Loading...
HomeMy WebLinkAboutChange Order No. 6 - East Bank Sewer Separation Phase 5 Proj No 114-062B - Walsh & Kelly, Inc1316 COUNTY -CITY BUILDING 227 W. JEFFER$ON BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS February 28, 2017 Dustin Hilary Walsh & Kelly, Inc. 24358 State Road 23 South Bend, IN 46614 RE: Change Order No. 6 - East Bank Sewer Separation, Phase 5 Project No. 114-062B Dear Mr. Hilary: PHONE 574/235-9251 FAX 574/235-9171 The Board of Public Works, at its meeting held on February 28, 2017, approved the above referenced Change Order for an increase of $49,999.54, bringing the current contract amount to $5,364,096.60. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure c: Toy Villa, Engineering Roger Nawrot, Engineering Beth Leonard, Community Investment Judy Love, Community Investment Aaron Kobb, Community Investment GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMEs A. MUELLER THERESE J. DoRAu youi CITY OF SOUTH BEND, INDIANA 5d DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER �+ DATE: 2/23/2017 PROJECT NO: 114-062B PROJECT NAME: East Bank Sewer Separation - Phase 5 (Division B) CONTRACT DATE: 1/26/2016 CHANGE ORDER NO: 6 SUBJECT OF CHANGE ORDER: PCR #16-Line Item Reductions PCR #17-Soil Removal PCR #18-Borrow The original contract sum 5,080,808.05 Net change by previously authorized change orders 233,289.01 The contract sum prior to this change order 5,314,097.06 By this Change Order, the project amount is X❑ Increased The new contract sum including this change order This Change Order represents a total change of Total change for entire project ❑ Decreased 49,999.54 (TIF: + $49,999.54) (Sewer Bond: + $0.00) 5, 364, 096.60 0.94 % 5.58 % Original contracted completion date/time 11/16/2016 Extension of date/time by previous change orders 150 days Date/time extension by this change order 0 days New completionf,96/tim/ 8/14/2017 RECOMMENDED FOR APPROVAL CON CTION MANAGER CITY OF SOUTH BEND Printed Name and -ritle BOARD OF PUBLIC WORKS Walsh Kellv Inc. Company Name 24358 State Road 23 Address South Bend, IN 46614 City, State, Zip Approved �}t/�D/atte� ��Pf�7/7 -� (/ "l Gary A. Gilot, President James A. Mueller, Member City of South Bend Project No. 114-062B Change Order No. 6 - 2/23/17 OWNER: City of South Bend ENGINEER: City of South Bend Engineering Kara M. Boyles, P.E. Professional Engineer No. 10809510 CONTRACTOR: Walsh & Kelly, Inc. PROJECT: East Bank Sewer Separation - Phase 5 (Division B) Project No. 114-062B SUBJECT: Change Order Explanation ISSUE DATE: February 23, 2017 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: Item QtV Unit 1. Line Item Reductions (See attached) 2. Add Soil Removal 8,300 Tons 3. Add Borrow 2,561 CYD Price Days Total ($328,098.46) $40 0 $332,000.00 $18 0 $46,098.00 Net Change Order amount $49,999.54 [Funding approved from account number: 429.1050.460.42.03 (Project 15J016)] 1) Line Item Reductions are being used to reallocate funds to pay for unsuitable soil removals. Originally planned streetscape work along St. Louis Blvd, Jefferson Blvd, and the northernmost portion of St. Peter St are being eliminated so the money can be used for soil disposal costs. Please refer to the attached line item/quantity breakdown for items being eliminated from the project. 