for two (2) years and the specifications required a three (3) year warranty, and their drive system
does not meet the specs. Mr. Gilot noted that would make them a non -responsive bidder.
Change Order — Coquillard Primary Safe Routes to School
Attorney Schmidt questioned this Change Order, noting it was over the 20% threshold. Ms. Kara
Boyles, City Engineer, stated this is the one that was previously on the agenda and taken off to
confirm MACOG was going to participate. She added that has been confirmed. The Board noted
Mr. Kevin Fink, Engineering, gave a detailed explanation at a previous Board meeting.
- Resolution No. 20-2017 — Outlining the Average Daily flow Rates for Sewer Capacity
Certifications
Ms. Boyles explained this resolution covers when calculations for overages are not outlined in
Indiana Code. She noted it includes commercial and industrial heavy users. Ms. Boyles stated the
applicant has the opportunity to provide a capacity certification of their true flow. Attorney
Schmidt stated we just recently received approval from the IURC so we're going to have to make
more decisions on the correct sewer development charge computations. Mr. Gilot questioned if
they are all metered. Mr. Horvath stated they are and there are provisions to allow them six (6)
months to show they have not increased over the maximum allowance, if they go over their
allowed amount. Ms. Boyles noted they have users connecting to the City system that may
already know they are going to exceed the maximum.
Service Agreement — Public Safety Medical
Attorney Schmidt questioned why the Fire Department doesn't use the City's Activate Clinic for
their Firefighter physicals, rather than contracting with another agency. Mr. Horvath noted the
NFPA has guidelines for Fire Departments that Activate can't meet.
BOARD RECESSED
Upon a motion by Mr. Gilot, seconded by Ms. Dorau and carried, the Board recessed at 11:14
a.m. to reconvene at 11:30 a.m. to allow the award of the three (3) Berlin Place bids.
BOARD RECONVENES
The Board reconvened at 11:30 a.m. Mr. Gilot stated the decision was made to not award today.
No other business came before the Board. Therefore, upon a motion by Mr. Mueller, seconded
by Mr. Dorau and carried, the meeting adjourned at 11:31 a.m.
BOARD OF PUBLIC WORKS
Gary A. clot, President
Elizabeth A. Maradik, Member
Therese J./!Dorau, Member
Jam . Mueller, Member
uzanna A fifzbere, Member
ATTEST:
IC�� , I -,
Linda M. Martin, Clerk
REGULAR MEETING MAY 9, 2017
The Regular Meeting of the Board of Public Works was convened at 9:32 a.m. on May 9, 2017,
by Board President Gary A. Gilot, with Board Members James Mueller, Suzanna Fritzberg, and
Therese Dorau present. Board Member Elizabeth Maradik was absent. Also present was Board
Attorney Michael Schmidt.
REGULAR MEETING
MAY 9, 2017 133
L'
APPROVE MINUTES OF PREVIOUS MEETING .
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the Minutes of the
Agenda Review Session, Regular Meeting, Special Meeting, and Claims Review Meeting of the
Board held on April 20, April 25, April 28, and May 2, 2017, were approved.
OPENING OF BIDS — ONE (1) OR MORE, 2017 OR NEWER. COMPACT TRACK LOADER
— SPEC K (VPA CAPITAL)
This was the date set for receiving and opening of sealed bids for the above referenced
equipment. The Clerk tendered proofs of publication of Notice in the South Bend Tribune and
the Tri-County News, which were found to be sufficient. The following bids were opened and
publicly read:
HULL LIFT TRUCK, INC.BOBCAT OF MICHIANA
28747 Old US 33 West
Elkhart, IN 46516
Bid was signed by: Michael Griffy
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Security Check was submitted.
e
Description
Year/Make/Model
Unit Price
Compact Track Loader
I 2017Bobcat/T650
$48,807.73
Year
Make/Model —Trade In
Unit Price
1990
Bobcat Skid Loader, VIN#508611330
$4,000
Alternate #
Description
Cost
Total
1
Standard Bucket with Bolt on Blade
$1,399.58
2
48" pallet forks
$816.25
3
Grapple bucket
$4,551.25
4
Snow Blower with extended chute
$9,199.25
5
Post hole auger
$2,117.25
6
Tiller
$5,596.00
7
Trailer — The following are minimum
specifications for a trailer to haul the above
Skid Steer Loader. Kauffman tilt brakes,
metal deck, plate fenders, 48" ramps,
adjustable tow eye, all lights and safety
equipment to meet DOT standards
$10,868.00
*Estimated Number of Days for Delivery from Award: 45 days
Alternate Proposal
Description
I Year/Make/Model
Unit Price
Compact Track Loader
I 2017/Bobcat/T595
1 $45,880.04
Year
Make/Model — Trade In
Unit Price
1990
Bobcat Skid Loader, VIN#508611330
1 $4,000
Alternate #
Description
Cost
Total
1
Standard Bucket with Bolt on Blade
$1,399.58
2
48" pallet forks
$816.25
3
Grapple bucket
$4,551.25
4
Snow Blower with extended chute
$9,199.25
5
Post hole auger
$2,117.25
6
Tiller
$5,596.00
7
Trailer — The following are minimum
specifications for a trailer to haul the above
$10,868.00
REGULAR MEETING
MAY 9, 2017 134
Skid Steer Loader. Kauffman tilt brakes,
metal deck, plate fenders, 48" ramps,
adjustable tow eye, all lights and safety
equipment to meet DOT standards
*Estimated Number of Days for Delivery from Award: 45 Days
MCCANN INDUSTRIES, INC.
