HomeMy WebLinkAboutOpening of Bids - Newman Center Masonry Work Project No. 116-132 - C&S Masonry - AwardeeTO: Linda M. Martin, Clerk Board of Public Works FROM: SUBJECT: DATE: INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Rich Estes, Engineer I Newman Center Masonry Repair Project No. 116-132 January 10, 2017 On January 10 2017, the Board of Public Works opened and read bids for the above project. The bidders ranked by Base Bid Amount as follows: Bidder Base Bid Amount 1. C&S Masonry Restoration, LLC. $183,000.00 2. Ziolkowski Construction, Inc. $187,488.00 3. Bornor Restoration, Inc. $319,455.00 The Division of Engineering has reviewed all of the quotes and recommends that the Board award the contract to the lowest responsive / responsible bidder, C&S Masonry Restoration. LLC, in the amount of $183,000.00. This includes the base bid and all alternates. Sufficient funds have been appropriated through REDA TIF, Fund No. 429-1050-460- 42.02. Please call with your questions. (5896) Enc: Bid Tab C u O O O O O C O O O O O = O O C O C O ti O O = y O O ID O O O O oN O C O] dM G ro ¢ m a E c a v E c w 0 Q7 O o N 1(1 - W Q O N N Q1616 OU tO iO r O N N .v VI M m i+ — N N W (O m C G 0 C o V 0 v o o v a U Y O M V Y W U Y p 0 2 N N O O O O O C O O O O O G O O O O O N O N £ ,O1-i a vO1i E c m m = r� rm �n 2 r v �n v Q m" o� Q a v' Q m nj v — C t0 r N C 'i ci N N f4 W O m O N N O Y O M N m Vy0- O O vn vt an Yi tp v O O O O v O O v p O O O _ p r O N V p M a p n d U ti tOD i 2 C W O � p C W J O O O O O O O O O O = O O O O O m a m o E o No E o E oo no N m Q. m N N — is ti — m m ti ti w o `o oa Y `o ti � 0 = 0 0 O o U. O m O O N N c Q Q H _C��+N N NET )�� � rc �n u O Q 6 N N? O �• U a-i O_ O N u+ Y p m o ¢ o Q o m v w f z E z o w m a r ¢ v `—° �- E r m¢ v O Q v p E cn N m v N o E m O w z v 3 E o o m ¢= E 3 w 'E W U oM. v t3 m N N i n` � ❑ u 3 ii F v o u W 6 0 0 Z N Z Z ti N N N 4eurtr8 f City of Send, Indiana Contractor's Bid for Public Work Project Name Newman Center: Masonry Repair Project No.. 116-132 For Bids Due 9:30 am, January 10, 2017 PART (Must be completed for all bids. Please type or print) Date: ` 1-1a-2-ok7 Bidder (Firm): Sb�Aa}y;s l�ii f��S�z'at4�rac1 LCL. Address: 3i25- A). �t rrmnJ c_ r'. +rFe : $!— CitylStatelZip: j;. 4a.. 6 arrJ Telephone Number: (5-7y,) 64,S Agent of Bidder (if Applicable): lgi- Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to Complete the p blic works project of: the City of South Bend, Indiana, in accordance with pans and specifications prepared by: Stti;�.Di1♦' F�. D�li°�L6J- � JiSS�rks�j r �.iJG and dated y 1t-z t--i for the scum of (enter the Total Bid as shown on the Proposal) ed f,____ < E't . i( IV+i�i Y✓1i4f1.J ) (Enter sum of Total Base Fid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on_a separate attachment. By .j CJ 11 tom► a" (Signature) 5 e-j e- (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this day of 20 Subject to the following conditions: BOARD dF �LIQ,WgDR 5 GM, Presid nt Sff2,ffnnaVFrftbe , M Elizabeth A. Maradik,"Member Therese J. Dorau ember James A. Mueller, Member Attest: Linda M. Martin, Clerk Version 10/17/2016 Contractor's Bid for Public Works 2 BID/PROPOSAL CITY OF SOUTH BEND Project Name Newman Center: Masonry Repair Project No. 116.132 For Bids Due 9:30 am, January 10, 2017 BASE BID @&OUTHp 1 MACE y C Item No. Description Quantity Unit Unit Price Total Amount Clean, restore (repair, replace, 1 tuckpoint, etc.), and Seal with Lump 1 penetrating water repellent the existing Sum Masonry Fagade. Tent and heat portion of masonry rebuild 2 areas as required for intermediate date 14 Days d D 2 / cgw completion. BASE BID TOTAL (" r CL ALTERNATES Item No. Description Quantity Unit Unit Price Total Amount 1 Clean and remove paint from concrete Lump 1 Walls around perimeter Sum Infill existing window and door openings 2 and cut new openings for future Sump 1 windows Bidder (Firm): C `� 1�4jiti RS''i©.ti i}—T�cJ LL.0 Address: 3-7 +,,*J C-r -Su';4-,e, ►i� City/State/Zip: S. GQ�J 0 =tj Telephone Number: (�'1`I By r11millM (Signature) , Sieve 1, zlulS (Printed Name of Person Signing) Version 10/17/2016 Contractor's Bid for Public Works - 7 MERCHANTS � BONDING COMPANY.. MERCHANTS NATIONAL BONDING, INC. P.O. BOX 14498, DES MOINES, IOWA 50306-3498 Bid Bond PHONE: (800) 678-8171 FAX: (515) 243-3854 Bond Number: CONTRACTOR: SURETY: (Name, legal status and address) (Name, legal status and principal place C&S Masonry Restoration, LLC of business) 