HomeMy WebLinkAboutOpening of Bids - Michiana Brick Site Demolition Proj No 116-138 - Green DemolitionFrom time -to time the. Booth Bend Boar d.of PubllcWorks finds It necessa,ryto'reject a bid,because 'it does not comply with statutory requirements In preparing your bid, please' use the following checklist tn:order to make sure that your°bid.is done in the proper manner:, Proper bid security included. The bidder has the option of providinq, either a Certified Check or'Bid Bond.' I Bid prepared<on'the City of South Bend Contractor's Bid, for Public Work Form,` completely executed.. Contractor s Non Collusion and Non Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification;'Non-Discrimination Commitment, and Certification' of use of United States Steel Products or Foundry Products, Proof of MBE/WBE Participation Goal Form (MWBE-1.0); If minimum; participation goal is not meY; also provide Evidence of Good Faith Effqrts Form [MWBE 2.01and MBEMBE Contacted Form (MWBE-2.1]. V Acknowledne;Receint of % Addandiim(sl inrluderiwith tha hirl :This, checklist is, provided: for bidder's use in assuring, corribliance with required. documentation; ,however, it does not include all'specifications requirements. and does not Version 10/17/2016 I Contractor's Bid for Public Works - 1 CITY OF SOUTH :BEND, .IIVDIANA.'' C.0NTRACT0R7S DID FOR PUBLIC WORK mncnianabriCK+Zine oemontion, the City of South Bend, Indiana in accordance with plans and specifications prepared by: The City of South Bend' Depadrnent of Public Works Division of Engineering Version 10/17/2016 Contractor's Bid for Public Works.-;2'.. PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The -financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 10/17/2016 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements be/ou,, it shall attach an erplanation to this Affrdanil. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF A/ ) ) SS: •�T TcQT COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the Version 10/17/2016 Contractor's Bid for Public Works -4 financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. Version 10/17/2016 Contractor's Bid for Public Works - 5 I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16- 8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry. is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. Asa I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this �` day of , 20 JN Printed Name and Title Subscribed and sworn to before me this! ( day of gyp' ✓J— 20� My Commission Expires �� rI A4, �) Nota& Public /- County of Residence KELLY ANN LANG NOTARY PUBLIC — OFFICIAL SEAL State of Indiana, LaPorte County My Commission Expires: October 26, 202 Version 10/17/2016 Contractor's Bid for Public Works - 6 BID/PROPOSAL CITY OF SOUTH BEND Project Name Michiana Brick Site Demolition Project No. 116-138 For Bids Due 9:30 AM on February 14th, 2017 BASE BID Item No. Description Quantity Unit Unit Price Total Amount 1 SITE DEMOLITION 1 LS L�17 Po Li BASE BID TOTAL!` �Q ALTERNATE A Item No. Description Quantity Unit Unit Price Total Amount PAVEMENT AND STORM 1 STRUCTURE REMOVAL 1 LS O(ODO ALTERNATE A TOTAL Ac/j 000 trnmeU Name oT rerson oigning/ Version 10/17/2016 Contractor's. Bid for Public Works -7 w W W CL ❑ Lw U O m W O 2 a j w F OZZ U) N LL 2 }Om0 FWIL w U o W ❑ a O z O 0 z O Q o U W P: m �a W 0 co C OW LL m 2 LL O LL O w IL W m m w � o w c co o G � 0 \ O O m O = a� rn�c C N 7 N dE d y � U N Q1 C O N a� YG a1 O u 3 Q O 3 T a a o c c m E L 'O W 0 W N a 4- c O Ip d U w 00 r c 3 m w �V O. > A r Z z, a� m N = c 0 3 0 N ry a o v C w V w d W ' c y al N a v 3 va � m m o c cw 0 ` Ca v, _r n 10 E a O7 O al C E m 0 0 a O .0 ._ r- C_ C C� so N N m oN \m 0 Ewa � o� a m 1 c o = n ^ 0 E Qw N m O 2 m m N N �] a o � d� c 3 T 0 CL 0 0 V) o d /l o d U N n 0 Q Q 0 L �t U y Cn rE m m E? � W m V \� J O N V a V� E J z � Y I T 0 E a/ E m z c Y U d a 0 a m N `o U m c U C C CITY OF SOUTH BEND O�SUVTII q ry MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM yzv y / FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS ow 11 This completed form should be Included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBENVBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: Project Name: Bidder: Contact Person: Address: City: Email: 116-138 Date: .,? - / ,/- / -2 To determine whether a bidder has demonstrated good faith efforts to reach the MBENVBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below": EVIDENCE OF GOOD FAITH EFFORTS MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South B?.tequires that all perspective bidders complete no less than 2 of the following: Attend all pre -bid meetings scheduled by the City to inform MBENVBEs of contracting and subcontracting opportunities. 