HomeMy WebLinkAboutAuthorizing acceptance of a grant offer by the Environmental Protection Agency, designating the signatory by name and title and providing assurances required as a consideration in the grant offer RESOLUTION
,vu. 270-71
Passed by the Common Council of the City of South Bend, Indiana,
April 2, 19 71
Attest: Ci Jerk
Attest: �1'�— President of Common Council.
Presented by me to the Mayor of the City of South Bend, Indiana
19
Ci Clerk
Approved and signed by me 19
Mayor
RESOLUTION NO. 270-71
A RESOLUTION AUTHORIZING ACCEPTANCE OF A GRANT
OFFER BY THE ENVIRONMENTAL PROTECTION AGENCY,
DESIGNATING THE SIGNATORY BY NAME AND TITLE AND
PROVIDING ASSURANCES REQUIRED AS A CONSIDERATION
IN THE GRANT OFFER.
WHEREAS, the City of South Bend is considering the construc-
tion of certain sewage works improvements, and
WHEREAS, pursuant to an Act of Congress commonly referred
to as Public Law 660, Federal funds are available in the form of an
outright grant for certain stream pollution abatement projects, and
WHEREAS, the Federal Environmental Protection Agency has
sent a grant offer in the amount of $3, 060, 250.00 to the City of
South Bend for the purpose of sewage works improvements; and
WHEREAS, the said Agency requires that said grant offer be
either accepted or rejected by the duly authorized representative of
the City of South Bend on or before the 12th day of April, 1971; and
WHEREAS, the said Agency also requires certain assurances be
made by the South Bend Common Council as a condition to the grant offer,
NOW, THEREFORE, BE IT RESOLVED BY THE COMMON COUNCIL OF THE
CITY OF SOUTH BEND, INDIANA:
1. That Lloyd M. Allen, Mayor of the City of South Bend,
is hereby authorized by the Common Council of the City of South Bend,
to accept the grant offer of the Environmental Protection Agency
for sewage works improvements;
2. That Lloyd M. Allen, Mayor of the City of South Bend,
Indiana, be and he hereby is authorized to sign such documents as may
be necessary, including the offer and acceptance form, as the repre-
sentative of the Common Council and the City of South Bend in all
matters pertaining to the sewage works improvements;
3. That, actual construction work will be performed by the
lump sum (fixed price) or unit price contract method; that adequate
methods of obtaining competitive bidding will be employed prior to
awarding the construction contract; and that the award of the contract
will be made to the responsible bidder submitting the lowest acceptable
bid;
4. That the project will not be advertised or placed on the
market for bidding until the final plans and specifications have been
approved by the Commissioner of the Water Quality Office and the
appropriate State agency, and the City of South Bend has been so
notified; and
5. That the construction contract will require the contractor
to,-furnish performance and payment bonds, the amount of which shall
each be in an amount not less than fifty percentum (50%) of the contract
price, and to maintain during the life of the contract adequate fire,
and extended coverage, workmen' s compensation, public liability and
property damage insurance;
6. That any change or changes in the contract which make
any major alteration in the work required by the plans and specifica-
tions, or which raise the cost of the project above the latest estimate,
approved by the Commissioner of the Water Quality Office, will be
submitted to the Commissioner for prior approval;
7. That the construction of the project, including the
letting of contracts in connection therewith, shall conform to the
applicable requirements of State and local laws and ordinances;
8. That the construction contract will provide that the
representatives of the Water Quality Office and the State will have
access to the work wherever it is in preparation or progress and that
the contractor will provide proper facilities for such access and
inspection;
9. That the City of South Bend will provide and maintain
competent and adequate engineering supervision and inspection at the
project to insure that the construction conforms with the approved
plans and specifications;
10. That adequate accounting and fiscal records will be
maintained which fully disclose the amount, receipt, and disposition
of the grant assistance provided, the total cost of the project in
connection with which the grant has been offered, the amount and identi-
fication of that portion of the cost of the project supplied from
other sources, and such other records as the Commissioner may prescribe
to facilitate an effective audit;
11. That all funds granted pursuant to the Federal Water
Pollution Control Act shall be expended solely for carrying out the
approved project;
12. That the Commissioner and the Comptroller General of the
United States, or any of their duly authorized representatives, shall
have access for the purpose of audit and examination to any books,
documents, papers and records of the grantee that are pertinent to
grants received under the Act, and the grantee shall submit to the