3725 N. Foundation Ct., Suite AB Merchants National Bonding, Inc. South Bend, IN 46628 A Corporation 6700 Westown Parkway, West Des Moines, IA 50266 OWNER: (Name, legal status and address) City of South Bend, Indiana Board of Public Works 227 West Jefferson Blvd This document has important legal South Bend, IN 46601 consequences. Consultation with an attorney is encouraged with BOND AMOUNT: Five Percent (5%) of Accompanying Bid respect to its completion or modification. PROJECT: Any singular reference to (Name, location or address, and Project number, if any) Contractor, Surety, Owner or Newman Center: Masonry Repair other party shall be considered Project No: 116-132 plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material famished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this IOth day of January, 2017 C&S Masonry Restoration, LLC ) (Principal) (Seal) (Witness) 01Le; piLeSt�w� (Title) .DQ Merchants National Bonding, Inc. _ �, ._.f�• (Surety)' c `(Seal) (Witness) ✓� e) . Kevin Hughes, Attorney -in- ct CON 0657 (2/15) Printed in cooperation with. Ameri n nstitute of Architects (AIA). e lanlntage in this document conforms exactly to the language used in AIA Document A310-Bid Bond-2010 MERCHANTS BONDING COMPANYI POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Dawn M Pequignot; Elaine K Miller; Harold E Everett; J Kevin Hughes; Jada M Karst; Katherine J Ortiz; Marie E Comparet; Melody S Hoerl; Thomas J VanDyck; Tom McGovern their true and lawful Attorney(s)-in-Fact, to make, execute, seal and deliver on behalf of the Companies, as Surety, bonds, undertakings and other written obligations in the nature thereof, subject to the limitation that any such instrument shall not exceed the amount of: TWENTY MILLION ($20,000,000.00) DOLLARS This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October24, 2011. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed:" In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given to the Attomey-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attonr in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 26th day of August , 2015 . uj: :rc: 1933It ' :°6 C . MERCHANTS BONDING COMPANY (MUTUAL) MERCHANTS NATIONAL BONDING, INC. By C%7��f �c�// - " STATE OF IOWA „a..,., „urx,•��' .. COUNTY OF Dallas as. President On this 26th day of August , 2015 , before me appeared Larry Taylor, to me personally known, who being by me swom did say that he is President of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. WENDY WOODY Commission Number 784654 My Commission Expires UC�L Qq June 20, 2017 Notary Publi , County; Iowa (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 10th day of January , 2017 a iZ ION4�'`^ ,00 R4j 4 S: T_-. 2003 �O\NG• Co�A • O.PO ••O:GOP 9q�9y�: •z: a'• 1933 ; c; .ti It 17 ��.� ���. Secretary POA 0014 (6115) .pUxft'.':'. 0 F j CITY OF SOUTH BEND, INDIANA 6 i. Contractor's Bid for Public Work t8b CHECKLIST FOR BIDDERS Project Name Newman Center: Masonry Repair Project No. 116-132 For Bids Due 9:30 am, January 10, 2017 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and _✓ Certification of use of United States Steel Products or Foundry Products. Proof of MBEMBE Participation Goal Form [MWBE-1.0j. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted Form [MWBE-2.1]. Acknowledge Receipt of Addendum(s) included with the bid. All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. / This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Date: t �tMI ZU' 7 By Authorized Representative: Signature: Print Name & Title: `2> t �' �'— V+ e? % o vLe_ Jkees., e.w} Version 10/17/2016 Contractor's Bid for Public Works 1316 COUNTY•Crry BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601.1830 a 46 ��yaor ISfi3 PHONE 574/235-9251 FAX 574/235-9171 TDD 574/235.5567 CITY OF SOUTH BEND PETF BUTTIGIFG. MAYOR BOARD OF PUBLIC WORKS Date: January 5, 2017 To: All Bidders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: Newman Center: Masonry Restoration Project Number: 116-132 This addendum is being forwarded to you for the above referenced project, Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The items and attached documents of this Addendum shall modify and become a part of the Contract Documents for this project. Failure to acknowledge this Addendum will be grounds for rejection of Bid. ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: Company: Authorized Signature: T( 04 yoU TR 44, �d ,F rL U O ,� vucr y 1965 R ADDENDUM No. 1 NEWMAN CENTER: MASONRY REPAIR PROJECT NUMBER 116-132 JANUARY 5, 2017 To: All holders of the contract documents for the above project. The items in this addendum are to become a part of the original documents as if included therein. Only the noted items are affected, and the remainder of the original contract documents is to remain in its entirety. This addendum modifies the contract documents as follows: PART 1: CLARIFICATIONS 1.01 There is an intermediate completion date of April 14, 2017 for work required to be completed for installation of roof (roof work is part of separate contract). These areas are marked on Sheet 2, Detail 3 Roof Plan. The included area is revised to also include the south-east corner / east gable area rebuild section; see Sheet 3, Detail 2 East Elevation. Also to be included within the intermediate completion time is the removal and storing on site of all stone copings at east upper - level portion of building. 1.02 Liquidated damages shall apply to both the intermediate completion date and the final completion date. 1.03 Provide separate line item within the Contractor's Bid for tenting and heating. Unit shall be Days and Quantity shall be 14. If more days are required, the established unit price shall be used as a baseline. This line item is to be included within the total Base Bid. During construction, this item shall be used only after receiving written approval by the Owner. The Owner's Inspector shall verify installation and total use of Item before payment is provided. 1.04 Contractors may use acidic cleaners as necessary to remove mortar from fagade at restoration areas. Test an inconspicuous area first to ensure no negative effects on brick. 1.05 Grey shaded area on Sheet 4, Detail 1 North Elevation below the barrel roof area should be rebuilt. Newman Center. Masonry Repair / Addendum 01 Project No. 116-132 January 5, 2017 Page I 1 1.06 Chimney will require restoration work and complete cleaning, and all associated costs shall be included in the Base Bid. Chimney will not require 100% re -pointing; re -point only where required. 1.07 Contractors shall make a reasonable effort to remove all plant material from the building fagade without damaging existing veneer. It is understood that 100% removal of all plant debris may not be feasible. 1.08 Contractors shall remove all existing caulk from brick head & bedjoints, even where not specifically shown on drawings, and re -point as necessary. This condition is most prevalent at and around window heads. 1.09 Contractors shall have within their Base Bid a cost to cover the following minimums: A. Brick Re -pointing: 1,750 sq.ft. B. Replacing spalled bricks: 750 bricks 1.10 Provide Alternate No. 1 cost for cleaning and removing paint from all exposed vertical concrete building walls. The 4'-0" tall half -wall at current gas meter assembly near the existing garage door is excluded from this alternate. 1.11 Provide Alternate No. 2 Cost for infilling existing window & door openings with brick to match existing building; and cutting openings and installing lintels for new windows as shown on the revised Drawings. Cost will include infilling five (5) total windows (130 sq.ft.) and two (2) doors (85 sq.ft.) Cost shall include removing any steel lintels, soldier bricks, and sills. New openings will require (3) steel angle lintels each and soldier course header. PART 2: SPECIAL PROVISIONS 2.01 Add the following sub -items to Special Provisions Section XXI - Description of Work, Part B - Additions: 4. Alternate No. 1 covers the cleaning and removing paint from exposed vertical concrete walls around the building perimeter. 5. Alternate No. 2 covers the infilling of (5) existing windows and (2) doors with brick; and cutting (2) new openings and installing lintels in preparation for future windows (window assembly and installation is part of separate contract.) PART 3: DRAWINGS 3.01 See attached Construction Drawings dated Revision 1: January 5, 2017 for all changes described within this addendum. Attached pages Sheet 2-Sheet 4. Newman Center: Masonry Repair J Addendum, 01 Project No. 116-132 January 5, 2017 Page 1 2 PART 4: SPECIFICATIONS 4.01 Add "Division 03: Concrete" and "Section 030130: Concrete Cleaning" to the Table of Contents, Additional Sections. Revise Additional Sections page count to 41Pages. 