2. Advertise in general circulation and/or trade association publications concerning subcontracting V opportunities, and allow MBE/WBEs reasonable time to respond. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBENVBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBENVBE firms. "*Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBENVBEs, including providing such MBENVBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBENVBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBENVBEs in order to increase the likelihood of meeting the MBENVBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBENVBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBENVBE was unqualified to perform the job. "Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 10/1712016 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND o sovi" rFro MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-2.1 MBE/WBE CONTACTED 1tl65 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE / OF � Project Number: 116-138 MBE/WBE Participation Goal 7. / D MBENVBEFirm ��j° C�V6�Z-,iaP(N Owner or Contact at MBENVBE Firm Telephone: 1%3_73/-.''0!�/ Fax: Email: ///U'7C�B�".i'0!3/ylwe ? #-; TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBENVBE FIRM: MBENVBE Firm Owner or Contact at MBENVBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBENVBE FIRM: Version 10/17/2016 Contractor's Bid for Public Works - 10 44vt Init. SAIA Document A310TM -2010 CONTRACTOR: (Name, legal status and address) Green Demolaon Coul,ed... Inc. 1427 W Dickens Ave Chicago, IL 60614 OWNER: (Name, legal status and address) City of South Bond Indiana, Board of Public Works 227 West Jefferson BNtl, Suite 1400 N. South Bend, IN 46601 SURETY: (Name, legal stalls and principal place of business) Developers Surely and Indemnity Company PO Box 19725 Irvin., CA 92623 BOND AMOUNT: 5% not to exceed Twenty -Two Thousand PROJECT: (Name, location or address, and Project number, fan)') Wreck & Removal - 4 Existing Structures - Michiana Brick Site Demolition - Project No. 116-138 at 325 S Frances Street, South Bend, IN This document has important legal consequences. Consultation with an attorney is encouraged with respect to its Completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Sign and sealed this 8th day of February, 2017 Green (Prim fitness) and ,(Seal) (Title) David S. Parrllli - Attorney -In -Fact CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured AIA Document A3101- — 2010. Copyright* 1963, 1970 and 2010 by The American Institute of Architects. All rights resented. WARNING: This AIA" -Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Opoumenl, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, mpydght@aia.org. .1110 POWER OF ATTORNEY FOR DEVELOPERS SURETY AND INDEMNITY COMPANY INDEMNITY COMPANY OF CALIFORNIA PO Sox 19726, IRVINE, CA 92623 (949) 263-3300 KNOW ALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, do each hereby make, constitute and appoln0 "'David Kotula, Robert H. Walker, Meredith C. Covell, Joseph Maderak, Kathy Rzepa, David Pardlll, jointly or severally''' as their true and lawful Altbimey(s)-ImFact, to make, execute, deliver and acknowledge, for and on behalf of said corporations, as sureties, bonds, undertakings and contracts of suretyship giving and granting unto said Allorney(s)-In-Fact full power and authority to do and to perform every act necessary, requisite or proper to be done In connection therewith as each of said corporations could do, but reserving to each of said corporations full power of substitulion and revocation, and all of the acts of said Attorney(s)-In-Fad, pursuant to these presents, are hereby raffled and confirmed. This Power of Attorney Is granted and Is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, effective as of January let, 2008. RESOLVED, that a combination of any two of the