Loading...
HomeMy WebLinkAboutChange Order No. 1 - Century Center CEO Suites Suite 17 Remodel Proj No. 116-010 - Holladay Construction Group1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND_ INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS January 24, 2017 Al Lusk Holladay Construction Group 227 S Main Street, Suite 200 South Bend, IN 46601 RE: Change Order No. 1 - Century Center CEO Suites — Suite 17 Remodel Project No. 116-010 Dear Mr. Lusk: PHONE 574/235-9251 FAx 574/235-9171 The Board of Public Works, at its meeting held on January 24, 2017, approved the above referenced Change Order for a decrease of $12,078 and an additional twenty-eight (28) calendar days, bringing the current contract amount to $205,984 and the new project completion date to January 23, 2017. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, LC4 �2 Linda M. Martin, Clerk Enclosure c: Rich Estes, Engineering Scott Herczeg, Century Center Leanna Belew, Century Center GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO. CITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER 01-24-2017 116-010 Century Center — CEO Suites — Suite 17 Remodel 9-6-2016 SUBJECT OF CHANGE ORDER: Time Extension and additional work. See attached explanation of work All items completed substantially as planned. _See attached Comparison of Estimate for overruns and underruns The original contract sum $ 218,062.00 Net change by previously authorized change orders $ 0.00 The contract sum prior to this change order $ 218,062.00 By this Change Order, the project amount is ❑Increased The new contract sum including this change order This Change Order represents a total change of Total change for entire project ® Decreased $ (12,078.00) $ 205,984.00 (5.86) % (5.86) % Original contracted completion date/time 12-27-2016 Extension of date/time by previous change orders 0 days Date/time extension by this change order 28 days New completion date/time 01-23-2017 --RECOMMENDED FOR APPROVAL '//l� CONTRACTOR Project Manager 1► �, Al_ .ck oi1 Printed i Name andTitle Holladay Construction Group Company name 227 S. Main Street Suite 200 Address South Bend Indiana 46601 City, State, Zip CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: Gary President i Elizabeth A. Maradik, Member A Suzanna MSuzanna FrAberg, Mem erMem er Therese J. Dorau, Member Ja es A. Mueller, Member INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Richard Estes, Engineer I SUBJECT: Century Center — CEO Suite — Suite 17 Remodel Costs related to change in scope of work resulting from unforeseen conditions and program changes Project No. 116-010 DATE: January 24, 2017 Here is an explanation for the Change Order being submitted. The reason(s) for the Change Order request is as follows: 1. Removal of mirrors, delete solid surface restroom doors, delete new exterior window, and new entry door and sidelite, etc. were deleted from the scope of work as directed by the Owner. 2. Changes to casework in Wet Bar / Closet Room No. 205 resulting from unforeseen existing conditions. 3. Changes to electrical feed above ceiling serving receptacles above wet bar in Lounge Room No. 202, as a result of unforeseen conditions. 4. Add stainless steel bar sink and faucet in Lounge Room No. 202 to replace existing unit. 5. Remove and replace existing ceiling tile and grid in Lounge Room No. 202 to make entire ceiling uniform. The deduct amount for this work shall be $12,078.00. This represents a decrease of 5.86% for the overall project cost. 28 calendar days are also being added to the completion date. Please call me with your questions (5896). Change Order No.1 Century Center CEO Suite - Suite 17 Remodel Project No. 116-010 OWNER: City of South Bend ENGINEER: Alliance Architects CONTRACTOR: Holladay Construction Group PROJECT: Century Center — CEO Suites — Suite 17 Remodel Project No. 116-010 SUBJECT: Change Order Number 1, Explanation of Costs ISSUE DATE: January 24, 2017 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The changes to the scope of work listed herein result from corrections to existing, and unforeseen, conditions involving both general construction and electrical items. The changes to eliminate the new door and sidelight to Suite 17 Room No. 101 and new exterior window in Conference Room No. 207, and others, were directed by the Owner. The work description for the changes applied to this change order is describe below: Work Description: 1. Delete all mirrors from the scope of work Deduct $640.00 2. Delete solid surface stall door from Toilet Room #103 Deduct $970.00 3. Add 3 (three) Type "A" wall mounted light fixtures to Suite 17 Room No. 101 Add $964.00 4. Add door frames in Suite 17 (total 3) Add $400.00 5. Delete solid surface bar sink in Suite 17 — Room No. 101 Deduct $300.00 6. Add stainless steel bar sink to Lounge Room No. 200 Add $610.00 7. Delete new exterior window in Conference Room No. 207 from the scope of work Deduct $7,892.00 8. Revise casework and add access panel in Wet Bar/Closet Room No. 205 Deduct $440.00 9. Delete new entry door and sidelight to Suite 17 Room No. 101 from the scope of work Deduct $4,442.00 10. Remove and replace existing acoustical ceiling tile in Lounge Room No. 202—CCD No.5 Add $733.00 SHEET 1 OF 2 Change Order No.1 Century Center CEO Suite - Suite 17 Remodel Project No. 116-010 11. Delete full -height backsplash at each wet bar counter, Suite 17 Room No. 101 and Lounge Room No. 202 Deduct $1,350.00 12. Provide overhead electrical feed to receptacles above wet bar in Lounge Room No. 202; Provide custom trim for new downlights in Hall Room No. 102 Add $1,064.00 13. Change lockset (Door C-1) between Ticket Office Room No. 200 and Lounge Room No, 202 to keyed function each side. Add $185 00 Subtotal Deduct ($12,078.00) XIII. PROSECUTION AND PROGRESS Revise the following: 1. The project will have a Substantial Completion date of 443 141 calendar days from the date that the Notice to Proceed is issued and a Final Completion date of 4-20 148 calendar days from the date that the Notice to Proceed is issued. Total Change Order Request: Deduct $12,078.00 and add 28 calendar days. END CHANGE ORDER 1 SHEET 2 OF 2 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 01/06/2017 Department Public Works Name Richard Estes Division/Bureau Engineering BPW Date 01/24/2017 Phone Extension 5896 Required Prior to Submittal to Board Legal ® Attorney Name: Michael Schmidt Controller El greater review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ® George King r Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ® Change Order No. 1 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control: I-1 Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Amount of L I Increase ® Decrease 116-010 Hotel -Motel Tax 7304-42010-0000-0099 Change order to reflect changes to scope of work due to unforeseen conditions involving both General Construction and Electrical, as directed by the Owner. ❑ Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) Previous Amount $ 218 Current Percent of Change: (5.K New Amount $ 205 Total Percent of Change: (5.86) Copy Original ® ❑ ® ❑ and add 28 calendar s:- Leanna Belew, Scott Herczeg (Century Center) Bill Lamie. Joe Nucciarone (Alliance) AI Lusk, Holladay Construction Group