543 S Rohlwing Rd.
Addison, IL 60101
Bid was signed by: Steven Roggeman
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Description
Year/Make/Model
Unit Price
One(1) New Compact Track
Loader
2017/Case/TR310
$44,000.00
Year
Make/Model — Trade In
Unit Price
1990
Bobcat Skid Loader, VIN# 508611330
($4,200.00)
Alternate #
Description
Cost
Total
1
Standard Bucket with Bolt on Blade
$800.00
$40,600.00
2
48" pallet forks
$850.00
$41,450.00
3
Grapple bucket
$3,700.00
$45,150.00
4
Snow Blower with extended chute
$6,200.00
$51,350.00
5
Post hole auger
$1,990.00
$53,340.00
6
Tiller
$4,400.00
$57,440.00
7
Trailer — The following are minimum
specifications for a trailer to haul the above
Skid Steer Loader. Kauffman tilt brakes,
metal deck, plate fenders, 48" ramps,
adjustable tow eye, all lights and safety
equipment to meet DOT standards
$12,500.00
$70,240.00
*Estimated Number of Days for Delivery from Award: 90 days
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the above bids
were referred to Venues, Parks, and Arts and Equipment Services for review and
recommendation.
OPENING OF BIDS — ONE (1) OR MORE 2017 OR NEWER, 3�4 TON EXTENDED CAB
FOUR WHEEL DRIVE PICK UP TRUCK — SPEC L (VPA CAPITAL LEASE)
This was the date set for receiving and opening of sealed bids for the above referenced vehicle.
The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-
County News, which were found to be sufficient. The following bids were opened and publicly
read:
GATES CHEVROLET
636 W McKinley Avenue
Mishawaka, IN 46545
Bid was signed by: Chris Dill
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
1
1
1
REGULAR MEETING
MAY 9, 2017 135
1
Indiana Local Business Preference Form submitted
n
Description
Year/Make/Model
Unit Price
1
2018 Chevrolet 2500 DBL Cab
1 $30,935
Alternate #
Description
Cost
Total
1
Front mounted western 8' pro -plus power angling
$5,192
$5,192
left and right. Plow to come equipped with safety
approved lights and markers, and snow deflector
2
Front mounted Western MVP Plus. Plow to
$5,769
$5,769
come equipped with safety approved lights,
markers, and snow deflector and shoes
3
CNG — Bi-fuel conversion with tanks mounted
$10,750
$10,750
under bed
4
Roof mounted strobe light with controller,
$1,970
$1,970
Federal Signal 53" Legend LPX or equal
*Estimated number of days for delivery from award date: 90 days/ 180 w/CNG
JORDAN FORD
609 E Jefferson Blvd.
Mishawaka, IN 46545
Bid was signed by: Debra Starkweather
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Indiana Local Business Preference Form submitted
Description
I Year/Make/Model
E Unit Price
% Ton Extended Cab
12017 Ford F250 Supercab 4x4 Pick Up
1 $29,509.00 Each
Alternate #
Description
Cost
Total
1
Front mounted western 8' pro -plus power
$5,584.00
$5,584.00
angling left and right. Plow to come equipped
each
each
with safety approved lights and markers, and
snow deflector
2
Front mounted Western MVP Plus. Plow to
$6,089.00
$6,089.00
come equipped with safety approved lights,
each
each
markers, and snow deflector and shoes
3
CNG — Bi-fuel conversion with tanks mounted
$9,840.00
$9,840.00
under bed
each
each
4
Roof mounted strobe light with controller,
$2,431.00
$2,431.00
Federal Signal 53" Legend LPX or equal
each
each
*Estimated number of days for delivery from award date: 85-100 — Does not include any
alternates
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the above bids
were referred to Venues, Parks, and Arts and Equipment Services for review and
recommendation.
OPENING OF BIDS — SEVEN (7), MORE OR LESS 2017 OR NEWER 3/4 TON FOUR-
WHEEL DRIVE PICK-UP TRUCKS — SPEC M (VPA CAPITAL LEASE)
This was the date set for receiving and opening of sealed bids for the above referenced vehicles.
The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-
County News, which were found to be sufficient. The following bids were opened and publicly
read:
REGULAR MEETING MAY 9, 2017 136
JORDAN FORD
609 E Jefferson Blvd.
Mishawaka, IN 46545
Bid was signed by: Debra Starkweather
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Indiana Local Business Preference Form submitted
BID:
Description Year/Make/Model Unit Price
3/a Ton Regular Cab 2017 Ford F250 4x4 XL $26,139.00 each
Alternate #
Description
Cost
Total
1
Front mounted western 8' pro -plus power
$5,584.00
$5,584.00
angling left and right. Plow to come equipped
each
each
with safety approved lights and markers, and
snow deflector
2
Front mounted Western MVP Plus. Plow to
$6,089.00
$6,089.00
come equipped with safety approved lights,
each
each
markers, and snow deflector and shoes
3
CNG — Bi-fuel conversion with tanks mounted
$9,825.00
$9,825.00
under bed
each
each
4
Roof mounted strobe light with controller,
$2,431.00
$2,431.00
Federal Signal 53" Legend LPX or equal
each
1 each
*Estimated number of days for delivery from award date: 85-100 (does not include any
alternates)
GATES CHEVROLET
636 W McKinley
Mishawaka, IN 46545
Bid was signed by: Chris Dill
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Indiana Local Business Preference Form submitted
RTn-
Descri tion Year/Make/Model Unit Price
7 12018 Chevrolet Silverado 2500 1$31,541
Alternate #
Description
Cost
Total
I
Front mounted western 8' pro -plus power
$5,192
$36,344
angling left and right. Plow to come equipped
with safety approved lights and markers, and
snow deflector
2
Front mounted Western MVP Plus. Plow to
$5,769
$40,383
come equipped with safety approved lights,
markers, and snow deflector and shoes
3
CNG — Bi-fuel conversion with tanks mounted
$10,750
$75,250
under bed
4
Roof mounted strobe light with controller,
$1,970
$13,700
Federal Signal 53" Legend LPX or equal
*Estimated number of days for delivery from award date: 90 days/ 180 w/CNU
1
REGULAR MEETING
MAY 9, 2017 137
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the above bids
were referred to Venues, Parks, and Arts and Equipment Services for review and
recommendation.
