HomeMy WebLinkAboutProfessional Services Supplemental Agreement No. 1 - United Consulting - Addit. Scope for Coal Line Trail Phases I and II1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND. INDIANA 46601-1830
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
March 14, 2017
Dave Richter
United Consulting
1625 N Post Road
Indianapolis, IN 46219
RE: Professional Services Supplemental Agreement No. 1
Dear Mr. Richter:
PHONE 574/235-9251
FAX 574/235-917I
The Board of Public Works, at its meeting held on March 14, 2017, approved the above
referenced agreement regarding additional scope for the Coal Line Trail, Phases I and II, in
the amounts not to exceed $192,400 for Phase I and $185,900 for Phase II.
Enclosed please find a copy of the agreement for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
c: Kevin Fink, Engineering
GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JANIEs A. MUELLER THERESE J. DORAU
vUNITED
Consulting=
This SUPPLEMENTAL AGREEMENT ("Agreement's is made and entered into on this date 0AL(h ly,100 by
and between the City of South Bend, acting by and through its proper officials, `LOCAL PUBLIC AGENCY"
or "LPA') and UNITED CONSULTING, an Indiana corporation 'CONSULTANT').
WITNESSETH
WHEREAS, the CONSULTANT did, on April 26, 2016 enter into an Agreement with the LOCAL PUBLIC
AGENCY for Engineering Services and Documents in relation to the following described project:
Des. No, 1401810
Coal Line Trail, Phase I; from Lincolnway West to
Riverside Drive in LaPorte District
This supplement is required to revise the following services included in the original scope of work:
Topographic Survey, US Waters Report, Section 106, and Trail Design & Plans; and
Add the following new services:
Landscape Architecture Design & Plans, Lighting Design & Plans, Title Searches, Right -of -Way
Engineering, and Right -of -Way Staking.
WHEREAS, in order to provide for completion of the work it is necessary to amend and supplement the
Engineering Agreement.
NOW, THEREFORE, it is agreed by and between the parties as follows:
L Appendix "A"is amended to read as follows;
L. LANDSCAPE ARCHITECTURE DESIGN AND PLANS
The CONSULTANT shall prepare plans, specifications and estimates of cost, which shall be
in accordance with the accepted standards for such work and in accordance with the
following documents in effect at the time the plans or reports are submitted: Indiana
Supplemental Agreement version 6-2011
Design Manual, American Association of State Highway and Transportation Officials "A
Policy on Geometric Design of Highways and Streets", Indiana Department of
Transportation's Standard Specifications, Road and Bridge Memoranda except as modified
by supplemental specifications and special provisions, if any, and shall be completed to the
point required to fulfill the requirements of Stage 3 Plans and Final Contract Documents.
1. The CONSULTANT shall prepare and submit Stage-2 level plans to the LPA for
review and acceptance.
2. The CONSULTANT shall prepare and submit Stage-3 level plans to the LPA and
INDOT for review and acceptance.
3. The CONSULTANT shall prepare and submit Final Tracing plans to INDOT and the
LPA.
N. LIGHTING DESIGN AND PLANS
The CONSULTANT shall prepare plans, specifications and estimates of cost, which shall be
in accordance with the accepted standards for such work and in accordance with the
following documents in effect at the time the plans or reports are submitted: Indiana
Design Manual, American Association of State Highway and Transportation Officials "A
Policy on Geometric Design of Highways and Streets", Indiana Department of
Transportation's Standard Specifications, Road and Bridge Memoranda except as modified
by supplemental specifications and special provisions, if any, and shall be completed to the
point required to fulfill the requirements of Stage 3 Plans and Final Contract Documents.
1. The CONSULTANT shall prepare and submit Stage-2 level plans to the LPA for
review and acceptance.
2. The CONSULTANT shall prepare and submit Stage-3 level plans to the LPA and
INDOT for review and acceptance.
3. The CONSULTANT shall prepare and submit Final Tracing plans to INDOT and the
LPA.
TITLE SEARCH
The CONSULTANT shall perform Title Searches for acquisition parcels in accordance with
the INDOT Right -of -Way Engineering Procedures Manual along with any supplemental
memoranda to said Manual and Title 865 of the Indiana Administrative Code, Articles 1
through 12. The procedures for the Title Searches for 31 parcels consists of the following:
1. Review and interpretation of Title and Encumbrance Reports.
2. Determination of the owners and property limits of the areas of acquisition within
the project limits.