4.02 Insert attached Division 03 Cover Page and Specification Section 03 0130 — Concrete Cleaning for specification related to Addendum No. 1 into Specification Book. 4.03 Delete original Contractor's Bid for Public Works page 7 and replace with revised attached page 7. PART 5: ATTACHMENTS 5.01 Revised Construction Drawings: (3) Pages 5.02 Specifications Additional Sections Division 03: Concrete: (7) Pages 5.03 Contractor's Bid for Public Works, Revised Page 7: Bid Proposal Newman Center: Masonry Repair / Addendum 01 Project No, 116-132 January 5, 2017 Page 13 xi., „„ .,° ' 8£gwe.: .a .,,aa""w° � .H.iNVId a001 s3S'NVId Nvid dooa K II Ili h0 8'NtlId NOOId ❑N093S'Ntlld tlOOld lSYli [ SA.L33TrNd Id �9 +£9 lryay Zf L-9LL'oN 133fOLd amllllg "OM £SZLVIDOSSV V digBIZQ'V HrIaSOI TUItld3M ANNOStlW H31N3� NtlWM3N N I m 3fg g °3 tl tae„99HK s � 3 god IN 1 9 it gggyy g 3-3 F Fags Cgs £ e3; 3g# �e @gfig,gg 5 gn e �€C� s M Ids @g eq'jyq. ��=g ��$ Fra 1p 9: g' ysf rii5 '£ 141 V! s 5 gga2gnCgg gg ggg gp$glrgs 6gH "li g¢gjgj,u! § d g4 ao 7 5310NA3N Mltld3tl 8 SNO" A l V 3 30NIO11119 �C I �Q �#t,, vmirnixxae xinos iFseusnwFxinosae tW � w 8°�°°eld i9 a+Naal. i,v MR� L£L-9"-N1O3fOtld a; $ 'A P9 "Om Is .LVIOOssv ly vivaiza *v HaasO[ v NItld3M ANNOSVW :}MiN3O NVWM3N a z CC$ Y pp� �F�vu Fua g� �t A �Q ge ppMe ggyg €€a� gga33} � 6 iy ���5$ ��¢ ff$ $v �g;� 3 3 ig N iq 1 55g O � e$$a$ � €eF SLR 4 $�y ^v i 3 97 3a�p° Je08 eggaqj a £g S2';3gZ 8 53v6 9$ " I. s 00e,3 xF$ S#g Ba9A5 $° ��' a $p 0€g151 "� s `sa' }Iv0 $ !23w p$�. 9 -1 $elf Pvfsa 4 9 i SB< e Y 50g` § � ' �03`$* v ¢0� vg€ 0 „s a 3 a 0:@�'°eg"3kxs� w $ £ e2eyyy0§ 0$p 1`0 e4 jig 0 z sYe; $ q! "g`` 4<P$71tev.. o v v s£¢ 9= ai 3ae6 � t06 �Ba t 99 qq� g0�a� HUH, � =mr�99 �gc i 2 I2.eav U a ai gg$$'' v vA v €eia 111110 $i5$� : v8$v3 i$$ 4�$ a9$�8�- m S Oz z 0 > aw3 5310NA3N NItld3N 9 5NOI1tlA313'JNIOlIOB = TV i�\n�: % - Y,�•�. T•• 8u[aueIX as ,� vmwxrarvaswnos iaaeis naas xinossu �I I I!17C [j� LEb9LL'-I lO3fONd 9® V VIUM Q T Hd3SOf V NIVd3N ANNOS 1 tlW N31N3O NtlWM3N e 6 ��fl$"s fj5 jgslyy'§ �g$ H. f � k Gi i€ �� we SC]€E ,ge � 1�a§11@€ ,611S1e - m I 7ll6� 2€1��G 2 z z J J W W J J a� as z 0 aw�u Newman Center: Masonry Repair SB Project No. 116-132 DIVISION 03 CONCRETE JO�E'.PH A.DZ.i1RlA & iE,, INC. Division 03 - Concrete Page 103 00 00 1 Newman Center: Masonry Repair SB Project No. 116-132 SECTION 03 0130 CONCRETE CLEANING PART 1: GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes 1. Cleaning all vertical cast in place concrete walls at building exterior perimeter 2. Removing paint from concrete at surfaces. 1.3 DEFINITIONS A. Low -Pressure Spray: 100 to 400 psi; 4 to 6 gpm. B. Medium -Pressure Spray: 400 to 800 psi; 4 to 6 gpm. C. High -Pressure Spray: 800 to 1200 psi; 4 to 6 gpm. 1.4 SEQUENCING AND SCHEDULING A. Work Sequence 1. Remove plant growth 2. Inspect for open cracks. Where repairs are required, delay further cleaning work until after repairs are completed, cured and dried, to prevent the intrusion of water and other cleaning materials into the wall. 3. Clean concrete surfaces to remove dirt, debris, and stains 4. Apply paint stripper to remove paint from surface and wash. 5. Final cleaning. 1.5 ACTION SUBMITTALS A. Product Data: For each type of product. 1. Include material descriptions and application instructions. 2. Include test data substantiating that products comply with requirements. 1.6 INFORMATIONAL SUBMITTALS A. Cleaning program. 1.7 QUALITY ASSURANCE A. Cleaning Program: Prepare a written cleaning program that describes cleaning process in detail, including materials, methods, and equipment to be used; protection of surrounding materials; and CJNCRETE CLEANING P'aae i 03 01 30 - 1 Newman Center: Masonry Repair SB Project No. 116-132 control of runoff during operations. Include provisions for supervising worker performance and preventing damage. 1. If materials and methods other than those indicated are proposed for any phase of cleaning work, add a written description of such materials and methods, including evidence of successful use on comparable projects and demonstrations to show their effectiveness for this Project. B. Mockups: Prepare mockups of cleaning on existing surfaces to demonstrate aesthetic effects and to set quality standards for materials and execution. Cleaning: Clean an area approximately 16 sq. ft. for each type of surface condition. a. Test cleaners and methods on samples of adjacent materials for possible adverse reactions. Do not test cleaners and methods known to have deleterious effect. b. Allow a waiting period of not less than three days after completion of sample cleaning to permit a study of sample panels for negative reactions. 2. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing. 1.8 FIELD CONDITIONS A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit concrete cleaning work to be performed according to product manufacturer's written instructions and specified requirements. B. Clean concrete surfaces only when air temperature is 40 degrees Fahrenheit and above, and is predicted to remain so for at least seven days after completion of cleaning. PART 2: PRODUCTS 2.1 CLEANING MATERIALS A. Water: Potable. B. Hot Water: Water heated to a temperature of 140 to 160 deg F. C. Mold, Mildew, and Algae Remover, Job Mixed: Solution prepared by mixing 2 cups of tetrasodium pyrophosphate (TSPP), 5 quarts of 5 percent sodium hypochlorite (bleach), and 15 quarts of hot water for every 5 gal. of solution required. D. General purpose mildly alkaline product for cleaning and degreasing light to heavy soiled cast concrete; containing no harsh acids, caustics, or solvents. 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following: a. Dumond Chemicals, Inc. b. Price Research, Ltd. C. PROSOCO, Inc. E. Fast acting gel -consistency paint coating remover to remove paints, clear coats, and graffiti from concrete without the use of methylene chloride or methanol. . -__. page j G3 01 30 - 2 Newman Center: Masonry Repair SB Project No. 116-132 Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following: a. American Building Restoration Products, Inc. b. Cathedral Stone Products, Inc. C. Diedrich Technologies, Inc.; a division of Sandell Construction Solutions. d. Dumond Chemicals, Inc. e. Hydroclean; Hydrochemical Techniques, Inc. f. Price Research, Ltd. g. PROSOCO, Inc. 2.2 ACCESSORY MATERIALS A. Stiff Bristle Brush: For application of cleaner and removal of debris. Brush shall be of a style to be determined by cleaning company. PART 3: EXECUTION 3.1 CONCRETE CLEANING SPECIALIST A. Concrete Cleaning Specialist Firms: Subject to compliance with requirements, provide concrete cleaning firms that are experienced with historic stone, masonry, and concrete cleaning. 3.2 PROTECTION A. Comply with each manufacturer's written instructions for protecting building and other surfaces against damage from exposure to its products. Prevent paint removers and chemical cleaning solutions from coming into contact with people, motor vehicles, landscaping, buildings, and other surfaces that could be harmed by such contact. Cover adjacent surfaces with materials that are proven to resist paint removers and chemical cleaners used unless products being used will not damage adjacent surfaces. Use protective materials that are waterproof and UV resistant. Apply masking agents according to manufacturer's written instructions. Do not apply liquid strippable masking agent to painted or porous surfaces. When no longer needed, promptly remove masking to prevent adhesive staining. 2. Do not apply solutions during winds of enough force to spread them to unprotected surfaces 3. Dispose of runoff from operations by legal means and in a manner that prevents soil erosion, undermining of paving and foundations, damage to landscaping, and water penetrations into building interiors. 3.3 CLEANING CONCRETE, GENERAL A. Cleaning Appearance Standard: Cleaned surfaces are to have a uniform appearance as viewed from 50 feet away by Architect. B. Proceed with cleaning in an orderly manner; work from top to bottom of each scaffold width and from one end of each elevation to the other. Ensure that dirty residues and rinse water do not wash over dry, cleaned surfaces. rage 4 03 01 30 - 3 Newman Center: Masonry Repair SB Project No. 116-132 C. Use only those cleaning methods indicated for each concrete material and location. 1. Brushes: Do not use wire brushes. 