OPENING OF BIDS - 2017 CURB AND SIDEWALK CONSTRUCTION — PROJECT NO.
117-008 (MVH)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-
County News, which were found to be sufficient. The following bids were opened and publicly
read:
PREMIUM CONCRETE SERVICES
712 Richmond Street
Elkhart, IN 46516
Bid was signed by: Becky Yeaky
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: Division A Total: $119,690.00
Division B Total: $116,264.00
Division C Total: $49,220.00
Division D Total: $172,955.00
Division E Total: $56,985.00
Division F Total: $58,328.00
Project Total — Divisions A-F: $573,442.00
WALSH & KELLY, INC.
24358 SR 23
South Bend, IN 46614
Bid was signed by: Dustin Hilary
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: Division A Total: $109,024.00
Division B Total: $116,131.00
Division C Total: $55,081.00
Division D Total: $178,813.00
Division E Total: $62,979.00
Division F Total: $72,387.75
Project Total — Divisions A-F: $594,415.75
RIETH-RILEY CONSTRUCTION CO., INC.
25200 SR 23
South Bend, IN 46614
Bid was signed by: Joshua McCormick
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: Division A Total: $195,650.00
Division B Total: $142,500.20
REGULAR MEETING MAY 9, 2017 138
Division C Total: $51,287.00
Division D Total: $205,149.25
Division E Total: $65,279.50
Division F Total: $67,248.13
Project Total — Divisions A-F: $727,114.08
SELGE CONSTRUCTION CO., INC.
2833 S 1 lth St
Niles, MI 49120
Bid was signed by: Robert Kuhns
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: Division A Total: $170,082.95
Division B Total: $94,310.05
Division C Total: $42,022.20
Division D Total: $143,468.75
Division E Total: $53,371.90
Division F Total: $56,825.00
Project Total — Divisions A-F: $560,080.85
ZIOLKOWSKI CONSTRUCTION, INC.
4050 Ralph Jones Drive
South Bend, IN 46628
Bid was signed by: Bill Favors
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: Division A Total: $124,189
Division B Total: $67,305
Division C Total: $28,734
Division D Total: $104,138
Division E Total: $27,753
Division F Total: $32,457
Project Total — Divisions A-F: $384,676
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the above bids
were referred to Engineering for review and recommendation.
OPENING OF PROPOSALS — LAWN MAINTENANCE AND MENTORSHIP PROGRAM
(CENTRAL MOWING)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed proposals for
the above referenced project. Attorney Schmidt read the names of the following vendors into the
record, stating the proposals will be reviewed and scored based on a matrix system by a team
made up of Venues, Parks, and Arts representatives:
CARETAKER LANDSCAPING & LAWN
PO Box 324
Michigan City, IN 46360
Proposal submitted by: Kathy & Jeff Pritchard
GREATER IMPACT LAWN CARE
615 Cushing St.
South Bend, IN 46616
1]
1
REGULAR MEETING MAY 9, 2017 139
Proposal submitted by: Kory Lantz
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the above
proposals were referred to the Venues, Parks, and Arts review committee for review, tabulation,
and recommendation.
OPENING OF QUOTATIONS — LEIGHTON PLAZA IMPROVEMENTS, PHASE 2 —
PROJECT NO. 117-054A (SPECIAL DONATIONS)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. Ms. Martin, Clerk of the Board, informed the Board that an
Addendum was issued changing the opening date to May 18, 2017.
OPENING OF QUOTATIONS — RESTROOM UPGRADES AT SOLID WASTE (BUILDING
MAINTENANCE)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for
the above referenced project. The following Quotations were opened and read:
ZIOLKOWSKI CONSTRUCTION, INC.
4050 Ralph Jones Drive
South Bend, IN 46628
Quotation was submitted by Adam Bradley
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was not submitted
QUOTATION: $19,592.00
ASHTON CONSTRUCTION LLC
55790 Apple Road
Osceola, IN 46561
Quotation was submitted by Patrick Ashton
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was not submitted
QUOTATION: $24,006.50
GIBSON-LEWIS, LLC
1001 West 10' Street
Mishawaka, IN 46544
Quotation was submitted by Justin Micola von Furstenrecht
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was not submitted
QUOTATION: $23,159.00
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the above bids
were referred to Solid Waste for review and recommendation.
