Project No, 116-001
OWNER:
ENGINEER:
CONTRACTOR:
PROJECT:
SUBJECT:
ISSUE DATE:
City of South Bend
Lochmueller Group
Myron Cohagan
Rieth-Riley Construction
South Bend One -Way to Two -Way Street Conversion
Project No. 116-001
Thermal Detection Systems
May 19, 2017
Change Order No. 44-
5119117
This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be
incorporated as an Addendum to the Contract.
The following is a summary and description of the revisions to the Contract by this Change Order:
1. Add thermal imaging detection equipment at the following intersections:
Intersection
Division
Saint Joseph Street & Colfax Street
B
Saint Joseph Street & Wayne Street
B
Michigan Street & South Street
B
Note: This work is not detailed in the plans.
The following sections of the Contract Documents are revised as a result of the above changes:
BIDDING AND CONTRACT REQUIREMENTS-.
Division B:
Revise line Item No. 276: "THERMAL DETECTION CAMERA", from 26 EACH @
$4,680.00/EACH to 34 EACH @ $4,680.00/EACH for a Total Increase of $37,440.00.
Revise Line Item No. 277: "THERMAL DETECTION SYSTEM", from 8 EACH @ $11,800.00/EACH
to 11 EACH @ $11,800,00/EACH for a Total Increase of $35,400.00.
Total Increase for Division B of $72,840.00
The following special provisions have been amended or added to the Contract Documents and are issued as