2. Spray Equipment: Use spray equipment that provides controlled application at volume and pressure indicated, measured at nozzle. Adjust pressure and volume to ensure that cleaning methods do not damage surfaces, including joints. Use spray equipment for wetting and rinsing operations only, and do not damage surfaces, including joints. a. Equip units with pressure gages. b. For water -spray application, use fan -shaped spray that disperses water at an angle of 25 to 50 degrees at 50 psi. C. For cleaner spray application, use low-pressure tank or pump suitable for cleaner indicated and equipped with a nozzle having a cone -shaped spray. D. Perform each cleaning method indicated in a manner that results in uniform coverage of all surfaces, including corners, moldings, and interstices, and that produces an even effect without streaking or damaging masonry, stone, or concrete surfaces. Keep wall wet below area being cleaned to prevent streaking from runoff. E. Perform additional general cleaning, paint and stain removal, and spot cleaning of small areas that are noticeably different when viewed according to the "Cleaning Appearance Standard" Paragraph, so that cleaned surfaces blend smoothly into surrounding areas. Water Application Methods: 1. Water -Soak Application: Soak concrete surfaces by applying water continuously and uniformly to limited area for time indicated. Apply water at low pressures and low volumes in multiple fine sprays using perforated hoses or multiple spray nozzles. Erect a protective enclosure constructed of polyethylene sheeting to cover area being sprayed. 2. Water -Spray Application Method: Unless otherwise indicated, hold spray nozzle at least 6 inches from concrete surface and apply water in horizontal back -and -forth sweeping motion, overlapping previous strokes to produce uniform coverage.. G. Cleaner Application Methods: Apply cleaners to concrete surfaces according to cleaner manufacturer's written instructions. Do not spray -apply at pressures exceeding 50 psi. Do not allow cleaner to remain on surface for periods longer than those indicated or recommended in writing by manufacturer. H. Rinse off residue and soil by working upward from bottom to top of each treated area at each stage or scaffold setting. Periodically during each rinse, test pH of rinse water running off of cleaned area to determine that cleaner is completely removed. After cleaning is complete, remove protection no longer required. Remove any tape and adhesive marks. 3.4 PRELIMINARY CLEANING A. Removing Plant Growth: Completely remove visible vine and shrub growth and moss from concrete surfaces. Remove plants, creepers, and vegetation by cutting at roots and allow remaining growth to dry as long as possible before removal. Remove loose soil and plant debris from open joints to whatever depth they occur. B. Preliminary Cleaning: Before beginning general cleaning, remove extraneous substances that are resistant to planned cleaning methods. Extraneous substances include paint, calking, asphalt, and tar. COIN CRETE CL EAN W G Page i 03 01 30 - 4 Newman Center: Masonry Repair SB Project No, 116-132 Carefully remove heavy accumulations of rigid materials from concrete surface with sharp chisel. Do not scratch or chip concrete surface. 2. Remove asphalt and tar with solvent -type paste paint remover per manufacturer's instructions. 3.5 CLEANING CONCRETE A. Cold Water Soak: 1. Apply cold water by intermittent spraying to keep surface moist. 2. Use perforated hoses or other means that apply a fine water mist to entire surface being cleaned. 3. Apply water in cycles of five minutes on and twenty minutes off. 4. Continue spraying until surface encrustation has softened enough to permit its removal by water wash, as indicated by cleaning tests for 72 hours. 5. Remove soil and softened surface encrustation from surface with cold water. B. Concrete Surface Cleaner: 1. Wet surface with cold or hot water applied by low-pressure spray. 2. Apply diluted cleaning solution to the concrete surface using a brush or low pressure spray. 3. Let the cleaner stay on the surface for 1-10 minutes based on testing. Gently scrub heavily soiled areas. 4. Working from bottom to top, rinse the surface thoroughly with clean water. The best combination of rinsing pressure and water volume is provided by washing equipment generating 400-1000 psi with water flow rate of 6-8 gallons per minute delivered through a 15- 45 degree fan spray tip. 5. Repeat steps as necessary. 6. Do not let cleaning solution dry on the surface. If drying occurs, lightly wet surfaces with fresh water and reapply the cleaner in a gentle scrubbing manner. C. Mold, Mildew, and Algae Removal: Wet surface with cold or hot water applied by low-pressure spray. 2. Apply mold, mildew, and algae remover by brush. 