AWARD BID — ONE (1) OR MORE, 2017 OR NEWER ONE TON FOUR-WHEEL DRIVE
PICK-UP TRUCK — SPEC G (SOLID WASTE CAPITAL LEASE)
Mr. Jeff Hudak, Central Services, advised the Board that on April 11, 2017, bids were received
and opened for the above referenced equipment. After reviewing those bids, Mr. Hudak
recommended that the Board award the contract to the lowest responsive and responsible bidder
Jordan Ford, 609 E Jefferson Blvd., Mishawaka, IN 46545, in the amount of $44,132.00 each
which includes the base bid plus Alternates 2 and 3. Therefore, Ms. Fritzberg made a motion that
the recommendation be accepted and the bid be awarded as outlined above. Mr. Mueller
seconded the motion, which carried.
REGULAR MEETING MAY 9, 2017 140
AWARD BID — THREE (3)MORE OR LESS 2017 OR NEWER, FRONT WHEEL DRIVE
CARGO VANS — SPEC J (WATER WORKS CAPITAL)
Mr. Jeff Hudak, Central Services, advised the Board that on April 25, 2017, bids were received
and opened for the above referenced equipment. After reviewing those bids, Mr. Hudak
recommended that the Board award the contract to the lowest responsive and responsible bidder
Jordan Ford, 609 E Jefferson Blvd., Mishawaka, IN 46545, in the unit price amount of $22,749
for a total of $68,247.00 for three. Therefore, Ms. Fritzberg made a motion that the
recommendation be accepted and the bid be awarded as outlined above. Mr. Mueller seconded
the motion, which carried.
AWARD BID — TEN (10) MORE OR LESS, COMMERCIAL RIDING MOWERS — SPEC H
(VPA CAPITAL PURCHASE AND CAPITAL LEASE)
Mr. Jeff Hudak, Central Services, advised the Board that on April 11, 2017, bids were received
and opened for the above referenced equipment. After reviewing those bids, Mr. Hudak
recommended that the Board award the contract to the lowest responsive and responsible bidder
Rigg's Outdoor Power, 825 Meijer Dr., Mishawaka, IN 46544, in the unit price amount of
$10,200 for a total of $142,800. Therefore, Ms. Fritzberg made a motion that the
recommendation be accepted and the bid be awarded as outlined above. Mr. Mueller seconded
the motion, which carried.
AWARD BID — WESTERN AVENUE CORRIDOR IMPROVEMENTS FROM BENDIX
DRIVE TO OLIVE STREET — PROJECT NO. 115-097 (RWDA TIF)
Mr. Corbitt Kerr, Community Investment, advised the Board that on April 25, 2017, bids were
received and opened for the above referenced project. After reviewing those bids, Mr. Kerr
recommended that the Board award the contract to the lowest responsive and responsible bidder
Selge Construction Co., Inc., 2833 S. IIth Street, Niles, MI, 49120, in the amount of
$2,713,239.25 for the Base Bid and Alternate B. Therefore, Ms. Fritzberg made a motion that the
recommendation be accepted and the bid be awarded as outlined above. Mr. Mueller seconded
the motion, which carried.
TABLE AWARD BID AND APPROVE CONTRACT — BERLIN PLACE NO. 2
ELECTRICAL —PROJECT NO. 117-048E (RWDA TIF)
Mr. Corbitt Kerr, Community Investment, advised the Board that on May 4, 2017, bids were
received and opened for the above referenced project. After reviewing those bids, Mr. Kerr
recommended that the Board award the bid at today's meeting. Mr. Kerr informed the Board that
after further review he is requesting to table the award of the contract at this time. Therefore, Ms.
Fritzberg made a motion that the bid award be tabled. Mr. Mueller seconded the motion, which
carried.
TABLE AWARD BID AND APPROVE CONTRACT — BERLIN PLACE NO. 2
MECHANICAL —PROJECT NO. 117-048M (RWDA TIF)
Mr. Corbitt Kerr, Community Investment, advised the Board that on May 4, 2017, bids were
received and opened for the above referenced project. After reviewing those bids, Mr. Kerr
recommended that the Board award the bid at today's meeting. Mr. Kerr informed the Board that
after further review he is requesting to table the award of the contract at this time. Therefore, Ms.
Fritzberg made a motion that the bid award be tabled. Mr. Mueller seconded the motion, which
carried.
TABLE REJECT BIDS — BERLIN PLACE NO. 2 PLUMBING — PROJECT NO. 117-048P
(RWDA TIF)
Mr. Corbitt Kerr, Community Investment, advised the Board that on May 4, 2017, bids were
received and opened for the above referenced project. After reviewing those bids, Mr. Kerr
recommended that the Board reject all bids at today's meeting. Mr. Kerr informed the Board that
after further review, he is requesting the Board table the rejection of all bids. Therefore, Ms.
Fritzberg made a motion that the bid's rejection be tabled. Mr. Mueller seconded the motion,
which carried.
APPROVE CHANGE ORDER NO. 4 — HARRISON PRIMARY SAFE ROUTES TO SCHOOL
—PROJECT NO. 114-067 (LRSA)
Mr. Gilot advised that Mr. Kevin Fink, Engineering, has submitted Change Order No. 4 on
behalf of INDOT indicating the contract amount be increased by $18,187.88 for a new contract
REGULAR MEETING MAY 9, 2017 141
sum, including this Change Order, in the amount of $1,069,933.05. Upon a motion made by Ms.
Fritzberg, seconded by Mr. Mueller and carried, the Change Order was approved.
