Loading...
HomeMy WebLinkAboutChange Order No. 13 - SB One Way to Two Way Conversion Division B Proj No 116-001B - Rieth-Riley Construction Cor-� w EIK a4� of 1.17 W. Lai "!C : G'lp,..jo I Change Order No. 25 One- Way to Two -Way Street Conversion Division B Project No. 116-001 OWNER: City of South Bend ENGINEER: Lochmueller Group Myron Cohagan CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion Division B Project No. 116-001 SUBJECT: Guardrail Removal and Impact Attenuators at CSX RR Bridge along Main Street ISSUE DATE: April21, 2017 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Remove Guardrail in Median and Exterior Lane Along Main Street between Bronson and South Streets at CSX Railroad 2. Install stand-alone Impact Attenuator on each end of median pier to protect the CSX RR Bridge Pier The following sections of the Contract Documents are revised as a result of the above changes: RIDDING AND CONTRACT REQUIREMENTS: 1. Bid/Proposal Form: Division B: Subtract 2 EACH from Line Item No. 80 GUARDRAIL ENDTREATMENT, MS @ $4,700.001EACH for a total change of—($9,400.00). Subtract 2 EACH from Line Item No. 439 GUARDRAIL END TREATMENT, OS @ $2,675.00/EACH for a total change of-($5,350.00). Subtract 4 EACH from Line Item No. 440 CURVED TERMINAL END @ $50.001EACH for a total change of-($200.00). Subtract 939 LFT from Line Item No. 441 GUARDRAIL, W-BEAM, 6'-3" SPACING @ $18.301LFT for a total change of-($17,183.70). Sheet 1 of 3 Change Order No. 25 One- Way to Two -Way Street Conversion Division B Project No. 116-001 Add 1 LSM to Line Item No. EWA 485 MAIN STREET DETOUR AT BRONSON PER PLANS @ $3,407.00/LSM for a total change of $ 3,407.00, Add 1 LSM to Line Item No. EWA 486 CONCRETE REMOVAL & PREP FOR ATTENUATOR PLACEMANT @ $8,064.001LSM for a total addition of $8,064.00. Add 2 EACH to Line Item No. EWA 487 IMPACT ATTENUATOR, R2 W1-LS, TL-1 @ $15,865.00/EACH for a total addition of $31,730.00. SPECIFICATIONS: No Changes DRAWINGS: The following sheets have been revised or issued as new sheets. Division B Part 1 of 3 Revision 20 Sheets 47-1 & 47-2 — Added Sheets for Maintenance of Traffic Plan Sheet 48-B — Deleted Sheet Sheet 48-C — Replaced Sheet; Removed Median & Outside Guardrail, Shifted Attenuators Sheet 231 — Revised Remarks for Structure No. 93 & 97 END OF CHANGE ORDER NO.25 Sheet 2 of 3 5 1 Project No. 116-001 Change Order No. 25 — 4/21I17 Sheet 4 of 3 Change Order No. 43 One- Way to Two -Way Street Conversion Division B Project No. 116-001 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. C. Ryan Huebschman, P.E., PTOE Professional Engineer No. 11400171 CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion Division B Project No. 116-001 SUBJECT: Pavement Markings Adjustments - Various Locations ISSUE DATE: April 17, 2017 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Revise pavement markings to add parking spaces north of the intersection of Michigan Street and Sample Street 2. Add lane indication arrows west of the intersection of Western Avenue and St. Joseph Street. 3. Add pavement markings along Colfax Avenue west of Lafayette Blvd. 4. Realign markings for thru lane and bike lane on Colfax Avenue east of St. Joseph Street. The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONT&ALT REQUIREMENTS: I. Bid/Proposal Form: Division B: Add 1,047 LFT to Line Item No. 328 LINE, REMOVE @ $0.101LFT for a total addition of $104,70, Add 1 EACH to Line Item No. 330 PAVEMENT MESSAGE MARKING, MULTI - COMPONENT, BIKE SYMBOL @ $300.00/EACH for a total addition of $300.00. Add 208 LFT to Line Item No. 331 LINE, THERMOPLASTIC, SOLID, WHITE, 4" @ $1.451LFT for a total addition of $301.60. Sheet 1 of 3 Change Order No. 43 One- Way to Two -Way Street Conversion Division B Project No, 116-001 Add 306 LFT to Line Item No. 332 LINE, THERMOPLASTIC, SOLID, YELLOW, 4" @ $0.45/LFT for a total addition of $137.70. Add 62 LFT to Line Item No. 335 LINE, THERMOPLASTIC, SOLID, WHITE, 6" @ $1.50/LFT for a total addition of $93.00. Add 226 LFT to Line Item No. 340 LINE, MULTI -COMPONENT, SOLID, WHITE, 4" @ $0.65/LFT for a total addition of $146.90. Add 326 LFT to Line Item No. 343 LINE, MULTI -COMPONENT, SOLID, WHITE, 6" @ $1.50/LFT for a total addition of $489.00. Add 23 LFT to Line Item No. 349 TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, 24" @ $5.00/LFT for a total addition of $115,00. Add 3 EACH to Line Item No. 357 PAVEMENT MESSAGE MARKING, THERMOPLASTIC, LANE INDICATION ARROW @ $80.00/EACH for a total addition of $240.00. Add 1 EACH to Line Item No. 358 PAVEMENT MESSAGE MARKING, THERMOPLASTIC, ONLY @ $90.00/EACH for a total addition of $90.00. Add 1 EACH to Line Item No. 359 PAVEMENT MESSAGE MARKING, THERMOPLASTIC, HANDICAP SYMBOL @ $250.00/EACH for a total addition of $250, 00. Add 5 EACH from Line Item No. 360 PAVEMENT MESSAGE MARKING, MULTI - COMPONENT, LANE INDICATION ARROW @ $200.001EACH for a total change Of $1,000.00. Add 7 EACH from Line Item No. 476 PAVEMENT MESSAGE MARKING, REMOVE @ $82.50/EACH for a total change of $577.50, SPECIFICATIONS: No change required. DRAWINGS: The following sheets have been revised or issued as new sheets. Division B Part 1 of 3 Revision 19 Sheets 17, 218 — Deleted Sheet Sheet 17-A — Replaced Sheet; Extended Line "COL" Alignment Sheet 218-A — Replaced Sheet; Added Eastbound Left Turn Lane @ Lafayette Blvd Sheet 200-A, 210, 217 -- Revised Markings & Parking Spots END OF CHANGE ORDER NO. 36 Sheet 2 of 3 . ............ Dt L 21A hLry m