My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Restroom Upgrades at Solid Waste - Ashton Construction LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - Restroom Upgrades at Solid Waste - Ashton Construction LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:52:18 PM
Creation date
5/10/2017 10:21:30 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/9/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 3 <br />Proposal <br />ASHTON CONSTRUCTION LLC <br />55790 Apple Road <br />Osceola, IN 46561 <br />Phone: (574) 674-9300 PAX: (574) 674-9308 <br />Date: March 17, 2017 <br />Proposal Submitted To: City Of South Bend, Wastewater Treatment Plant <br />Attn: Mike Bronstetter <br />Street: 3113 Riverside Drive <br />City, State: South Bend, IN 46628 <br />Phone: 574-235-5795 <br />Email: mbronste@southbendin.gov <br />We would like to thank you for giving us this opportunity to submit this proposal to you. <br />ADA Bathroom Installation: <br />1. New bathroom to be as layout shown on provided drawings. <br />2. Remove existing VCT flooring. Saw cut floor as needed for waste lines. Saw cutting to <br />be done on a Saturday. Covering of all office fixtures to be done by Wastewater Treatment <br />Plant staff. <br />3. Remove existing water heater. Install new 10 gallon electric water heater in utility room. <br />4. Install new supply lines and waste lines as needed to complete bathroom and tie into <br />existing lines from removed water heater. <br />5. Remove and repair portions of suspended ceiling to allow for placement of new wall. <br />Frame in door leading to utility room. This door to match existing doors as close as possible. <br />6. Install 518" mold resistant drywall taped and finished. Repair walls in new bathroom. <br />Prime and paint new drywall and repaired areas. Apply 2 top coats. Color numbers to <br />be supplied by others. <br />7. Install new VCT flooring and vinyl base. <br />8. Install new ADA stool, wall hung lav, ADA mirror, soap dispenser, paper towel dispenser, <br />and ADA grab bars. <br />9. Clean up all debris from site. <br />10. Secure all necessary permits. <br />Total For ADA Bathroom As Outlined Above - $24,006.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.