APPROVE CHANGE ORDER NO. 5 — COQUILLARD PRIMARY SAFE ROUTES TO
SCHOOL —PROJECT NO. 114-066 (LRSA)
Mr. Gilot advised that Mr. Kevin Fink, Engineering, has submitted Change Order No. 5 on
behalf of INDOT indicating the contract amount be increased by $8,067.63 for a new contract
sum, including this Change Order, in the amount of $611,479.88. Upon a motion made by Ms.
Fritzberg, seconded by Mr. Mueller and carried, the Change Order was approved.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE
SHEET — NEWMAN CENTER SITE DEVELOPMENT — PROJECT NO. 117-060 (REDA TIF)
In a memorandum to the Board, Mr. Rich Estes, Community Investment, requested permission to
advertise for the receipt of bids for the above referenced project. Also presented at this time for
approval and execution was the Title Sheet. Upon a motion made by Ms. Fritzberg, seconded by
Mr. Mueller and carried, the above request to advertise was approved, and the Title Sheet was
approved and signed.
APPROVAL OF REOUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE
SHEET — CENTURY CENTER MASONRY RESTORATION — PROJECT NO. 117-037
(HOTEL/MOTEL TAX)
In a memorandum to the Board, Ms. Tara Weigand, Engineering, requested permission to
advertise for the receipt of bids for the above referenced project. Also presented at this time for
approval and execution was the Title Sheet. Upon a motion made by Ms. Fritzberg, seconded by
Mr. Mueller and carried, the above request to advertise was approved, and the Title Sheet was
approved and signed.
APPROVAL OF REOU$S__T TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE
SHEET — MORRIS PERFORMING ARTS CENTER PHANTOM OF THE OPERA
CHANDELIER SUPPORT INSTALLATION — PROJECT NO. 117-034 (BROADWAY
THEATRE LEAGUE TICKET REVENUE REIMBURSEMENT)
In a memorandum to the Board, Ms. Tara Weigand, Engineering, requested permission to
advertise for the receipt of bids for the above referenced project. Also presented at this time for
approval and execution was the Title Sheet. Upon a motion made by Ms. Fritzberg, seconded by
Mr. Mueller and carried, the above request to advertise was approved, and the Title Sheet was
approved and signed.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS— ONE (1) OR
MORE, 2017 OR NEWER, 40' ARTICULATING BOOM LIFT — SPEC R (VPA CAPITAL
LEASE)
In a memorandum to the Board, Mr. Jeff Hudak, Central Services, requested permission to
advertise for the receipt of bids for the above referenced equipment. Therefore, upon a motion
made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the above request was approved.
ADOPT RESOLUTION NO. 18-2017 — A RESOLUTION OF THE SOUTH BEND BOARD
OF PUBLIC WORKS ON DISPOSAL OF UNFIT AND/OR OBSOLETE PROPERTY
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the following
Resolution was adopted by the Board of Public Works:
RESOLUTION NO. 18-2017
A RESOLUTION OF THE SOUTH BEND BOARD OF PUBLIC WORKS
ON DISPOSAL OF UNFIT AND/OR OBSOLETE PROPERTY
FIREFIGHTER FIRE HELMET AND BOOTS
WHEREAS, pursuant to I.C. 36-9-6-1 et. seq., the Board of Public Works ('Board") has
the duty and authority to have custody, control, use, and to dispose of real and personal property
owned by the City of South Bend, Indiana; and
WHEREAS, IC 5-22-22-6 permits and establishes the procedure for disposal of personal
property which is no longer needed by the City and which is unfit for the purpose for which it
was intended; and
REGULAR MEETING MAY 9, 2017 142
WHEREAS, on May 9, 2017, Firefighter Gene Amor retired from the South Bend,
Indiana, Fire Department after twenty (20) years of service, and the Board of Public Safety of the
City of South Bend, Indiana has determined that he has retired in good standing; and
WHEREAS, Chief Stephen Cox has advised the Board that this Firefighter's fire helmet
and boots ("Property") are of no further use to the Department, are of no practical value, and
have an estimated market value of less than One -Thousand Dollars ($1,000.00); and
WHEREAS, the Board has determined that the Property is worthless as that term is
defined in I.C. 5-22-22-8(b); and
WHEREAS, I.C. 5-22-22 permits and establishes procedures for the disposal of personal
property which is either unfit for the purpose for which it was intended, no longer needed by the
City, or property which is deemed worthless.
NOW, THEREFORE, BE IT RESOLVED by the Board of Public Works of the City of
South Bend, Indiana, as follows:
1. The Property is no longer needed by the City of South Bend, is unfit for the purposes
for which was intended, and has an estimated value of less than One -Thousand
Dollars ($1,000.00).
2. The Property may be demolished, junked or otherwise disposed in a manner
determined by the Fire Chief, including donation to the Firefighter as a token for his
years of service to the City of South Bend.