Chairman of the Board, the President, Executive Vice -President, Senior Vice -President or any Vice President of the corporations be, and that each of them hereby is, authorized to execute this Power of Attorney, qualiying the attorney(s) named In the Power of Attorney to execute, on behalf of the corporations, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assistant Secretary of either of the corporations be, and each of them hereby Is, authorized to attest the execution of any such Power of Attorney; RESOLVED, FURTHER, that the signatures of such officers may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporations when so affixed and in the future with respect to any bond, undertaking or contract of suretyship to which it Is attached. IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by (heir respective officers saand attested by heir respective Secretary or Assistant Secretary this January 29, 2015. By: OSV AND -Al Daniel Young, Senior Vke-Presldenl yJ�cbooty. Fly iV �pPOgq�09 �^ `r OCT, 2 2V OCT.6 m0 :n By; CMG 0 10 3 e 3 1967 Mark Lansdon, Vice-president d' yOWIN D 2 Og41FOpCOP a` rip * F� A notary public or other officer completing this certigcale verifies only the identity of the Individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On January292015 beforeme, Lucille Raymond Notary Public Dale axe lnexl Nemoa,d T11ea11M1n Dxrcor personally appeared Daniel Young and Mark Landon Neme(e)d&Ipnege) who proved to me on the basis of satisfactory evidence to be the person(s) whose names) Istria subscribed to the within Instrument and acknowledged to me that hetshelthey executed the same In hislher/their authorized capadlyies), and that by his/herfielr signalure(s) on the Instrument the person(s), or the sadly upon behalf of LUCILLE RAYMOND which the person(s) acted, executed the Instrument. Commission 1112001945 Notary Public• California I coriy under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is Orange County we and correct. My Comm. Expires Oct 13, 2019' WITNESS my hand and official seal. Place Notary Seal Above Signature LucI1IVy0mnd, Notary Public r CERTIFICATE The undersigned, as Secretary or Assistant Secretary of DEVELOPERS SURETYAND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA, does hereby sedgy that the foregoing Power of Attorney remains in full force and has not been revoked and, furthermore, that the provisions of the resolutions of the respective Boards of Directors of said corporations set forth in the Power of Attorney are in force as of the dale of this Certificate. This Certificate Is executed In the City of Irvine, California, this Brli day of Cossle 10IMST010, Assistant z,coubtary ID-1380(Rev.01115) 1316 COUNTY -CITY BUILDING 227 W. JErFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject PHONE 574/235-9251 FAX 574/235-9171 TDD 574/ 235.5567 CITY OF SOUTH BEND PETE BUTTIGIFG, MAYOR BOARD OF PUBLIC WORKS February 7, 2017 All Bidders Linda M. Martin, Clerk, Board of Public Works Addendum Number: 1 Project Name: Project Number: Michiana Brick Site Demolition 116-138 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: , This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Date: GREEN DEMOLITION 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office:312-409-4771 Fax:773-477-7149 SECTION I EXPERIENCE QUESTIONNAIRE "Recycling Today For A Greener Tomorrow" GREEN DEMOLITION 1427 W. Dickens Ave, Suite 200 Chicago, IL 60614 Office: 312-409-4771 Fax:773-477-7149 February 14, 2017 City of South Bend Indiana Board of Public Works South Bend, Indiana Re: Michiana Brick Site demolition Projects Completed City of South Bend Demolition of Vacant and Abandoned Houses Phase V Various Properties throughout South Bend Indiana City of South Bend Demolition of Vacant and Abandoned Houses Phase IX Various Properties throughout South Bend Indiana City of South Bend Demolition of Polish National Alliance Building 2400 Western South Bend, In Wreck and remove Structure Complete City of Joliet 500 Shelby Wreck Removals of Structure City of Chicago 121 N. LaSalle Street 3rd, 4th, 5th, 7th and 1Ith Floor Selective Removals Village of Lemont 12890 Main - 10970, 80 and 90 Archer Wreck Removals of Four Structures City of Chicago 2023 South Ashland Emergency Hand and Wreck Removals of Dilapidated