Loading...
HomeMy WebLinkAboutChange Order No. 1 - Corby Blvd. Sidewalk Improvements Division A.B.C - Proj No 116-087 - Rieth Riley Constructionn awn,. AMF. W a e Change Order No. 1 CORBY STREET SIDEWALK Project No. 116-087 OWNER: City of South Bend ENGINEER: Jones Petrie Rafinski Chris Chockley, RLA Registered Landscape Architect No, 20500170 CONTRACTOR: Rieth Riley PROJECT: Corby Street Sidewalk Installation Project No. 116-087 SUBJECT: Existing Driveway Modification for ADA Cross Slope Issues and an increase of 17 CYS for Borrow quantity. ISSUE DATE: March 21, 2017 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Existing driveways to be removed and reinstalled as part of Corby Street Sidewalk Project. The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS: 1. Bid/Proposal Form: ADD 203 SYS of DRIVEWAY, CONCRETE, REMOVE, SYS @ $35.00 ADD 203 SYS of DRIVEWAY, CONCRETE, 6 IN OVER SUBGRADE, SYS @ $50.00 ADD 17 CYS of BORROW, CYS @ $250.00 SPECIFICATIONS: NO CHANGE REQUIRED DRAWINGS: The following sheets have been revised and are issued as new sheets as a part of this Change Order: Sheet C101 — SITE DIMENSIONAL PLAN Sheet C102 — SITE DIMENSIONAL PLAN Sheet C103 —TYPICAL DETAIL SHEET CITY OF SOUTH BEND 'lam N '.�'.:: }�131.• PROJECT NAME: Corby Street Sidewalk ,RCS PROJECT NUMBER: 116-087 Item No. description Quantity Unit Unit Price Total Amount 1 DRIVEWAY, CONCRETE, REMOVE 203 SYS $35.00 $7,105 2 DRIVEWAY, CONCRETE, 6 IN OVER SUBBASE 203 SYS $50.00 $10,150 3 BORROW 17 CYS $250,00 $4,205 $21,505 m in 0