ADOPTED this 9th day of MAY, 2017.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Gary A. Gilot
s/ Suzanna Fritzberg
s/ Therese J. Dorau
s/ James A. Mueller
ATTEST:
s/Linda M. Martin, Clerk
ADOPT RESOLUTION NO. 19-2017 — A RESOLUTION OF THE SOUTH BEND BOARD
OF PUBLIC WORKS ON DISPOSAL OF UNFIT AND/OR OBSOLETE PROPERTY
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the following
Resolution was adopted by the Board of Public Works:
RESOLUTION NO.19-2017
A RESOLUTION OF THE SOUTH BEND BOARD OF PUBLIC WORKS
ON DISPOSAL OF UNFIT AND/OR OBSOLETE PROPERTY
FIREFIGHTER FIRE HELMET AND BOOTS
WHEREAS, pursuant to I.C. 36-9-6-1 et. seq., the Board of Public Works ('Board") has
the duty and authority to have custody, control, use, and to dispose of real and personal property
owned by the City of South Bend, Indiana; and
WHEREAS, IC 5-22-22-6 permits and establishes the procedure for disposal of personal
property which is no longer needed by the City and which is unfit for the purpose for which it
was intended; and
WHEREAS, on May 9, 2017, Firefighter Tom Kowalski retired from the South Bend,
Indiana, Fire Department after twenty (20) years of service, and the Board of Public Safety of the
City of South Bend, Indiana has determined that he has retired in good standing; and
REGULAR MEETING MAY 9, 2017 143
WHEREAS, Chief Stephen Cox has advised the Board that this Firefighter's fire helmet
and boots ("Property") are of no further use to the Department, are of no practical value, and
have an estimated market value of less than One -Thousand Dollars ($1,000.00); and
WHEREAS, the Board has determined that the Property is worthless as that term is
defined in I.C. 5-22-22-8(b); and
WHEREAS, I.C. 5-22-22 permits and establishes procedures for the disposal of personal
property which is either unfit for the purpose for which it was intended, no longer needed by the
City, or property which is deemed worthless.
NOW, THEREFORE, BE IT RESOLVED by the Board of Public Works of the City of
South Bend, Indiana, as follows:
3. The Property is no longer needed by the City of South Bend, is unfit for the purposes
for which was intended, and has an estimated value of less than One -Thousand
Dollars ($1,000.00).
4. The Property may be demolished, junked or otherwise disposed in a manner
determined by the Fire Chief, including donation to the Firefighter as a token for his
years of service to the City of South Bend.
ADOPTED this 9th day of MAY, 2017.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Gary A. Gilot
s/ Suzanna Fritzberg
s/ Therese J. Dorau
s/ James A. Mueller
ATTEST:
s/Linda M. Martin, Clerk
ADOPT RESOLUTION NO. 20-2017 — A RESOLUTION OF THE CITY OF SOUTH BEND
INDIANA, BOARD OF PUBLIC WORKS, OUTLINING THE AVERAGE DAILY FLOW
RATES FOR SEWER CAPACITY CERTIFICATIONS
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the following
Resolution was adopted by the Board of Public Works:
RESOLUTION NO.20-2017
A RESOLUTION OF THE CITY OF SOUTH BEND, INDIANA,
BOARD OF PUBLIC WORKS,
OUTLINING THE AVERAGE DAILY FLOW RATES FOR SEWER CAPACITY
CERTIFICATIONS
WHEREAS, on October 25, 2016, the South Bend Common Council ("Council") adopted
Ordinance No. 10461-16, which established a system development charge based on Equivalent
Residential Units ("ERU") and on January 23, 2017 reaffirmed the Ordinance through Ordinance
No. 10496-17; and
WHEREAS, the system development charge is equal to $1,145 per ERU; and
WHEREAS, the wastewater average daily flow rate ("Average Flow") is used to
calculate the ERU; and
WHEREAS, the Average Flow is a calculation based on estimations located in Indiana
Administrative Code 327 IAC 3-6-11 ("Administrative Code"); and
WHEREAS, the customer seeking to connect to the City of South Bend ("City")
municipal sewer works must provide an Average Flow to the City; and.
REGULAR MEETING MAY 9, 2017 144
WHEREAS, the Administrative Code does not contemplate each and every possible
commercial or industrial Average Flow; and
WHEREAS, the following zoning classifications and flow rates, based on the average
flow rates listed in the treatise Wastewater Engineering: Treatment, Disposal, and Reuse by
Metcalf & Eddy, Inc. 1991, will be used to determine Average Flow:
Commercial (Office/Retail): 1150 gal/acre/day
Light Industrial: 1250 gal/acre/day
Heavy Industrial: 2250 gal/acre/day
WHEREAS, for zoning classifications not specifically defined as "Light Industrial", the
"Heavy Industrial" designation shall be used; and
WHEREAS, in order to deviate from the abovementioned flow rates, the City shall
require certification from an Indiana licensed engineer or architect as to the expected flow rate.
NOW, THEREFORE, BE IT RESOLVED, that the above mentioned average daily flow
rates shall be utilized when calculating sewer system development charges.
ADOPTED the 91h day of May, 2017.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Gary A. Gilot
s/ Suzanna Fritzberg
s/ Therese J. Dorau
s/ James A. Mueller
ATTEST:
s/Linda M. Martin, Clerk
ADOPT RESOLUTION NO 20-2017 — A RESOLUTION OF THE CITY OF SOUTH BEND,
INDIANA BOARD OF PUBLIC WORKS, OUTLINING THE AVERAGE DAILY FLOW
RATES FOR SEWER CAPACITY CERTIFICATIONS
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the following
Resolution was adopted by the Board of Public Works:
RESOLUTION NO.20-2017
A RESOLUTION OF THE CITY OF SOUTH BEND, INDIANA,
BOARD OF PUBLIC WORKS,
OUTLINING THE AVERAGE DAILY FLOW RATES FOR SEWER CAPACITY
CERTIFICATIONS
WHEREAS, on October 25, 2016, the South Bend Common Council ("Council") adopted
Ordinance No. 10461-16, which established a system development charge based on Equivalent
Residential Units ("ERU") and on January 23, 2017 reaffirmed the Ordinance through Ordinance
No. 10496-17; and
WHEREAS, the system development charge is equal to $1,145 per ERU; and
WHEREAS, the wastewater average daily flow rate ("Average Flow") is used to
calculate the ERU; and
WHEREAS, the Average Flow is a calculation based on estimations located in Indiana
Administrative Code 327 IAC 3-6-11 ("Administrative Code"); and
WHEREAS, the customer seeking to connect to the City of South Bend ("City")
municipal sewer works must provide an Average Flow to the City; and.
