPOINT - SAMPLE AND MAIN {TOPO AND BOUNDARY SURVEYIIENG19029.90-MH Justification -Survey ATTACHIIAENVAV STAFF HOUR JUSTIFICATION -Conventional Survey LAWSON-FISHER ASSOCIATES P.C. PROJECT, Sample at Main Street 525 WEST WASHINGTON AVENUE LCRSP SOUTH BEND, INDIANA 46601 May 30, 2017 No. Work Element STAFF HOURS BY CLASSIFICATION Total Principal LS Surv. Tech. I Crew Tech. Surve Tech. Clerical Shts Hours Survey Plan Reseach Control Research Prior Surveys and City Plans 1 I Owners Names, Addresses, and Current Deeds 2 2 Field Measurements Recover Property Comers and Alignment Recon 1 4 4 9 Data Adjustmrnts, Reduction and Reporting 1 2 3 Set alignment points and reference 2 4 4 IO Generate Deliverable RAV Analysis and Resolution 6 6 Property Lime Determinations 2 2 4 Route Survey Plat 1 6 8 2 17 Survey Review QA/QC I 1 I 3 TOTAL HOURS 2 20 10 10 11 2 55 HOURLY RATE IS 210.00 S 148.00 $ 110.00 $ 90.00 $ 97.00 S 119.00 COSTS $ 420.00 $2,960.00 $1,100.00 S900.00 $1.067.00 $238.00 TOTAL MANHOUR COST $6,695.00 DIRECT COSTS $215.35 Rounding Function $99.65 TOTAL FEE $7 000,00 U:1Promo,19029.90-AMERICAN STRUCTUREPOINT- SAMPLE AND MAM (TOPO AND BOUNDARY SURVEY)AENGA9M9.90-MH Justifiiralion - Survey AMERICAN STRUCTUREPOINT, INC. MANHOUR JUSTIFICATION PROJECT: Downtown South Rend Downtown TraHit Signal Rotiming Des No.: City of South Bend, Indiana TITLE WORK CLASSIFICATION PRINCIPAL PROJECT MANAGER SENIOR ENGINEER PROJECT ENGINEER STAFF ENGINEER i TOTAL Field Review Synchro Model PHASE 1 Crash Data Review SIGNAL SYSTEM INVENTORY Preferred Corridor5electiori Document (Memo) Phase 1 Meeting 12 12 24 0 0 0 1 6 12 19 0 0 PHASE 1 TOTAL HOURS 1 0 1 18 0 1 24 43 DIRECT SALARY COST $0.00 $165.42 $2 597.22 $0.00 $1832.64 $4,595.28 DIRECTEXPENSE $4,12.31 PHASE 1 TOTAL COST $5,007.59 Tube Counts (1 per corridor) PHASE TMC Coordination DATA COLLECTION O-D Data Travel Time -Runs 0 0 0 20 20 PHASE 2 TOTAL HOURS 0 0 0 20 0 20 DIRECTSALARY COST $0.00 $0.00 $0.00 $2,235.00 MOO $2235.00. DIRECT EXPENSE $3,307.31 PHASE 2 TOTAL COST $5,542.31 Update Volumes in Synchro Existing Conditions Analysis PHASE 3 Develop Basic Controller Timings ANALYSIS & TIMING Timing Development DEVELOPMENT Documentation (Memorandum) Phase 3 Meeting Database Development 4 8 12 1 3 a 12 24 2 8 10 1 16 24 20 61 0 0 6 10 10 26 PHASE a TOTAL HOURS 0 2 27 46 58 133 DIRECT SALARY COST $0.00 $330.84 $3 895.83 $5140.50 $4 428.88 $13,796.05 DIRECT EXPENSE $0.00 PHASE 3 TOTAL COST $13,796.05 Timing Implementation P14ASE4 Fine Tuning DEPLOYMENT Travel Time -Runs Documentation (Final Report) Project Close out Meeting 20 20 40 24 24 24 72 20 20 2 4 10 24 40 8 8 PHASE 4 TOTAL HOURS 0 2 56 74 48 180 DIRECT SALARY COST $0.00 330.84 $8080.24 $8,269.50 $3,665.28 $20,345.86 DIRECTEXPENSE $1,362.44 PHASE 4 TOTAL C05T $21,708.30 Equipment Set U& Tear Down OPTIONAL SERVICE €!1 TOTAL HOURS (TUBECOUNTSAT3 DIRECTSALARY COST LOCATIONS) DIRECT EXPENSE OPTIONAL SERVICE #1 TOTAL COST 0 0 0 0 0 0 0 0 0 0 0 $ '0 MAN z*' s ✓ �' , $, , „ 212 Equipment Set Up & Tear Down OPTIONALSERVICE #2 TOTAL HOURS {6-HRTMCSAT29LOCATIONS} DIRECT SALARY COST DIRECTEXPENSE OPTIONAL SERVICE g2TOTAL COST 0 0 O 0 0 0 1 0 0 1 D 0 0 $ $000 6 $IJOtJr $RDQ ' Y' 000 ML _c r, l ,... yr a $ 1300 I.,a $„1131f}AOs Equipment Set Up & Tear Down PfocessinZ Data OPTIONAL SERVICE #3 TOTAL HOURS (O-D DATA COLLECTION) DIRECT SALARY COST DIRECT EXPENSE OPTIONAL SERVICE 43 TOTAL COST 22 22 44 2 4 8 14 0 0 2 26 30 58 $ T701233i: $ 32 497 39 TOTAL HOURS 0 5 101 140 130 376 BILLING RATE 18988 165 42 ." $14C29 $11175.: $76 36 DIRECT SALARY COST 0.00 $82710 .. ' 14' 73 29 .. 1S 645:00 $9 926 80 . :: $40 97219 "' DIRECTEXPENSE $5082.i76.r BASE FEE 777.$46,054255= OPTIONAL SERVICES IOi'11ONA VIC£f!1 6pTIONAL.$EKVICEJJ2 yy ", ? TOTAL FEE $A6;0.84;75 Date Name BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM June 30. 2017 er Nawrot Department Public Works BPW Date July 11, 2017 Phone Extension 5932 J Agreement U Contract U Proposal Lj Addendum ® Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Change Order No. ❑ CIO & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control F,1 Other: Amendment No. 1 Company or Vendor Name New Vendor MBEIWBE Contractor MBEIVVBE Contractor Requested Project Name Project Number Funding Source Account No. American Structurepoint, Inc. ❑ Yes ® No ❑ If Yes, Approved by Purchasing F] MBE n WBE ❑ No ❑ Yes Name of Company Additional South Bend Downtown Road, Traffic and Signal Improvements Work 115-019 TIF Bond Amount $114,000.00 Terms of Contract Not to Exceed Purpose/Description Original nal agreement amount was $50,000.00 plus $114,000 increases the total amount to $164,000. The increase is for the field survey, design. and right-of-waV engineering for a left turn lane for eastbound Sample Street at Main Street and the preparation of the _quote package for the sidewalk along Main Street at the Chase Tower. X Required Contractor's Certification Form Attached (Non -Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc. Required ForChan`ge Orders QnI „ Y Amount of ❑ increase $ ❑ Decrease $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Dispersal After Approval Copy Original ❑ ❑ Roger Nawrot