Q. RIGHT-OF-WAY ENGINEERING
The CONSULTANT shall perform Right -of -Way Engineering for acquisition parcels in
accordance with the INDOT Right -of -Way Engineering Procedures Manual along with any
supplemental memoranda to said Manual and Title 865 of the Indiana Administrative Code,
Articles 1 through 12. The procedures for the Right -of -Way Engineering for 31 parcels
consists of the following:
1. Provide legal descriptions (certified by a registered land surveyor) of all temporary
and permanent acquisition parcels.
2. Provide land plats (certified by a registered land surveyor) for each permanent
acquisition parcel showing the owner's property, existing right of way and proposed
right of way.
3. Provide area computations and L-10 forms of the owners' title areas, existing rights
of way, proposed rights of way and residues of the owners' properties.
Supplemental Agreement version 6-2011
4. Provide documentation and proof and any existing rights of way.
5. Be available for assistance in interpreting any right of way documents with the
client or acquisition team.
R. RIGHT-OF-WAY STAKING
The CONSULTANT shall perform Right -of -Way Staking for acquisition parcels in accordance
with the INDOT Right -of -Way Engineering Procedures Manual along with any supplemental
memoranda to said Manual and Title 865 of the Indiana Administrative Code, Articles 1
through 12. The procedures for the Right -of -Way Staking of up to 31 parcels consists of
the following:
1. Provide in the field, stake -out locating the proposed right-of-way line at property
line intersections, deflection points and at one hundred foot intervals.
2. Provide the stake -out with wood hubs and lathes.
II. Appendix "B"is amended to read as follows.
13. Condemnation of any parcels.
III. Appendix "C"is amended to read as follows;
L. LANDSCAPE ARCHITECTURE DESIGN AND PLANS
1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field
Check Plans.
2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by
LPA.
3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by
INDOT and LPA and at least 30 calendar days prior to Ready for Contracts.
N. LIGHTING DESIGN AND PLANS
1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field
Check Plans.
2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by
LPA.
3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by
INDOT and LPA and at least 30 calendar days prior to Ready for Contracts.
P. TITLE SEARCH
1. Title Searches within 21 calendar days after receipt of approved Stage 2 Plans.
Q. RIGHT-OF-WAY ENGINEERING
1. Plats and Legal Descriptions within 63 calendar days after receipt of Title Searches.
R. RIGHT-OF-WAY STAKING
1. Right -of -Way Staking within 7 calendar days after a request from the LPA.
Supplemental Agreement version 6-2011
IV, Appendix "D"is amended to read as follows;
A.I. The CONSULTANT shall receive as payment for the work performed under this Agreement
the total fee not to exceed $544,425 unless a modification of the Agreement is approved in
writing by the LPA.
A.2. The CONSULTANT will be paid for the work performed under this Agreement on a lump
sum basis in accordance
with the following schedule:
a.
Project Management and Coordination
$
58,700
b.
Topographic Survey
$
62,900
c.
Alignment Assessment
$
19,900
d.
Landscape Architecture Assessment
$
27,200
e.
Environmental Services
1. U.S. Waters Report w/ Determination & Delineation
$
8,400
2. National Historic Preservation Act, Section 106
$
8,700
3. Section 106, Historic Properties Report
$
19,425
4. Phase I Environmental Assessment
$
12,500
5. Categorical Exclusion, Level 4
$
20,800
f.
Public Hearing
$
3,800
g.
Regulatory Permits (IDEM Rule 5)
$
6,500
h.
Trail Design and Plans
$
90,800
i.
Utility Coordination
$
18,100
j.
Pavement Design
$
1,900
k.
Public Outreach
$
21,100
I.
Landscape Architecture Design and Plans
$
45,600
m.
Mitigation Plan Development & Monitoring Services
TBD
n.
Lighting Design and Plans
$
9,600
o.
