Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PSA - Abonmarche Consultants - Service Documents for Ameritech Drive S of Cleveland Road
:=r-�4+•-- r'�.,`-'..,.,.�..;-��----,+-;:�i-•_'.'.ra- 1�7 SCOPE OF SERVICES We have tailored our scope of services per our previous discussions, and our current understanding of the project. A brief listing of services we expect to deliver for this project are listed below. Task #1: Survey a) Obtain existing topographical survey information from the city if available b) Obtain topographic data from curb to curb within project limits; c) Plot survey. Task #2: Geotechnical Investigation This work includes two pavement cores and 5 soil borings within the area of the failed pavement near the Pilot station and two pavement cores to determine pavement thickness and appropriate milling depth for remaining pavement. Task #3: Design & Construction Documents This work includes meetings with the City to review and discuss the design and plans as well as the construction and bidding solicitation approach. a) Field inspection of existing pavement and subgrade conditions b) Prepare preliminary plans c) Prepare preliminary cost estimate d) Review with City e) Prepare final plans, specifications, special provisions, and bid forms f) Finalize project quantities g) Prepare final cost estimate h) Submit three (3) sets of final bid documents to the City for final review i) Meeting with the City to discuss their review of the bid documents j) Submit final bid documents to the City Task #4: Bid Period Services a) Attend pre -bid meeting b) Answer bidding questions c) Prepare necessary addenda to the bid documents d) Tabulate the bids and make a recommendation of contract award Task #5: Construction Phase Services a) Attend the pre -construction conference if requested b) Answer City and contractor questions from the field if requested c) Review shop drawings if requested d) Inspect subgrade after pavement removal if requested e) Attend field progress meetings as requested by the City if requested Page 2 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Owner and Engineer further agree as follows: 1.01 Basic Agreement and Period of Service A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If authorized by Owner, or if required because of changes in the Project, Engineer shall furnish services in addition to those set forth above. Owner shall pay Engineer for its services as set forth in Paragraphs 7.01 and 7.02. B. Engineer shall complete its services within a reasonable time, or within the following specific time period: 1. Field Survey 2. Geotechnical Investigation 3. Design & Construction Does 3 Weeks from Authorization to Proceed 4 Weeks from Authorization to Proceed 7 Weeks from Authorization to Proceed C. If the Project includes construction -related professional services, then Engineer's time for completion of services is conditioned on the time for Owner and its contractors to complete construction not exceeding Um months. If the actual time to complete construction exceeds the number of months indicated, then Engineer's period of service and its total compensation shall be appropriately adjusted. 2.01 Payment Procedures A. Invoices: Engineer shall prepare invoices in accordance with its standard invoicing practices and submit the invoices to Owner on a monthly basis. Invoices are due and payable within 30 35 days of receipt. 9 Qvmer fails to make any parnent due Engineer foir seltvices aad expenses within - - of days afte* rooeipt of Engineer's inveiee, then ahma amounits due Engineef will be -At the rat ,46 per- month (or the maxinnim fate of inter-ost perinitted by law, if less) from said thirtiet daj- In addition, Engineer may, after giving seven days written notice to Owner, suspend services under this Agreement until Engineer has been paid in full all amounts due for services, expenses, and other related charges. Owner waives any and all non -disputed claims against Engineer for any such suspension. Payments will be oreditod first to interost and then to prineipal. 3.01 Termination A. The obligation to continue performance under this Agreement may be terminated: 1. For cause, a. By either party upon 30 days written notice in the event of substantial failure by the other party to perform in accordance with the Agreement's terms through no fault of the terminating party. Failure to pay Engineer for its services is a substantial failure to perform and a basis for termination. Page 3 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright (0 2008 National Society of Professional Engineers for )CJCDC. All rights reserved. b. By Engineer: 1) upon seven days written notice if Owner demands that Engineer furnish or perform services contrary to Engineer's responsibilities as a licensed professional; or 2) upon seven days written notice if the Engineer's services for the Project are delayed for more than 90 days for reasons beyond Engineer's control. Engineer shall have no liability to Owner on account of a termination by Engineer under Paragraph 3.01.A. Lb. c. Notwithstanding the foregoing, this Agreement will not terminate as a result of a substantial failure under Paragraph 3.0LA. La if the party receiving such notice begins, within seven days of receipt of such notice, to correct its substantial failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of notice; provided, however, that if and to the extent such substantial failure cannot be reasonably cured within such 30 day period, and if such party has diligently attempted to cure the same and thereafter continues diligently to cure the same, then the cure period provided for herein shall extend up to, but in no case more than, 60 days after the date of receipt of the notice. 