Commissioner of the Water Quality Offices or the Comptroller General
of the United States such documents and information as they may require
in connection with the project;
13. That the construction contract will require the contractor
to comply with the regulations of the Secretary of Labor made pursuant
to the Davis-Bacon Act of March 3, 1931, as amended (40USC276a through
276a-5) , The Anti-Kickback Act of June 13, 1934 (40USC276c) , and the
Contract Work Hours Standards Act of August 13, 1962 (40USC327-330) ,
and any amendments or modifications thereto, to cause appropriate prc
visions to be inserted in subcontracts to insure compliance therewith
by all subcontractors subject thereto, and to be responsible for the
submission of statements required of subcontractors thereunder, except
as the Secretary of Labor may specifically provide for reasonable
limitation, variations, tolerances, and exemptions from the requirements
thereof;
-2-
14. That the City of South Bend will demonstrate to the
satisfaction of the Commissioner its ability to pay the remaining
cost of the project;
15. That the City of South Bend will demonstrate to the
satisfaction of the Commissioner that it has or will have a fee simple
or such other estate or interest in the site of the project, includ-
ing necessary easements and rights-of-way, as the Commissioner finds
sufficient to assure undisturbed use and possession for the purposes
of construction and operation for the estimated life of the project;
16. That the declarations, assurances, representations and
statements made by the City of South Bend in the application, and all
documents, amendments and communications filed with the Water Quality
Office by the City of South Bend in support of its request for a
grant, will be fulfilled;
17. That the City of South Bend will permit the Water Quality
Office or its authorized agents to have access to the project and the
records pertaining to its operation at any reasonable time following
completion of construction for the purpose of inspecting the operation
and maintenance of the project;
18. That the City of South Bend agrees to construct the
project or cause it to be constructed to final completion in accordance
with the application and plans and specifications approved by the
Commissioner;
19. That the City of South Bend agrees to provide a sign for
identification of this project in accordance with specifications to
be furnished by the Water Quality Office;
20. That the facility will be maintained and operated in
accordance with such requirements as the Commissioner may publish
from time to time concerning methods, techniques, and practices for
economic, efficient, and effective operation and maintenance of treat-
ment works;
21. That the City of South Bend hereby assures the Water
Quality Office that it will comply with regulations relating to basin
plans, regional or metropolitan plans, industrial waste treatment,
and design of waste treatment plants in accordance with paragraphs
601.32, 601.33, 601.34, and 601.36 as published in the Federal Register
on July 2, 1970;
22. That the City of South Bend will implement a study
leading to recommendations for correction of the problem of high infil-
tration rate in the low area in the western part of the city;
23 . That the project will be ready for construction within
90 days of acceptance of the grant offer;
24. That the City of South Bend will authorize its consult-
ing engineer to prepare an operation manual describing the functions
-3-
and controls for each process in the specific plant, plus physical
and laboratory controls, maintenance and personnel requirements
necessary to operate the facility at maximum effectiveness;
25. That the City of South Bend agrees to abide by the
recommendations of the operation manual as approved by the State and
the Water Quality Office;
26. That the City of South Bend will authorize its consult-
ing engineer to provide on-the-job training to instruct plant employees
in the operation of equipment, coordination of the laboratory with
plant controls, and other functions for which plant personnel will be
responsible. This training will include the initial "start-up"
phase;
27. That the City of South Bend shall within 30 days of
acceptance of the grant offer, prepare and submit a statement based
on an evaluation of the impact of this specific project on the environ-
ment in accordance with P. L. 91-190;
28. That the existing treatment plant will continue in
operation and provide treatment at least equal to existing treatment
until such time as the new treatment facilities are placed in
operation;
29. That action will be taken to correct existing infiltra-
tion including the enactment of an enforceable sewer use ordinance
to eliminate existing and prohibiting future clear water connections
to separate sanitary sewers, and that prior to discharge to public
sewers all industrial wastes be pretreated to a level of strength and
toxicity amenable to treatment with do stic waste or otherwise be
excluded from the sewerage system.