Building City of Chicago 3050 N. Rockwell Wreck Removals of Dilapidated Building Cook County Land Bank Authority Various Properties Chicago Land and Cook County Wreck Removals of Dilapidated Buildings Chicago Housing Authority 5040 North Kenmore Wreck and Selective Removals of Four Story Residential Building Chicago Zoological Society Brookfield Zoo Selective and Wreck Removals of Scales and Feathers Structure Respectfully submitted, Michael Brough, President Green Demolition Contractors, Inc, "Recycling Today For A Greener Tomorrow" GREEN DEMOLITION 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office:312-409-4771 Fax:773-477-7149 February 14, 2017 City of South bend Indiana Board of Public Works South Bend, Indiana PUBLIC WORKS PROJECTS IN PROGRESS Cook County Land Bank Authority $ 131,000.00 Demolition and Deconstruction of Various Vacant and Abandoned Properties throughout Chicago Land and Suburbs Norridge Park District $ 40,000.00 Demolition and Complete Removal of Unused Shed on Park District Property Respectfully submitted, Michael Brough, President Green Demolition Contractors, Inc. "Recycling Today For A Greener Tomorrow" GREEN DEMOLITION 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office: 312-409-4771 Fax:773-477-7149 February 14, 2017 City of South bend Indiana Board of Public Works South Bend, Indiana Re: Michiana Brick Site Demolition Information Regarding Failure to Perform Work Not Applicable. Green Demolition Contractors Incorporated has never failed in any way to perform or complete any work awarded since its inception. Respectfully submitted, Michael Brough, President Green Demolition Contractors, Inc. "Recycling Today For A Greener Tomorrow" Ar Realty Advisors July la, 2016 To whom it may concern: Green Demolition has been retained by CH Realty Advisors, LLC in its capacity as a court appointed receiver on multiple projects in the last fives years. As a court appointed receiver and arm of the court, I have chosen to work with Green Demolition because of their straight forward business practices, fast response time, and on site safety protocol. Green Demolition has always: demonstrated a positive attitude towards the common goal of completing a job, I know when I hire Green Demolition the scope of the work will be completed on time and to the proper specs, I could only hope all my vendors were as reliable as Green Demolition, CR Realty Advisors, LLC 325 West Huron, Suite 708 Chicago, Illinois 60654 Office: 912.332.7100 Fax: 312.332.7102 CR-RA,com GREEN DEMOLITION Office:312-409-4771 Fax: 773-477-7149 Section II Plan and Equipment Questionnaire 1. Green Demolition Contractors Incorporated will mobilize at the site and perform inspections. We will confirm utilities are disconnected, abatement is complete (if applicable), and the structure is free of pedestrians. Then, we will demolish the structure. We will salvage and recycle materials (if applicable) to meet qualifications and load out debris. Concrete and brick will be demolished and loaded out. We will backfill and compact site and deliver and spread black dirt. This will be repeated at each property. After all properties are complete, we will confirm the seeding at each property. 2. Waste Management Disposal 2221 W. Mt. Pleasant Muncie, Indiana 3. Not Applicable 4. (1) One CAT 320 Excavators (1) One T-300 Skid Steer (1) One Mack Semi 65 yard Roll Off (1) One Mack 6 Wheeler 40 yard Roll Off (1) One Mack Semi Low Boy 5. Yes "Recycling Today For A Greener Tomorrow" GREEN DEMOLITION 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office: 312-409-4771 Fax: 773-477-7149 February 14, 2017 City of South Bend Indiana Board of Public Works South Bend, Indiana Re: Michiana Brick Site Demolition Project Green Demolition Contractors Incorporated will Mobilize upon Contract Award and Notice to Proceed. We will immediately proceed with structures requiring abatement (if applicable) and verify that the disconnects, etc for any remaining structures per discussions at the pre -bid held February 6, 2017 have been completed. Green Demolition Contractors Incorporated will then subsequently begin the wreck and removal process of structure(s) that have been previously abated. All work is to be performed within the durations noted in the pre -bid meeting February 6, 