2. For convenience, by Owner effective upon Engineer's receipt of written notice from Owner. B. The terminating party under Paragraph 3.01.A may set the effective date of termination at a time up to 30 days later than otherwise provided to allow Engineer to complete tasks whose value would otherwise be lost, to prepare notes as to the status of completed and uncompleted tasks, and to assemble Project materials in orderly files. C. In the event of any termination under Paragraph 3.01, Engineer will be entitled to invoice Owner and to receive full payment for all non -disputed services performed or furnished in accordance with this Agreement and all reimbursable expenses incurred through the effective date of termination. 4.01 Successors, Assigns, and Beneficiaries A. Owner and Engineer are hereby bound and the successors, executors, administrators, and legal representatives of Owner and Engineer (and to the extent permitted by Paragraph 4.01.B the assigns of Owner and Engineer) are hereby bound to the other party to this Agreement and to the successors, executors, administrators, and legal representatives (and said assigns) of such other party, in respect of all covenants, agreements, and obligations of this Agreement. B. Neither Owner nor Engineer may assign, sublet, or transfer any rights under or interest (including, but without limitation, moneys that are due or may become due) in this Agreement without the written consent of the other, except to the extent that any assignment, subletting, or transfer is mandated or restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. Page A EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright C 2008 National Society of Professional Engineers for EJCDC. All rights reserved. C. Unless expressly provided otherwise, nothing in this Agreement shall be construed to create, impose, or give rise to any duty owed by Owner or Engineer to any contractor, subcontractor, supplier, other individual or entity, or to any surety for or employee of any of them. All duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of Owner and Engineer and not for the benefit of any other party. 5.01 General Considerations A. The standard of care for all professional engineering and related services performed or furnished by Engineer under this Agreement will be the care and skill ordinarily used by members of the subject profession practicing under similar circumstances at the same time and in the same locality. Engineer makes no warranties, express or implied, under this Agreement or otherwise, in connection with Engineer's services. Subject to the foregoing standard of care, Engineer and its consultants may use or rely upon design elements and information ordinarily or customarily furnished by others, including, but not limited to, specialty contractors, manufacturers, suppliers, and the publishers of technical standards. B. Engineer shall not at any time supervise, direct, control, or have authority over any contractor's work, nor shall Engineer have authority over or be responsible for the means, methods, techniques, sequences, or procedures of construction selected or used by any contractor, or the safety precautions and programs incident thereto, for security or safety at the Project site, nor for any failure of a contractor to comply with laws and regulations applicable to such contractor's furnishing and performing of its work. C. This Agreement is to be governed by the law of the state or jurisdiction in which the Project is located. D. Engineer neither guarantees the performance of any contractor nor assumes responsibility for any contractor's failure to furnish and perform its work in accordance with the contract between Owner and such contractor. Engineer is not responsible for variations between actual construction bids or costs and Engineer's opinions or estimates regarding construction costs. E. Engineer shall not be responsible for the acts or omissions of any contractor, subcontractor, or supplier, or of any of their agents or employees or of any other persons (except Engineer's own employees) at the Project site or otherwise furnishing or performing any construction work; or for any decision made regarding the construction contract requirements, or any application, interpretation, or clarification of the construction contract other than those made by Engineer. F. The general conditions for any construction contract documents prepared hereunder are to be the "Standard General Conditions of the Construction Contract" as prepared by the Engineers Joint Contract Documents Committee (EJCDC C-700, 2007 Edition) unless the parties agree otherwise. G. All documents prepared or furnished by Engineer are instruments of service, and Engineer retains an ownership and property interest (including the copyright and the right of reuse) in such documents, whether or not the Project is completed. Owner shall have a limited license to use the documents on the Project, extensions of the Project, and for related uses of the Owner, subject to receipt by Engineer of full payment for all services relating to preparation of the documents and subject to the following limitations; (1) Owner acknowledges that such documents are not intended or represented to be suitable for use on the Project unless completed by Engineer, or for Page 5 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. use or reuse by Owner or others on extensions of the Project, on any other project, or for any other use or purpose, without written verification or adaptation by Engineer; (2) any such use or reuse, or any modification of the documents, without