2) The Soil Removal line item is needed for the disposal of unsuitable soils and the associated tipping fees. The unsuitable soils are located at Northside Blvd through 215 feet north along what will become St. Peter St. Soil to be removed is about 75 feet wide and 12 feet deep. 3) The Borrow line item is needed so structural backfill can be hauled in to replace the removed unsuitable soils for use within the roadway. No. Line Item Removal from Contract City Unit Price Total 23 MILLING, ASPHALT, 2.51N 774 $4.00 $3,096.00 24 HMA SURFACE, TYPE B 65 $67.00 $4,355.00 27 HMA WEDGE & LEVEL, TYPE B 2 $75.00 $150.00 32 SIDEWALK, CONCRETE, 41N. 140 $30.00 $4,200.00 34 CURB, MODIFIED, CONCRETE 250 $24.00 $6,000.00 35 PCCP FOR APPROACHES, 61N. 10 $45.00 $450.00 1.04 ALTA: CURB, CONCRETE, REMOVE 1860 $2.00 $3,720.00 1.05 ALT A: CONCRETE, REMOVE 160 $4.00 $640,00 1.06 ALTA: PAVEMENT REMOVAL 750 $6.00 $4,500.00 1.09 ALTA: COMMON EXCAVATION 240 $22.00 $5,280.00 1A ALTA: B-BORROW 160 $7.50 $1,200.00 1.13 ALT A: COMPACTED AGGREGATE, NO. 53, BASE 185 $23.00 $4,255.00 1.14 ALT A: MILLING, ASPHALT, 2.51N 6040 $2.00 $12,080.00 1.15 ALT A: HMA SURFACE, TYPE B 500 $65.00 $32,500.00 L16 ALT A: HMA INTERMEDIATE, TYPE B 45 $50.00 $2,250.00 1.17 ALT A: HMA BASE, TYPE B 90 $47.00 $4,230.00 1.19 ALT A: HMA WEDGE AND LEVEL, TYPE B 336 $60.00 $20,160.00 1.2 ALT A: ASPHALT FOR TACK COAT 1 $15.001 $15.00 1.22 ALT A: SIDEWALK, CONCRETE, 4 IN. 80 $30.00 $2,400.00 1.24 ALTA: CURB, MODIFIED, CONCRETE 1720 $21.00 $36,120.00 1.25 ALTA: PCCP FORAPPROACHES, S IN. 305 $55.00 $16,775.00 1.26 ALTA: SODDING 840 $4.52 $3,796.80 1.28 ALTA: ADJUSTCASTINGTO GRADE 4 $350.00 $1,400.00 1.29 ALTA: ADJUSTVALVE BOXTO GRADE 3 $35.00 $105,00 1.38 ALTA: SIGN POST, SQUARE, TYPE 2, REINFORCED ANCHOR BASE 198 $9.72 $1,924.56 1.39 ALTA: SIGN, SHEET, WITH LEGEND0.080" 111 $16.75 $1,859.25 1.4 ALTA: SIGN AND POST, REMOVE AND RESET 1 1 $150.00 $150.00 1.41 ALTA:LINE, THERMOPLASTIC, SOLID, WHITE, 41N. 878 $1.50 $1,317.00 1.42 ALTA:TRANSVERSE PAVEMENT MARKING,THERMOPLASTIC, CROSSWALK LINE, 61N. 675 $2.25 $1,518.75 1.43 ALTA:TRANSVERSE PAVEMENT MARKING, THERMOPLASTIC, STOP LINE, 241N. 90 $7.00 $630.00 1.44 ALTA: PAVEMENT MESSAGE MARKING, THERMOPLASTIC, SHARED LANE 8 $375.00 $3,000.00 1.45 ALTA:LINE,THERMOPLASTIC, BROKEN, YELLOW, 41N. 335 $1.50 $502.50 1.46 ALTA: PAVEMENT MESSAGE MARKING,THERMOPLASTIC, LANE INDICATION ARROW 9 $125.00 $1,125.00 1.47 ALTA: PAVEMENT MESSAGE MARKING, THERMOPLASTIC, ONLY 