Member 6f the Common Council
1st & 2nd READING 4-2-71
COMMITTEE OF THE WHOLE
PUBLIC HEARING 4-2-71
3rd READING
NOT APPROVED
REFERRED
PASSED 4-2-71
FILED IN CLERK'S OFFICE
-4- MAR 3 Q 19 71
KATHRYN L. BLOUGH
CITY CLERK, SOUTH BEND, IND.
i
arni
! y� CIV CITY OF SOUTH BEND
' •r1Vc; SOUTH BEND, INDIANA
LLOYD S. TAYLOR P.E.
CITY ENGINEER
COUNTY-CITY BUILDING
SOUTH BEND. IND. 46621 March 25, 1971
AREA 219 284-9251
r
MEMO TO: Members of the Common Council
SUBJECT: Wastewater Treatment Plant Expansion
As announced by Mayor Allen, the city has received an offer from the Environmental
Protection Agency of the Federal Government to assist in financing the construction r
of the Wastewater Treatment Plant Expansion. Their participation is in the amount
of $3,060,250.00 which results from a 50 percent grant of the original application
plus a 10 percent bonus because of MACOG and our compliance with a regional plan.
To avail ourselves of this offer, two items must be accomplished by April 12, 1971 .
First, the grant offer must be accepted by the Mayor. Secondly, a resolution must
be adopted by the Common Council which assures the Federal Government that certain
.procedures will be followed and standards will be met.
As you may have noted, the deadline for the receipt of the accepted grant offer
at the federal office is the same day as the next regularly scheduled meeting of
the Common Council . Therefore, Mr. Robert Laven, President of the Common Council ,
has scheduled a special meeting of the Common Council on Friday, April 2, 1971 at
9:00 A. M. in the Council Chambers to consider this resolution. Prior to this
formal meeting, a caucus meeting is scheduled for Monday evening , March 29, 1,971
at 7:30 P. M. in the Council Caucus room. At this informal meeting, we plan to
have a representative of Bache and Company to discuss the problems associated with
page 2.
the bond issues that the city must issue for this project. Also, representatives
of Clyde Williams and Associates , the consulting engineer on this project, are
expected to attend. Finally, the Board of Public Works and Safety will be represented.
For your information, a table indicating the amount of participation of the three
government organizations is enclosed. As may be noted, the local participation is
much in excess of 25 percent of the total project cost due to increased costs and
additional equipment that was found to be required after the original request was
made. The total project cost has increased primarily due to inflation, as only about
10 percent of the increase is due to additional equipment.
In addition, we plan to have a copy of the proposed resolution in your hands as soon
as possible so that you may have a reasonable time for review.
Finally, let me encourage you to participate actively in this project. Timing is
! vital and critical to this undertaking. The alternatives to accepting this offer are
almost too grim to contemplate. For this reason, please make every effort to attend
these meetings.
Very truly yours,
�J
David A. Wells
DAW/mkm
r
At
ESTIMATED COSTS - FEBRUARY 1971
CONSTRUCTION $ 6,900,000
TECHNICAL SERVICES 558,900 7
LEGAL & FISCAL 44,850
CONTINGENCY 345,000
TOTAL PROJECT COST o
75
FEDERAL PARTICIPATION
1
ORIGINAL TOTAL PROJECT COST 5,565,600
AMOUNT ELIGIBLE FOR FEDERAL CONSIDERATION 5,564,100
50 OF ELIGIBLE AMOUNT 2,782,050
10% OF $2,782,050 DUE TO MACOG 278,200
TOTAL FEDERAL GRANT 3,060,250
STATE PARTICIPATION
25 OF AMOUNT ELIGIBLE FOR FEDERAL
CONSIDERATION 1 ,391 ,025
APPROPRIATED-FISCAL 1970-1971 350,000
BALANCE-FISCAL 1971-1972 1 ,041 ,025
TOTAL STATE GRANT 1 ,391 ,025
CITY PARTICIPATION
TOTAL PROJECT COST MINUS STATE & FEDERAL
FUNDS (REVENUE BONDS) 3,397 ,475
FUNDS TO COVER STATE PARTICIPATION WHICH
HAS NOT BEEN APPROPRIATED TO DATE
(SHORT TERM BONDS) 1 ,041 ,025
i
TO: MEMBERS OF THE COMMON COUNCIL
We, the undersigned, wish to express our belief and con-
cern that the city of South Bend should move forward with the greatest possi-
ble haste in expanding its waste treatment facility. We feel that the rapidly
increasing demands of a growing city, and the urgent need to reverse the pol-
lution of our environment, dictates that we accept the federal grant available
to us and proceed with the expansion program as mandated by the Indiana Stream
Pollution Control Board. "
V► ti!/rJ _
H
� J �
My name is Robert J. Richardson and I reside at 5030 West Washington,
South Bend. I am a registered professional engineer and land surveyor.
