Loading...
HomeMy WebLinkAboutTask Order No. 1 - Stantec Consulting Services, Inc.Im w I 7 o Cost and Residential Indicator vs. Indiana Recreation Season Water Quality Compliance hours (all sources) o Cost and Residential Indicator vs. Indiana Recreation Season Water Quality Compliance hours (South Bend sources) o Cost and Residential Indicator vs. Michigan Recreation Season Water Quality Compliance as percentage of hours in the season when the WQ criteria is met (all sources) o Cost and Residential Indicator vs. Michigan Recreation Season Water Quality Compliance as percentage of hours in the season when the WQ criteria is met (South Bend Sources) o Cost and Residential Indicator vs. Indiana Recreation Season Water Quality Compliance as percentage of hours in the season when the WQ criteria is met (all sources) o Cost and Residential Indicator vs. Indiana Recreation Season Water Quality Compliance as percentage of hours in the season when the WQ criteria is met (South Bend Sources) o Cost and Residential Indicator vs. 2012 EPA Revised Water Quality Criteria Compliance o Cost vs. Residential Indicator Concept Maps (Updates of previously presented alternative maps) o Existing Long-term Control Plan o Preferred Alternative Plan * Cost Summary Table for Alternatives Task 1.4: Documentation of 5-year LTCP Review A summary document will be prepared for transmittal to IDEM to satisfy the requirements for the 5-year review of the CLIENT's LTCP. The document will include results from the 2016 FCA Update geographical review from Task 1.1, charts, maps, and the cost summary table from Task 1.2 and a narrative summary of the process used by the CLIENT to review the LTCP and formulate a proposed alternative. A key focus of the document will be to explain in clear and compelling fashion why the alternative approach proposed by the CLIENT represents a significantly better strategy than the current LTCP for successfully improving the CLIENT's management of its combined sewer system and achieving improved levels of water quality in the St. Joseph River. A preliminary outline of the proposed document will be prepared upon notice -to -proceed from the CLIENT. Upon receipt of comments on the outline from the CLIENT and its Legal Team, CONSULTANT will prepare a draft of the review document and submit it to the CLIENT and its Legal Team for review. Upon receipt of comments, CONSULTANT will revise and submit a final version of the package to the CLIENT. Task 1.5: Meeting with IDEM/USEPA — Following the CLIENT's review of the outline for the 5-year review document, CONSULTANT will participate in a conference call with City staff and the CLIENT's Legal Team to formulate a strategy for a meeting with IDEM/USEPA. Based on input from the Legal Team, CONSULTANT will prepare presentation materials to accompany the 5 year review document and be used in the meeting with IDEM/USEPA. CONSULTANT will work through two review cycles of the presentation materials with the CLIENT and the Legal Team prior to finalizing the package for presentation and submittal to IDEM/USEPA. Members of the CONSULTANT Team will participate in a meeting with the CLIENT, its Legal Team, IDEM, and USEPA to present the CLIENT's proposal for modification of its LTCP. Following the meeting, the Stantee Team will provide written documentation of the meeting to the CLIENT and its Legal Team. Fl a Q A? n'a9�k�daiF_7 e _ y A Ilk s l ra_ - R,#�,r aa�im. `Wx ��pi d' ' 93 a=� ;ar 3� s @' r _■ - a$ "� A 3 - ■ �ra In 1 ire F, � � •�■- � R — �',ry� � _''� Jai§ � ,'"� _ a' ,� �,° ` J. J OR o- mAw y� —F' _�, J• -... • ,.die■ ti.� �-. -� _- f I ji Appendix I (Compensation) TASK ORDER 01 COMPENSATION 1 COMPENSATION 1.1 CLIENT shall pay to CONSULTANT under this Task Order, a lump sum amount of $106,500 as Compensation for the performance of the Services. 1.2 The portion of the compensation amount billed monthly for Engineer's services will be based upon Engineer's estimate of the percentage of the total services actually completed during the billing period. Table 1 provides a breakdown of the basis for the lump sum amount by task. Table 1 Lump Sum Billing Amounts by Sub -Task South Bend CSO Long Term Control Plan Reevaluation — Task Order 01 Task Description Lump Sum Amount 1.1 Establish Preferred Alternative $21,500 1.2 Census -based FCA Update $8,500 1.3 Documentation of Alternative Analysis $25,000 1.4 Documentation of 5-year Review $15,000 1.5 Meeting with IDEM/USEPA $30,000 Project Management $6,500 Task Order 01 Total $106,500 1.3 Electronic payment may be made to the following address: BANK NAME: Wells Fargo Bank BANK ADDRESS: 1000 Lakes Drive, Suite 250 West Covina, CA 91790 ACCOUNT #: 4945081503 ACCOUNT NAME: MWHA (now part of Stantec) AIR Collection ABA#: 121000248 SWIFT #: WFBIUS6S NON US# SWIFT CODE: WFBIUS6WFFX ACH COORDINATOR: Jeff Cuevas 626-564-6737 cuevas(cr7,we i lsfargo. co m MSA Lump Sum (Appendix 1) (Rev. 01-01-2017) Please Send Remittance Details To: Accounts.receivable.correspondenee a,mwhglobal.com 1.4 Mail / Lock Box Stantec Consulting Services Inc. PO Box 842728 Los Angeles, CA 90084-2728 Attn: Accounts Payable Remittance via Overnight Delivery: Wells Fargo Lockbox E2001-049 MWH Americas (now part of Stantec) — Box 842728 3440 Flair Drive El Monte, CA 91731 MSA Lump Sum (Appendix 1) (Rev. 01-D 1-2017)