My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quotation Opening - Olive Street Metronet Conduit - Proj No. 117-021 - C&E Excavating, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Quotation Opening - Olive Street Metronet Conduit - Proj No. 117-021 - C&E Excavating, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:59:17 PM
Creation date
6/9/2017 9:33:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
���OQTA 8e� <br />CITY OF SOUTH BEND, IN®IA A <br />CONTRACTOR'S QUOTE FOR PUBLIC ORIC Y may` <br />I865 c <br />PROJECTNAME: Olive Street Mletronet Conduit <br />PROJECT NO. 117-021 <br />QUOTES DUE .tune 8, 2017 at 10:30 a.m. <br />(Must be completed for all quotes. Please type or print) <br />Date: June 8, 2017 <br />Address: 53767 Countv Road 9 <br />Firm: C 8 E Excavating, Inc. <br />City/State/Zip: Elkhart, lnt46514 Telephone Number: (574 ) 262-4346 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />117-021 Olive St Metronet Conduit <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, De artment of Public Works <br />and dated June 1, 2017 _L for the sum of (enter the Total Quote as shown on the Proposal) <br />One hundred -twenty-seven thousand, three hundred -ninety-five dollars and nol100 ($ 127,395 00 ) <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />it <br />By ✓j' <br />(Signature) <br />Adam Clark <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above quote is accepted this day of <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />Suzanna M. Fritzberg, Member <br />Therese.l. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />20 <br />Version 10/1812016 Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.