Construction Phase Design Services
TBD
A.3. The CONSULTANT will be paid Unit Rates for the work performed under this Agreement in
accordance with the following schedule:
uanti
Unit Price
Total
a. Title Searches
31 each
$500/each
$15,500
b. Right -of -Way Engineering
31 each
$2,500/each
$77,500
c. Right -of -Way Staking
31 each
$500/each
$15,500
Supplemental Agreement version 6-2011
II, Except as herein modified, changed and supplemented, al/ terms of the original
engineering agreement dated April 26, 2016 shall continue in full force and effect.
Supplemental Agreement version 6-2011
IN WITNESS WHEREOF the parties hereto have executed this
CONSULTANT
Supplemental Agreement No, 1
LOCAL PUBLIC AGENCY
IY: BY:
Dave ' hter esid Gary A. Gilot, President
BY:A-9
Michael Rowe, Vice President
W
David P. Relos, Member
James A. Mueller, Member
BY: 3 bi L
Elizabeth A. Maradik, Member
BY:
Therese J. Dorau, Piember
ATTEST:
( " -)y
i d�1i a M. Martin, Clerk
Supplemental Agreement version 6-2011
vUNITED
Consulting=
This SUPPLEMENTAL AGREEMENT ("Agreement') is made and entered into on this dateVNW0 J Aol► by
and between the City of South Bend, acting by and through its proper officials, ("LOCAL PUBLIC AGENCY"
or "LPA'� and UNITED CONSULTING, an Indiana corporation ("CONSULTANT').
WITNESSETH
WHEREAS, the CONSULTANT did, on April 26, 2016 enter into an Agreement with the LOCAL PUBLIC
AGENCY for Engineering Services and Documents in relation to the following described project:
Des. No. 1401811
Coal Line Trail, Phase II; from Riverside Drive
to Angela Boulevard in LaPorte District
This supplement is required to revise the following services included in the original scope of work:
Topographic Survey, Bridge Inspection, Regulatory Permits, Bridge Design & Plans (Railroad), and
Trail Design & Plans; and
Add the following new services:
Landscape Architecture Design & Plans, Lighting Design & Plans, Asbestos Inspection, Retaining
Wall Design & Plans, Title Searches, Right -of -Way Engineering, and Right -of -Way Staking.
WHEREAS, in order to provide for completion of the work it is necessary to amend and supplement the
Engineering Agreement.
NOW, THEREFORE, it is agreed by and between the parties as follows:
I. Appendix "A" is amended to read as follows:
L. LANDSCAPE ARCHITECTURE DESIGN AND PLANS
The CONSULTANT shall prepare plans, specifications and estimates of cost, which shall be in
accordance with the accepted standards for such work and in accordance with the following
Supplemental Agreement version 6-2011
documents in effect at the time the plans or reports are submitted: Indiana Design Manual,
American Association of State Highway and Transportation Officials "A Policy on Geometric
Design of Highways and Streets", Indiana Department of Transportation's Standard
Specifications, Road and Bridge Memoranda except as modified by supplemental
specifications and special provisions, if any, and shall be completed to the point required to
fulfill the requirements of Stage 3 Plans and Final Contract Documents.
1, The CONSULTANT shall prepare and submit Stage-2 level plans to the LPA for review
and acceptance.
2. The CONSULTANT shall prepare and submit Stage-3 level plans to the LPA and INDOT
for review and acceptance.
3. The CONSULTANT shall prepare and submit Final Tracing plans to INDOT and the
LPA.
N. LIGHTING DESIGN AND PLANS
The CONSULTANT shall prepare plans, specifications and estimates of cost, which shall be in
accordance with the accepted standards for such work and in accordance with the following
documents in effect at the time the plans or reports are submitted: Indiana Design Manual,
American Association of State Highway and Transportation Officials "A Policy on Geometric
Design of Highways and Streets", Indiana Department of Transportation's Standard
Specifications, Road and Bridge Memoranda except as modified by supplemental
specifications and special provisions, if any, and shall be completed to the point required to
fulfill the requirements of Stage 3 Plans and Final Contract Documents.
1. The CONSULTANT shall prepare and submit Stage-2 level plans to the LPA for
review and acceptance.
2. The CONSULTANT shall prepare and submit Stage-3 level plans to the LPA and
INDOT for review and acceptance.