3. Scrub surface with medium -soft brushes until mold, mildew, and algae are thoroughly dislodged and can be removed by rinsing. Use small brushes for mortarjoints and crevices. Dip brush in mold, mildew, and algae remover often to ensure that adequate fresh cleaner is used and that surface remains wet. 4. Rinse with cold or hot water to remove mold, mildew, and algae remover and soil. 5. Repeat cleaning procedure where required to produce the cleaning effect established by mockup. D. Fast Acting Paint Stripper Working from the bottom to the top, apply 1/8" to thick to dry surface. U E',NJNG __ Faae W3 UI Newman Center: Masonry Repair SB Project No. 116-132 2. Let the application dwell 15 to 60 minutes or until coating lifts or shows signs of dissolving. Periodic agitation with a stiff bristle brush improves penetration. Some coatings will need multiple applications or increased dwell time. 3. Working from the bottom to the top, remove stripper and residue with pressure water rinse. The best combination of rinsing pressure and water volume is provided by washing equipment generating 400 to 1000 psi with a water flow rate of 6 to 8 gallons per minute delivered through a 15 to 45 degree fan spray tip. 3.6 FINAL CLEANING A. Clean adjacent surfaces of any spillage and debris. Use detergent and soft brushes or cloth. B. Remove debris from gutters, collection boxes, and downspouts. Rinse off roof and flush gutters and downspouts with water. C. Remove masking materials, leaving no residue. END SECTION cLEnNiNa Project Name Project No. For Bids Due RARF Rln L BID/PROPOSAL CITY OF SOUTH BEND 1865 Newman Center: Masonry Repair 116-132 9:30 am, January 10, 2017 Item No. Descri tion p Quantity Unit Unit Price Total Amount Clean, restore (repair, replace, 1 tuckpoint, etc.), and Seal with Lump penetrating water repellent the existing Sum 1 Masonry Fagade. Tent and heat portion of masonry rebuild 2 areas as required for intermediate date 14 Days completion. BASE BID TOTAL ALTFRNATFR Item No Description p Quantity Uni7Unit Total Amount Clean and remove paint from concrete Lump Walls around perimeter Sum Infill existing window and door openings 2 and cut new openings for future LumSump windows Bidder (Firm): Address: City/State/Zip: By Telephone Number: (Signature) (Printed Name of Person Signing) Version 10/17/2016 Contractor's Bid for Public Works - 7 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3.. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION ll PLAN AND EQUIPMENT QUESTIONNAIRE 1, Attach an explanation of your plan or layout for performing proposed work. (Examples could include a -narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 1 if you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval, Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project 4. Attach a listing of equipment you have available to use for the proposed project 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT 1. Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 10/17/2016 Contractor's Bid for Public Works - 3 PART II Section I Experience Questionnaire Question 1. Previous jobs from the past year Job Name Contact Information Private Hospital (219) 392-7576 Private University (574 307-7310 Private University (574 631-4200 Elkhart School (574 533-7176 Community Hospital (219) 852-3063 St. Joe Valley Building Trades (574) 287-9655 Hall Residence (574) 233-4955 Gafill Residence (574) 233-2928 Lewis Residence (317) 800-1497 Distillery (219) 241-1086 Levine Residence (269) 470-6898 Question 2. N/A Question 3. N/A Question 4. Reference List: Reference List: Tom Boomershine — 574-533-7176 Russ Cain — 219-392-7567 Jim Hiss- 574-993-3335 Section II Plan and Equipment Questionnaire Question 1. Plan for proposed project. Our main goal is to provide excellent service while working as efficiently as possible. We have spent time looking over the blueprints and reference material to not only complete the job on time and on budget, but we have formulated a "visitor friendly" plan to help maintain your regular business activities during the construction process. This will be done by working closely with Brad Emberton or other staff members to ensure that work zones are clear of problems and issues, as well as ensuring that entrances and areas are accessible to staff. Question 2. N/A Question 3. N/A Question 4. List of equipment that will be available for use during the proposed project. • Air Compressor • Brick Cart • Brick Saw • Caulk Cutter • Circular Saw • Concert Mixer • Converted Saw • Dumpster (rented) • Gang Box • Generator • Grinders • Hammer Drill • Ladders • Lifts (rented) • Mortar Stands • Pallet Jack • Pressure Washer • Roof Gator • Scaffold • Shop Vac • Trailer • Wheelbarrow Question 5. I have received