written verification, completion, or adaptation by Engineer, as appropriate for the specific purpose intended, will be at Owner's sole risk and without liability or legal exposure to Engineer or to its officers, directors, members, partners, agents, employees, and consultants; (3) Owner shall indemnify and hold harmless Engineer and its officers, directors, members, partners, agents, employees, and consultants from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from any use, reuse, or modification of the documents without written verification, completion, or adaptation by Engineer; and (4) such limited license to Owner shall not create any rights in third parties. H. To the fullest extent permitted by law, Owner and Engineer (1) waive against each other, and the other's employees, officers, directors, agents, insurers, partners, and consultants, any and all claims for or entitlement to special, incidental, indirect, or consequential damages arising out of, resulting from, or in any way related to the Project, and (2) agree that Engineer's total liability to Owner under this Agreement shall be limited to $19,800 or the total amount of compensation received by Engineer, whichever is greater. I. The parties acknowledge that Engineer's scope of services does not include any services related to a Hazardous Environmental Condition (the presence of asbestos, PCBs, petroleum, hazardous substances or waste as defined by the Comprehensive Environmental Response, Compensation and Liability Act, 42 U.S.C. §§9601 et seq., or radioactive materials). If Engineer or any other party encounters a Hazardous Environmental Condition, Engineer may, at its option and without liability for consequential or any other damages, suspend performance of services on the portion of the Project affected thereby until Owner: (1) retains appropriate specialist consultants or contractors to identify and, as appropriate, abate, remediate, or remove the Hazardous Environmental Condition; and (2) warrants that the Site is in full compliance with applicable Laws and Regulations. T. Owner and Engineer agree to negotiate each dispute between them in good faith during the 30 days after notice of dispute. If negotiations are unsuccessful in resolving the dispute, then the dispute shall be mediated. If mediation is unsuccessful, then the parties may exercise their rights at law. 6.01 Total Agreement A. This Agreement (including any expressly incorporated attachments), constitutes the entire agreement between Owner and Engineer and supersedes all prior written or oral understandings. This Agreement may only be amended, supplemented, modified, or canceled by a duly executed written instrument. Basis of Payment A. Using the procedures set forth in Paragraph 2.01, Owner shall pay Engineer as follows: Page b EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. The following Lump Sum amount for each task: a. Field Survey $3,000 b. Geotechnical Investigation $4,000 C. Design & Construction Documents $9,800 d. Bid Period Services $2,500 e. Construction Phase Services (at Hourly Rates) $500 2. Engineer's Standard Hourly Rates are attached as Appendix 1. 3. The total compensation for services and reimbursable expenses is not to exceed $19,800. 7.02 Additional Services: For additional services of Engineer's employees engaged directly on the Project, Owner shall pay Engineer an amount equal to the cumulative hours charged to the Project by each class of Engineer's employees times standard hourly rates for each applicable billing class; plus reimbursable expenses and Engineer's consultants' charges, if any. Engineer's standard hourly rates are attached as Appendix 1. Attachments: Appendix 1, Engineer's Standard Hourly Rates Page 7 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright D 2008 National Society of Professional Engineers for EJCDC. All rights reserved. IN WITNESS WHEREOF, the parties hereto have executed this Agreement, the Effective Date of which is indicated on page 1. Owner: Engineer: City of South Bend, Indiana Board of Public Works Aboninarche Consultants, Inc. By: /IQ w "7j (/l✓�`" -v X By: Title: Gary A. Gilot, President Title: Daryl S. Knip , VoPreside6t M. Title: Elizabeth A. Maradik, Member By; Z� Title: Therese J. Do au, NNN ember By. I A 7---- Title: Jar es A. Mueller, Member `` By: Title: Su anna M. r' zberg, Member Attest: �LliVda Title: Martin, Clerl Date: _/0-1(,-Y:) ( ? Address for giving notices: 227 West Jefferson Boulevard South Bend, Indiana 46601 Designated Representative (Paragraph 8.03.A): Title: Phone Number: Facsimile Number: E-Mail Address: Date: 04/13/2017 Engineer License or Firm's Certificate No. State of: Indiana Address for giving notices: 750 Lincoln Way East, South Bend, IN 46601 Designated Representative (Paragraph 8.03.A): Daryl S. Knip Title: Vice President Phone Number: 574-314-1020 Facsimile Number: PE 19900163 E-Mail Address: dknip@abonmarche.com Page 8 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. i Ail w � r 1. �s 2 MIN .* Li m N W O U)a (�a 00 Loo ro N o m rn o Q EA H9 m 0��°�� N 0 0 o t, C o Q H3 H4 O O U O O N � CO CO Q U Z � � O Q U o LO 0 o U lL N N ma R - � d LL 3 o 0 UU LOo O V VLo N Cl d fl LL N ci3 ui N �1 .O [1 «y EA 0 0 g o 0 CL `o n C N GH E9 O L Ztm UY T O D 7 in � a US O O O N G. (/} 7 2 a3 U U UU N CL a O CL LEJ F R N OL H o arp U U o m N FT Y ( N ~ O N FR R c b w fU co 0 0 m f § o CLK cl �a �0 §® 2 �mm \ \k� o' k J<k L\ \c \on /A �w /7 0 §}���»�44«»« / CD \\ §/ C4 N\§ \C) ®� E U) R 8 j/ m»#=���� #m/ § \� ®® LL-a \\ §\N'ra �N�rNM rya ± \ N� N�N n r/\ I— C4 m _a p/ / § @)\ $ § =�\ �§ j /0 �o e co E °G 0 9 v co r_ 0 o k§k\ „ c%o `$C {kk)§))\/ =7>#2mRm # EfLaa-mm=U-j