3. The CONSULTANT shall prepare and submit Final Tracing plans to INDOT and the
LPA.
P. ASBESTOS INSPECTION
The CONSULTANT shall make observations at the bridge and identify suspected asbestos -
containing materials (ACMs) that are encountered, obtain samples of the materials (if
feasible) and analyze samples for asbestos using polarized light microscopy. The results of
the findings shall be provided in a report including the location and approximate quantity of
ACMs encountered and will include a single -page summary of our findings as required by the
Indiana Department of Environmental Management.
Q. RETAINING WALL DESIGN AND PLANS
The CONSULTANT shall prepare plans, specifications and estimates of cost, which shall be in
accordance with the accepted standards for such work and in accordance with the following
documents in effect at the time the plans or reports are submitted: Indiana Design Manual,
American Association of State Highway and Transportation Officials "A Policy on Geometric
Design of Highways and Streets", Indiana Department of Transportation's Standard
Specifications, Road and Bridge Memoranda except as modified by supplemental
specifications and special provisions, if any, and shall be completed to the point required to
Supplemental Agreement version 6-2011
fulfill the requirements of Stage 3 Plans and Final Contract Documents.
1. The CONSULTANT shall prepare and submit Stage-2 level plans to the LPA for
review and acceptance.
2. The CONSULTANT shall prepare and submit Stage-3 level plans to the LPA and
INDOT for review and acceptance.
3. The CONSULTANT shall prepare and submit Final Tracing plans to INDOT and the
LPA.
R. TITLE SEARCH
The CONSULTANT shall perform Title Searches for acquisition parcels in accordance with the
INDOT Right -of -Way Engineering Procedures Manual along with any supplemental
memoranda to said Manual and Title 865 of the Indiana Administrative Code, Articles 1
through 12. The procedures for the Title Searches for 22 parcels consists of the following:
1. Review and interpretation of Title and Encumbrance Reports.
2. Determination of the owners and property limits of the areas of acquisition within the
project limits.
S. RIGHT-OF-WAY ENGINEERING
The CONSULTANT shall perform Right -of -Way Engineering for acquisition parcels in
accordance with the INDOT Right -of -Way Engineering Procedures Manual along with any
supplemental memoranda to said Manual and Title 865 of the Indiana Administrative Code,
Articles 1 through 12. The procedures for the Right -of -Way Engineering for 22 parcels
consists of the following:
1. Provide legal descriptions (certified by a registered land surveyor) of all temporary
and permanent acquisition parcels.
2. Provide land plats (certified by a registered land surveyor) for each permanent
acquisition parcel showing the owner's property, existing right of way and proposed
right of way.
3. Provide area computations and L-10 forms of the owners' title areas, existing rights
of way, proposed rights of way and residues of the owners' properties.
4. Provide documentation and proof and any existing rights of way.
5. Be available for assistance in interpreting any right of way documents with the client
or acquisition team.
T. RIGHT-OF-WAY STAKING
The CONSULTANT shall perform Right -of -Way Staking for acquisition parcels in accordance
with the INDOT Right -of -Way Engineering Procedures Manual along with any supplemental
memoranda to said Manual and Title 865 of the Indiana Administrative Code, Articles 1
through 12. The procedures for the Right -of -Way Staking of up to 22 parcels consists of the
following:
1. Provide in the field, stake -out locating the proposed right-of-way line at property line
intersections, deflection points and at one hundred foot intervals.
2. Provide the stake -out with wood hubs and lathes.
a
Supplemental Agreernent version 6-2011
II, Appendix "B"is amended to read as follows:
13. Condemnation of any parcels.
111. Appendix "C"is amended to read as follows:
L. LANDSCAPE ARCHITECTURE DESIGN AND PLANS
1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field Check
Plans.
2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by LPA.
3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by
INDOT and LPA and at least 30 calendar days prior to Ready for Contracts.
N. LIGHTING DESIGN AND PLANS
1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field
Check Plans.
2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by
LPA.
3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by
INDOT and LPA and at least 30 calendar days prior to Ready for Contracts.
P. ASBESTOS INSPECTION
1. Asbestos Inspection and Report completed prior to Stage 3 submission.
Q. RETAINING WALL DESIGN AND PLANS
1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field Check
Plans.