2017. Respectfully submitted, Michael Brough, President Green Demolition Contractors, Inc. "Recycling Today For A Greener Tomorrow" GREEN DEMOLITION February 14, 2017 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office: 312-409-4771 Fax: 773-477-7149 City of South Bend Indiana Board of Public Works South Bend, Indiana Re: Michiana Brick Site Demolition Sub Contractors Previously Utilized Sub -Contractors Previously Utilized Abatement Interstate Environmental Services, Inc. 337 West 806 North Valparaiso, Indiana 46385 Phone: (219)762-7724 Fax: (219)763-0609 Hauling /Disposal Kennedy Express Line Inc. 4324 Ashard Drive South Bend, Indiana 46628 (574)876-8821 Concrete Cutting & Sawing Cobra Concrete Cutting Services, Inc. 2416 East Oakton Street Arlington Heights, Illinois 60005 Phone: (773) 775-1111 Respectfully submitted, Michael Brough, President Green Demolition Contractors, Inc. "Recycling Today For A Greener Tomorrow" GREEN DEMOLITION 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office: 312-409-4771 Fax: 773-477-7149 February 14, 2017 City of South Bend Indiana Board of Public Works South Bend, Indiana Re: Michiana Brick Site Demolition Workers / Equipment Green Demolition Contractors Incorporated proposes to complete their work utilizing the following Number of Men and Equipment: One (1) Union Operating Engineer One (1) Union Laborer One (1) Caterpillar 320 Excavator with Grapple One (1) S300 Skid Steer with Grapple Respectfully submitted, Michael Brough, President Green Demolition Contractors, Inc. "Recycling Today For A Greener Tomorrow" Equipment List Green Demolition Contractors Incorporated Qty Description 8 Overseas Containers Convereted for Roll Off Truck 2 40 Yard Roll Off Boxes 8 30 Yard Roll Off Bees 6 20 Yard Roll Off Boxes 4 10' Snow Pushers for Bobcat Custom Fabricated 1 Flat Deck for Roll Off w/ Built In Wench 1 20 Ton Flat Deck Trailer 1 10 Ton Flat Deck Trailer 1 Bobcat Tag Trailer 1 Tilt Deck Trailer 1 Flat Deck Single Axel 1 963 Bobcat 2 863 Bobcats 1 5-185 4 5-260 2 S-300 2 S-70 4 463 1 553 1 763 1 T300 1 853 i Ingersol Rand Mason Lull 2 Lull Conversion Brackets 1 320 excavalmWrecking Pole 5 Wrecking Poles 1 80" Root Grapple Bucket 14 Grapple Buckets 4 Bobcat Hammers 15 Misc. Buckets for Bobcat 2 Terminators 2 320 Excavator Caterpillar 1 331 Excavator 1 432 Excavator 1 2011 GalbreathSeml Roll Off Trailer 2 65 Yard Roll Off Boxes 2 Excavator Hammers 1 Excavator Grapple Misc Hand Tools, Boxes, Equip Le, Saw, Air Hammers, etc 1 Atlas Capeo 186 Air Compressor 1 Ingersoll Rand 185 Air Compressor 1 Ingersoll Rand 250 Air Compressor 10 Cargo Trailers 1 Water Trailer 1 lowboy Trailer Misc. Inventory Steel I Beams Misc. Inventory Lumber GREEN DEMOLITION 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office: 312-409-4771 Fax: 773-477-7149 It is the policy of Green Demolition Contractors Incorporated LLC to provide equal employment opportunity (EEO) to all persons regardless of age, color, national origin, citizenship status, physical or mental disability, race, religion, creed, gender, sex, sexual orientation, gender identity and/or expression, genetic information, marital status, status with regard to public assistance, veteran status or any other characteristic that is protected by Federal, State or Local Law. In addition, Green Demolition Contractors Incorporated LLC will provide reasonable accommodations for qualified individuals with disabilities. Green Demolition Contractors Incorporated LLC's goal is to increase representation of women, people of color, veterans and individuals with disabilities. Our programs and training are designed to apply to all applicable federal, state and local laws, ordinances and regulations and cover all human resource actions including employment, compensation, benefits, training, education, tuition aid, transfers, promotions and social/recreational programs. Green Demolition Contractors Incorporated LLC CEO and senior leadership along with Local Branches of International Operating Engineers Union and International Brotherhood of Laborer's Union regularly receive and review affirmative action reports and monitor progress, reinforce policies and hold the organization accountable to meet objectives. Michael Brough, President and Norman Bennett, Business Manager are responsible