WHEREAS, the Administrative Code does not contemplate each and every possible
commercial or industrial Average Flow; and
REGULAR MEETING
MAY 9, 2017 145
WHEREAS, the following zoning classifications and flow rates, based on the average
flow rates listed in the treatise Wastewater Engineering: Treatment, Disposal, and Reuse by
Metcalf & Eddy, Inc. 1991, will be used to determine Average Flow:
Commercial (Office/Retail): 1150 gal/acre/day
Light Industrial: 1250 gal/acre/day
Heavy Industrial: 2250 gal/acre/day
WHEREAS, for zoning classifications not specifically defined as "Light Industrial", the
"Heavy Industrial" designation shall be used; and
WHEREAS, in. order to deviate from the abovementioned flow rates, the City shall
require certification from an Indiana licensed engineer or architect as to the expected flow rate.
NOW, THEREFORE, BE IT RESOLVED, that the above mentioned average daily flow
rates shall be utilized when calculating sewer system development charges.
ADOPTED the 9th day of May, 2017.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Gary A. Gilot
s/ Therese J. Dorau
s/ James A. Mueller
s/ Suzanna M. Fritzberg
ATTEST:
s/Linda M. Martin, Clerk
APPROVAL OF AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
The following Agreements/Contracts/Proposals/Addenda were submitted to the Board for
approval:
Type
Business
Description
Amount/
Motion/
Funding
Second
Amendment to
ESRI, Inc.
Data Interoperability
$3,000 per Year
Fritzberg/Mueller
License
Extension
for Years Two
Agreement
(2) and Three (3)
of Existing
Three (3) Year
Contract
(IT Operating )
Professional
H.J.
Review of Continuing
Standard Hourly
Fritzberg/Mueller
Services
Umbaugh &
Disclosures on Bonds
Billing Rates by
Agreement
Associates
During Prior Years
Job
Classification
(COIT,
Professional
Services)
Service
Public
2017 Firefighters'
Billed Per
Fritzberg/Mueller
Agreement
Safety
Annual Physicals
Test/Per
Medical
Employee
(Fire Personnel
Services)
Professional
Abonmarche
Traffic Impact Study for
NTE $10,000
Fritzberg/Mueller
Services
Consultants,
Eddy Street
(REDA TIF)
Agreement
Inc.
Development
Professional
John Jay
Provide Training, Local
$25,000, NTE
Fritzberg/Mueller
Services
College of
Capacity Development,
$50,000 for Two
Agreement
Criminal
Process Enhancement
(2) Years
Justice
and Strategic Advising
(Innovation and
and Support
Technology
REGULAR MEETING MAY 9, 2017 146
Professional Services in
Professional
Support of the South
Services)
Bend Group Violence
Intervention
Service
Hach
On -Site Service,
$13,614
Fritzberg/Mueller
Agreement
Calibration and
(Wastewater
Replacement Parts for
O&M)
Hach Process Control
Analyzers
Fleet Partner
Clean Fuels
Central Services to Test
N/A
Fritzberg/Mueller
Agreement
Ohio
Drive Electric Vehicle
through the U.S.
Department of Energy's
Demonstration Project
"Midwest DRIVES
Initiative" for Ten (10)
Days and provide
Feedback
Professional
Abonmarche
Field Survey,
NTE $19,800
Fritzberg/Mueller
Services
Consultants,
Geotechnical
(Engineering
Agreement
Inc.
Investigation, Design
Professional
and Construction
Services)
Documents for
Ameritech Drive South
of Cleveland Road
Amendment to
Hewlett-
Changes in Price to
Monthly
Fritzberg/Mueller
Master Lease
Packard
Schedule 14.
Decrease of
Financial
($24.31); Total
Services
Decrease:
Company
($1,137.50)
(IT Lease)
Lease Renewal
Charles S
Renew Tower Antenna
$5,856.17
Fritzberg/Mueller
Hayes, Inc.
Space Rental used for
Annually
Back -Up
(Police
Communications in an
Department
Emergency
General Fund)
APPROVAL OF PERMIT AND LICENSE APPLICATIONS
The following permit and license applications were presented for approval:
Applicant
Description
Date/Time
Location
Motion
Carried
The Well at
Block Party —
May 30, 2017;
251h St. from
Fritzberg/Mueller
River Park
Non -Residential
5:00 p.m. to
Mishawaka Ave. to
Grace
— Comic Con at
8:00 p.m.
Vine Street
the Well
La Casa de
Block Party —
May 31, 2017;
Western Ave. from
Fritzberg/Mueller
Amistad
Non -Residential
11:00 a.m. to
Camden to Bendix
- Best
8:00 p.m.
Drive
Wednesday Ever
St. Joseph
Block Party —
May 31, 2017;
St. Louis Blvd. from
Fritzberg/Mueller
Grade School
Non -Residential
8:00 a.m. to
Colfax to LaSalle
- St. Joseph
2:30 p.m.
