Loading...
HomeMy WebLinkAboutChange Order No 14 - SB One Way to Two Way Conversion Division B Proj No 116-001 - Rieth Riley Construction'. M. i - ... a .v.:�. . ..�. �: �,r '.t .. �`a � — — _ _ � .� �.,: r-�.�+ ,w Project No, 116-001 OWNER: ENGINEER: CONTRACTOR: PROJECT: SUBJECT: ISSUE DATE: City of South Bend Lochmueller Group Myron Cohagan Rieth-Riley Construction South Bend One -Way to Two -Way Street Conversion Project No. 116-001 Thermal Detection Systems May 19, 2017 Change Order No. 44- 5119117 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Add thermal imaging detection equipment at the following intersections: Intersection Division Saint Joseph Street & Colfax Street B Saint Joseph Street & Wayne Street B Michigan Street & South Street B Note: This work is not detailed in the plans. The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS-. Division B: Revise line Item No. 276: "THERMAL DETECTION CAMERA", from 26 EACH @ $4,680.00/EACH to 34 EACH @ $4,680.00/EACH for a Total Increase of $37,440.00. Revise Line Item No. 277: "THERMAL DETECTION SYSTEM", from 8 EACH @ $11,800.00/EACH to 11 EACH @ $11,800,00/EACH for a Total Increase of $35,400.00. Total Increase for Division B of $72,840.00 The following special provisions have been amended or added to the Contract Documents and are issued as a part of this Change Order: . .0 . w.zY:. J:>,«»<:,<.,.z;2:. 0 J