for leading Green Demolition Contractors Incorporated LLC's affirmative action efforts and ensuring that the principle of equal employment opportunity is understood and followed. The Human Resource head, is responsible for local efforts. All members and management must be familiar with this policy, must fully support it and are responsible for applying these principals in good faith. All employees are responsible for conduct consistent to demonstrate respect for all co- workers. All statements are posted in the Corporate Office and in the HR Office and may be reviewed by applicants and employees on weekdays during normal working hours. Michael J. Brough President and Chief Executive Officer "Recycling Today For A Greener Tomorrow" Green Demolition Contractors Incorporated GREEN Company Policy Green Demolition Contractors Incorporated recognizes that all businesses can have a direct or indirect impact on their local, regional, and global environment. As a result Green Demolition Contractors Incorporated has developed a Green Policy in order to minimize their environmental impact. Efficient Use of Energy Green Demolition Contractors Incorporated and its staff use and purchase energy star -compliant hardware whenever possible. Encourage Conservation Green Demolition Contractors Incorporated staff and employees are encouraged to conserve energy whenever possible Minimize Waste Green Demolition Contractors Incorporated staff sends sales quote via email unless the customer specifically requests that the quote be sent using an alternate communication channel. This is done In order to minimize paper waste. Recycle All Green Demolition Contractors Incorporated employees are encouraged to reuse paper for note -taking where appropriate refurbished equipment or parts are considered. ESD Option All of Green Demolition Contractors Incorporated titles are available electronically, unless the customer chooses to receive physical media Green Demolition Contractors Incorporated software and key codes are delivered electronically via download and email. Telecommuting Many Green Demolition Contractors Incorporated staff members telecommute, to help reduce our corporate carbon emissions. Spread the Word Green Demolition Contractors Incorporated has added a Green Tips section to the Green Demolition Contractors Safety Manuals and Haz-Com Material Handouts to share their tips for being green. Green Demolition Contractors Incorporated is primarily an e-business. The vast majority of customer contact is virtual. Green Demolition Contractors Incorporated encourages all staff to conserve, reuse and recycle, Green Demolition Contractors Incorporated makes every effort to be an environmentally responsible GREEN DEMOLITION 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office: 312-409-4771 Fax:773-477-7149 Green Demolition, Inc. was founded in July 2007 and is a fully licensed, bonded, and insured demolition company servicing the Midwest. Our management team possess over 50 years of field experience. We are a proud signatory contractor with the International Laborer's Union of North America and the International Union of Operating Engineers, as well as a member of the National Association Demolition Contractors. We are LEED experienced and a lead -safe certified firm. Green Demolition is licensed and bonded in the City of Chicago and Cook County. Green Demolition specializes in a variety of services including: • Selective Demolition • Total Building Demolition • Mechanical Demolition • Structural Demolition • Selective Excavation • Concrete Crushing • Scrap Recovery • Fire and Disaster Relief Work • Waste Hauling • 24-Hour Emergency Service We service Industrial, Manufacturing, Commercial, Schools, Hospitals, Public, Municipal and Government Sectors. Our mission is to provide every client with safe, innovative, cost-effective and environmentally sound solutions while promoting a standard of excellence with our trained Union Field personnel. Green Demolition strives to reuse and repurpose our demolition material by utilizing sustainable deconstruction practices minimizing waste and recycling all material possible in order to ensure a positive impact on the environment. "Recycling Today For A Greener Tomorrow" GREEN DEMOLITION 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office: 312-409-4771 Fax: 773-477-7149 Purchasing Policy Statement of Purpose This shall be known as the Green Demolition Contractors Inc., Purchasing Policy. Its purpose is to ensure that Green Demolition Contractors Inc., purchases recycled and other environmentally preferable products whenever they meet cost and performance requirements. Definitions "Environmentally Preferable Products" means products that have a lesser impact on human health and the environment when compared with competing products. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product. "Recycled Products" are products manufactured with waste material that has been recovered or diverted from solid waste. "Practicable" means sufficient in performance and available at a reasonable cost. "Cost" means the total expense of the product including the initial price, lifecycle costs, and disposal costs "Price" means the initial expense to acquire the product. Statement of Policy Green Demolition Contractors Inc., shall purchase recycled and other environmentally preferable products whenever practicable. Green Demolition Contractors Inc., shall require contractors and consultants to use recycled and other environmentally preferable products whenever practicable. Statement of Procedure Green Demolition Contractors Inc., shall be responsible for coordinating implementation of this policy as follows: 1. Assign appropriate personnel to fulfill the requirements of this policy. 2. Research opportunities for procurement of recycled and other environmentally preferable products and communicate these to purchasing decision makers for evaluation and purchase. 3. Collaborate with specifying agenciesto prepare or revise bid documents and contract language where necessary to implement this chapter. 4. Collect data on purchases by Green Demolition Contractors Inc., of recycled and other environmentally preferable products. "Recycling Today For A Greener Tomorrow" GREEN DEMOLITION 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office: 312-409-4771 Fax: 773-477-7149 5. Prepare and submit an annual report to Green Demolition Contractors Inc., by Jan 30th of each year, describing the progress of Green Demolition Contractors Inc., in implementation of the policy, including the following elements: a. Quantities, costs, and types of recycled and other environmentally preferable products purchased; b. A summary of savings achieved through the purchase of recycled and other environmentally preferable products; c. A summary of program promotional efforts; d. Recommendations for changes in procurement policy. 6. Promote the use of recycled and other environmentally preferable products by publicizing its environmental purchasing policy and its implementation. 7. Educating staff about the policy and listening to staff comments and suggestions. Exemptions Nothing in this policy shall be construed as requiring the purchase of products that do not perform adequately or are not available at a reasonable cost. Implementation This policy shall be effective immediately from the date of signature. Dated the _ day of 2015 Signature "Recycling Today For A Greener Tomorrow" GREEN DEMOLITION 1427 W. Dickens Ave. Suite 200 Chicago, IL 60614 Office: 312-409-4771 Fax:773-477-7149 Project: Recycling Scope: Green Demolition will and is currently pursuing a recycling at Green Demolition is using it owns dumpsters to recycle all metals which may include any all of the following, desks, file cabinets, pipe, conduit, tee grid from the ceilings, and wiring. Green Demolition is also using it owns dumpsters to recycle all concrete, brick and block, etc that we will be removing and disposing of. a contracted waste hauler will also be segregating materials at a transfer site that were hauled from . Materials that will salvage for reuse are paper, cardboard, wood, plastics, metals, brick, block, and concrete. End of month reports will be generated showing percentages of recycled materials to waste disposed of in an approved land fill. A final report will be generated at the end of the project showing a combined report for the demolition debris at Respectfully, Green Demolition, Inc. Laura Brown laura a,greendemolitioninc.com 773-477-7160 direct 773-477-7149fax "Recycling Today For A Greener Tomorrow"