Grade School
Field Day
YMCA of
Procession - 3 for
September 24,
On route as
Fritzberg/Mueller
Michiana, Inc.
3 Triathlon
2017; 6:30 a.m.
submitted
to 12:00 p.m.
South Bend
Procession -
May 29, 2017;
On route as
Fritzberg/Mueller
Westside
South Bend
5:30 a.m. to
submitted
Memorial Day
Westside
12:00 p.m.
Parade
Memorial Day
Parade
11
1
1
REGULAR MEETING
MAY 9, 2017 147
1
South Bend
Procession - The
May 30, 2017;
On route as
Fritzberg/Mueller
City Church
Belly Burst
5:30'p.m. to
submitted
8:00 p.m.
Frank's Place
Sidewalk Cafe
Sunday to
327 W Marion St.
Fritzberg/Mueller
Saturday,
Subject to not
11:00 a.m. to
blocking
11:00 P.M.
sidewalk with
fence or
exit/entrance
door of
establishment
The View
Sidewalk Cafe
Monday
515 E Jefferson
Fritzberg/Mueller
Tavern
through
Blvd.
Subject to 5'
Saturday,
clear pedestrian
11:00 a.m. to
sidewalk
10:00 p.m.;
Sunday, 1:00
P.M. to 10:00
p.m.
Chicory Cafe
Temporary
Temporarily move
Fritzberg/Mueller
Sidewalk Cafe
existing Sidewalk
Cafe to Michigan
Street during
Construction on
Jefferson Blvd.
Washington
Occupancy
September
North Side of W.
Fritzberg/Mueller
Square
Permit
2017 on Main
Washington St.
Development,
St. and
between the
LLC
December
Southeastern Corner
2017 on
of the Existing PNC
Washington St.
Bank Lot to the
Corner of W.
Washington St. and
Main St.; West Side
of Main St. between
the Southwestern
Corner of the
Building on Main
and Washington to
the North Side of the
Building Property
Line along Main St.
DENY TRAFFIC CONTROL DEVICES
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the following
traffic control devices were denied:
NEW INSTALLATION: Handicapped Accessible Parking Space Sign
LOCATIONS: 525 S 26t' Street
939 S 27t' Street
REMARKS: All criteria has not been met; better access available
APPROVE TRAFFIC CONTROL DEVICES
Upon a motion made by Ms. Fritzberg, seconded by Mr. Mueller and carried, the following
traffic control devices were approved:
NEW INSTALLATION:
LOCATION:
REMARKS:
NEW INSTALLATION:
LOCATION:
Two (2), 15-Minute Loading Zone Signs
East Side of Duey St., South of Napoleon
All criteria has been met
Stop Signs
Columbia Street at Calvert Street
REGULAR MEETING
MAY 9, 2017 148
REMARKS: All criteria has been met
RATIFY REDUCED SENIOR TRASH RATES
Ms. Emily Leyes, Water Works, requested per Municipal Code 16-6, and after verification of
eligibility by Water Works staff, the Board ratify the following reduced trash rates for senior
customers at:
1.
1705 S 35th St.
2.
1825 Brookmede Dr.
3.
605 S. Albert Ave
4.
5210 Redbud Ln.
5.
1914 E. Ewing Ave.
6.
1137 N. Adams St.
7.
6704 Hillenbrand Dr.
Upon a motion by Ms. Fritzberg, seconded by Mr. Mueller and carried, the above senior rates
were ratified.
APPROVE CLAIMS
Ms. Fritzberg stated that a request to pay the following claims in the amounts indicated has been
received by the Board; each claim is fully supported by an invoice; the person receiving the
goods or services has approved the claims; and the claims have been filed with the City Fiscal
Officer and certified for accuracy.
Name
Amount of Claim
Date
City of South Bend
$5,406,241.59
05/05/2017
City of South Bend
$3,023,138.95
05/09/2017
City of South Bend
$2,674,262.71
04/30/2017
City of South Bend Non -Check Disbursement Listing
$34,724.86
05/04/2017
Centier Bank/Thieneman Construction; Retainage on
WWTP Secondary Treatment Improvements
$216,131.64
05/05/2017
U.S. Bancorp & U.S. Bank National; Trash Containers
$39,880
05/03/2017
U.S. Bank National Assoc.; 2015 EDIT/Parks Bond;
Requisition No. 40
$73,900.57
05/03/2017
U.S. Bancorp & U.S. Bank National Assoc.; Front
Load Container
$8,675
05/03/2017
U.S. Bancorp & U.S. Bank National Assoc.; Trash
Container Lids
$5,700
05/03/2017
U.S. Bank National Association; Smart Streets Bond/
Requisition No. 66
$311,742.02
05/04/2017
Therefore, Mr. Mueller made a motion that after review of the expenditures, the claims be
approved as submitted. Ms. Fritzberg seconded the motion, which carried.
ADJOURNMENT
There being no further business to come before the Board, upon a motion made by Mr. Mueller,
seconded by Ms. Dorau and carried, the meeting adjourned at 10:20 a.m.
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
��q'
Elizabeth A. Maradik, Member
Therese J. Do em er
I---
Jame A. Mueller, Member
L
Fj
REGULAR MEETING MAY 9, 2017 149
ATTEST:
Linda M. Martin, Clerk
F
1141 Cf.
Suzanna r' zberg, em