7 $150.00 $1,050.00 1.48 ALT A:LINE, THERMOPLASTIC, SOLID, YELLOW, 41N. 2085 $1.50 $3,127.50 2.02 ALT B: MOBILIZATION AND DEMOBILIZATION 1 $6,500.00 $6,500.00 2.05 ALT B: CURB, CONCRETE, REMOVE 1000 1 $2.00 $2,000.00 2.06 ALT B: CONCRETE, REMOVE 1360 - $4.00 $5,440.00 2.07 ALT B: PAVEMENT REMOVAL 175 $6.00 $1,050.00 2.09 ALT B: B BORROW 230 $750 $1,725.00 2.1 ALT B: TEMPORARY EROSION AND SEDIMENT CONTROL 1 $4,500.00 $4,500.00 2.11 ALT B: FLOWABLE BACKFILL, NON -REMOVABLE 2 $250.00 $500.00 2.12 ALT B: COMPACTED AGGREGATE, NO.53, BASE 30 $20.00 $600.00 2.13 ALT B: MILLING, ASPHALT, 2.5 IN 1800 $2.00 $3,600.00 2.14 ALT B: HMA SURFACE, TYPE B 150 $68.00 $10,200.00 2.15 ALT B: HMA FOR PATCHING 50 $75.00 $3,750.00 2.16 ALT B: HMA WEDGE AND LEVEL, TYPE B 100 $65.00 $6,500.00 2.17 ALT B: ASPHALT FOR TACK COAT 1 $15.00 $15.00 2.18 ALT B: CURB RAMP, CONCRETE, G 10 $145.00 $1,450.00 2.19 ALT B: SIDEWALK, CONCRETE, 41N. 920 $30.00 $27,600.00 2.2 ALT B: CURB, MODIFIED, CONCRETE 625 $22.00 $13,750.00 2.21 ALT B: PCCP FOR APPROACHES, 61N. 35 $50.00 $1,750.00 2.22 ALT B: PCCP FOR APPROACHES, 8 IN. 750 $52.00 $39,000.00 2.23 ALT B: SODDING 840 $452 $3,796.80 2.25 ALT B: ADJUST CASTING TO GRADE 5 $350.00 $1,750.00 2.26 ALT B: ADJUST VALVE BOX TO GRADE 10 $35.00 $350.00 2.3 ALT B: MAINTAINING TRAFFIC 1 $3,500.00 $3,500.00 2.31 ALT B: SIGN POST, SQUARE, TYPE 2, REINFORCED ANCHOR BASE 15 $9.72 $145.80 2.32 ALT B: SIGN, SHEET, WITH LEGEND 0.080" 12 $16.75 $201.00 2.33 ALT B: SIGN AND POST, REMOVE 2 $85.00 $170.00 2.34 ALT B: SIGN AND POST, REMOVE AND RESET 4 $150.00 $600.00 2.35 ALT B: TRANSVERSEPAVEMENT MARKING,THERMOPLASTIC, CROSSWALK LINE, 61N. 44 $7.00 $308.00 2.36 ALT B:TRANSVERSE PAVEMENT MARKING, THERMOPLASTIC, STOP LINE, 241N. 11 $7.00 $77.00 2.37 JALT B:LINE, THERMOPLASTIC, SOLID, YELLOW, 41N. 925 $1.50 $1,387,50 Total= $328,098.46 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 02/21 /17 Name Toy Villa Department Engineering BPW Date 02/28/17 Phone Extension 5920 Required Prior to Submittal to Board Legal ❑ Attorney Name Controller El greater review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ® Change Order No. 6 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control ❑ Other: Company or Vendor Name New Vendor MBEANBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Kequired intormation, Walsh & Kelly, Inc. ❑ Yes ® No ❑ If Yes, Approved by Purchasing I-1 MBE F] WBE U No LJ Yes Name of Company East Bank Sewer Separation — Phase 5 (Division B) Sewer Bond 114-06210 TIF Bond Approval of Change Order #6 ❑ Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc. Required For Chanqe Orders Only Amount of N Increase $ ❑ Decrease $ Previous Amount $ 5,31. Current Percent of Change: 0.94% New Amount $ 5,36, Total Percent of Change: Copy Original ® ❑ Aaron ® ❑ Roger ® ❑ Toy V M 5.58% Dispersal After Approval Nawrot Beth Leonard