I am part owner of the Consulting Engineering firm of Engineering
Planning Services, Inc. of Mishawaka, Indiana. I am here today in the
capacity of President of the St . Joseph County Indiana Chapter of
Michiana Watershed, Inc .
This is a group of concerned citizens interested in conserving our
local natural resourses along with correcting deficiencies and improv-
ing conditions that will directly benefit our local environment. Since
the improvements proposed for the South Bend Wastewater Treatment Plant
fall under this general catagory of concern, we of the St. Joseph County
Chapter of Michiana Watershed, Inc. strongly urge passage of the neces-
sary resolutions that will implement the construction of proposed im-
provements to the South Bend Wastewater Treatment Plant.
w
My name is John Derksen and I am Chairman of the Board of Supervisors
of the St. Joseph County Soil and Water Conservation District. This
unit of government is concerned with the conservation and wise use of all our
natural resources. Our District includes all of St. Joseph County, both
rural and urban areas. During the last few years we have been very
active in promoting comprehensive water resource planning in the
upstream watershed areas within our county. These watershed plans are
concerned with both the quality and quantity of the Water resource.
We realize that all of our work in the upstream areas will be much less
important if we allow the water quality in our major streams to
deteriorate. We sincerely hope that this body will do all in its
power to improve the water quality in our beautiful St. Joseph River,
one of our most important natural resources.
R E S O L U T I O N
The St. Joseph County Health Department and the
Board of Health of the St. Joseph County Health Department
do hereby urge the Common Council of the City of South
Bend to accept the recently offered grant from the
Government of the United States of America for improvements
to be made to the South Bend Waste Water Treatment Plant.
GEORGE PLAIN, M.D. , RICHARD
SCHAPHORST, M.D. , LEO ARVIN,
MRS . EVELYN HENNESSY) JAMES
HERRING, E. N. LIPETSKA, D.D.S. ,
and RAYMOND W. WORLEY, D.V.M.
and ST. JOSEPH COUNTY HEALTH
DEPARTMENT
By
Dr. Louis E. How
Health Officer and Secretary
of the Board of Health
Dated: April 1, 1971
AMERICAN SOCIETY OF CIVIL ENGINEERS-
AMERICAN
SOCIETY OF NORTH CENTRAL BRANCH — INDIANA SECTION
CIVIL
ENGINEERS
FOUNOED
1852
COMMENTS ON THE PROPOSED IMPROVEMENTS
SCHEDULED FOR THE SOUTH BEND
SEWAGE TREATMENT PLANT
j` The North Central Branch of the Indiana Section of the American
Society of Civil Engineers have reviewed the proposed addition to the
South Bend Sewage Treatment Plant and offer the following comments to
the proposition:
(1) This proposed addition is long overdue, inasmuch as a
federal mandate has required chlorination of the effluent dis-
charge for approximately five years and a removal system
for phosphates for over two years.
i
(2) The sewage treatment plant has been operating with an
I
overload in the existing secondary system and only very
i
close control and the efficiency of the plant operations has
kept the day-to-day operation from becoming critical and
requiring additional construction without federal aid. j
(3) The proposed "South Bend Sewer Use Ordinance, " which E
is also long overdue, represents forward thinking on the part i
of the Board of Waste Water Commissioners. We feel that
this Ordinance, with the changes recommended by the A. S. C. E.
in the letter of February 25, 1971, is a definite requirement F
in the restoration of the environment and the elimination of F
i '.
pollution.
Respectfully submitted,
American Society of Civil Engineers
Committee on Consultation
I
t
t
i