HomeMy WebLinkAboutChange Order No. 7 - East Bank Sewer Separation Phase 5 Division B - Walsh & Kelly, Inc.low a; "A � 9. ' N1 �i 1 1� Y n 1�� � �i City of South Bend Project No, 114-062B OWNER: City of South Bend ENGINEER: City of South Bend Engineering Kara M. Boyles, P.E. Professional Engineer No. 10809510 CONTRACTOR: Walsh & Kelly, Inc. Change Order No. 7 — 415117 PROJECT: East Bank Sewer Separation — Phase 5 (Division B) Project No. 114-062B SUBJECT: Change Order Explanation ISSUE DATE: April 5, 2017 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: Item QtV Unit Price Days Total 1. Abutment Removal 1 LS $20,000.00 5 $20,000.00 2. Sewer Lining Increase 1 LS $15,000.00 0 $15,000.00 3. Time Extension NIA NIA NIA 14 $0.00 Net Change Order amount $35,000.00 1) An existing railroad abutment was found along St. Peter St directly in the path of the new storm sewer installation. The structure will need to be removed in order to continue installations. 2) Sewer lining unit prices have increased for the new calendar year. Bids were submitted in 2015 and there are new costs associated with performing the lining this year. 3) The time extension is to cover the last two weeks from November 2016 when no work could be performed before the winter months (December -March). D m rr-