2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by LPA.
3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by
INDOT and LPA and at least 30 calendar days prior to Ready for Contracts.
R. TITLE SEARCH
1. Title Searches within 30 calendar days after receipt of approved Stage 2 Plans.
S. RIGHT-OF-WAY ENGINEERING
1. Plats and Legal Descriptions within 63 calendar days after receipt of Title Searches.
T. RIGHT-OF-WAY STAKING
1. Right -of -Way Staking within 14 calendar days after a request from the LPA.
Supplemental Agreement version 6-2011
IV. Appendix V"is amended to read as follows.,
A.I. The CONSULTANT shall receive as payment for the work performed under this Agreement
the total fee not to exceed $459,730 unless a modification of the Agreement is approved in
writing by the LPA.
A.2. The CONSULTANT will be paid for the work performed under this Agreement on a lump sum
basis in accordance with the following schedule:
a.
Topographic Survey
$
45,700
b.
Landscape Architecture Assessment
$
12,700
c.
Bridge Inspection
$
18,400
d.
Underwater Bridge Inspection
$
8,930
e.
Regulatory Permits (IDEM Rule 5)
$
13,700
f.
Trail Design and Plans
$
73,900
g.
Bridge Design and Plans (Railroad)
$
131,000
h.
Load Rating
$
4,600
i.
Scour Analysis
$
6,700
j.
Utility Coordination
$
12,000
k.
Pavement Design
$
1,900
I.
Landscape Architecture Design and Plans
$
30,400
m.
Mitigation Plan Development & Monitoring Services
TBD
n.
Lighting Design and Plans
$
9,600
o.
Construction Phase Design Services
TBD
p.
Asbestos Inspection
`b
1,500
q.
Retaining Wall Design and Plans
$
11,700
A.3. The CONSULTANT will be paid Unit Rates for the work performed under this Agreement in
accordance with the following schedule:
uanti Unit Price Total
a. Title Searches 22 each $500/each $11,000
b. Right -of -Way Engineering 22 each $2,500/each $55,000
c. Right -of -Way Staking 22 each $500/each $11,000
H. Except as herein modified, changed and supplemented, all terms of the original
engineering agreement dated April 26, 2O16 shall continue in full force and effect,
Supplemental Agreement version 6-2011
IN WITNESS WHEREOF, the parties hereto have executed this
Supplemental Agreement No, 1
CONSULTANT
53
BY: L
Michael Rowe, Vice President
DATE:
22
LOCAL PUBLIC AGENCY
BY:
Gary A. Gilot, President
W
L"V
David P. Relos, Member
James A. Mueller, Member
BY:
Vieth A. Maradik, Member
Therese J. Dor u, Merkber
ATTESf Q -
i da M. Martin, C erk
Supplemental Agreement version 6-2011
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date
March 6th, 2017
Department
Public Works
Name
Kevin Fink
Division/Bureau
Engineering
BPW Date
March 14th, 2017
Phone Extension
5903
Legal Attorney Name: Michael Schmidt
Controller ® Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing
Check the Appropriate Item Type — Required for All Submissions
❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum
❑ Professional Services ❑ Resolution
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award
❑ Change Order No. ❑ C/O & PCA No. ❑ PCA
❑ Ease/Encroach. ❑ Traffic Control:
IRI Other: Contract SuDDlement
Company or Vendor Name
New Vendor
MBE/WBE Contractor
MBEANBE Contractor Requested
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Amount of
Increase
Decrease
Previous Amount
Current Percent of Change:
New Amount
Total Percent of Change:
Copy
Origin
❑
❑
❑
❑
❑
❑
Information
United Consulting
❑ Yes ® No ❑ If Yes, Approved by Purchasing
MBE ❑ WBE
❑ No ❑ Yes Name of Company
Coal Line Trail Phase I
Coal Line Trail Phase II
ENG: 115-063 DES No: 1401810
ENG: 115-064 DES No: 1401811
Riverwest TIF
324.1050.460.42.02
Phase I: Increase of $192,400
Phase II: Increase of $185,900
Total fee not to exceed
Scope additions include: RoW Engineering, Landscape
Architecture, and added trail design components
Required Contractor's Certification Forms Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.)
or