material quotes for this project Section III Contractors Financial Statement *Attached C & S Masonry is in FULL compliance with E-Verify Program. When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTORIS NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING, INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NOW DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATEOF Sl"A ✓-T ) ) SS: S'i• �o� COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person orpersons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any _successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality. of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-6, as amended from time -to -time; a Contractor is engaged in investment activities in Iran if either: 1. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or 11. Contractor, its successor or its affiliate, is a financial institution that extends twenty. million dollars ($20,000,000) or more in credit to another person for forty five (45) days or more, if that person will (I) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that helshelitshall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by LC: 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included Version 1011712016 Contractor's Bid for Public Works - 4 and attached as part of this bidlquote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with anunauthorizedalien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E- Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms; conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials; or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractors good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE') or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, _ responsive bidder. in no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBEIWBE; however, it may not unlawfully discriminate against said WBENSE. A finding of a discriminatory practice by the City's MBEtWBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor -agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South. Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. Version 10117/2016 Contractor's Bid for Public Works - 5 I, the undersigned bidder or agent as contractor on a public works project understand my statutory. obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that l and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project If awarded. I understand i have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated thisi 8ay of , 20 r�� �,'f��%f+f�az�iC� 12EiTv.c.tY7i�..> LLC ConOtractor/Bidder (Firm) A.. Q �{ Q C Signature of Contractor/Bidder or Its Agent Printed Name and Title Subscribed and sworn to before me this _ day of , ki YOUat r, , 201 My Commission Expires Notary Public ) County of ResidenceT MARSHA L. BROWN NOTARY PUBLIC - SEAL - _ STATE OF INDIANA COUNTY OF ST JOSEPH- - P.^v COMMA G1onEXPI's June 28. 2021 - Version 10/17/2016 Contractor's Bid for Public Works - 6 fe;y roc ` wOfyi�i8�. a 1; - - ` woco - -y o _. w $ 0 - - m� -.LU o ro `o o m $, a w.4 ?-. c - _a. F K s w > -1 a t E ro a� o C w-� zt0 n'i �_ d N 1 m w o r V o K N�a ul w cm m o o ozzW—W $a 3 LU m E 0 O o o m }}mLL h-. w W U. GI T c UNNi 2 oELL z t° 3 ° o Q LL y N O.. w W z IL _z -9 a � m '3 m •o > N O T 0 c J N N E o-- 0 y y. m _o vv E - o Z CDw ate. w v N to s n a`m (L d � � a c o a) a (T co 0 c 0 0 < LU o 0 E m O�U m 0 a m o C O � T a� a� o 2 (D o � III 0 o U) N' o U .oc N N m o a CL CL w m 0 N E (0 z - WIZ co 1 c O CITY OF SOUTH BEND o "o Yff11?% MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM} FORM MW8E-2:0. EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Send Public Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned businesses defined by the Indiana Department of Administration (`IDOA7). Project Number: 116-132 Date: 1 Project Name: Newman Center: Masonry Repair Bidder. vti' PLC. Contact Person: J-re-,y : tr-Q 1r).S Telephone: S 7q - Z©£%-'9;tl�rf Address: 372�- /Q. , - Mtn r y GT. S u i fc 46. City: 15D 4ii &P--D State: 7Z wek .a Zip: g6162A Email: To determine whether a bidder has demonstrated good faith efforts to reach the MSE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table belnw*r - - EVIDENCE OF GOOD FAITH EFFORTS MBEWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business 0 _ Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women +ACT- Owned Business as found on their website (http:t/www.in_gav/idoa). _ ACTION-(ADVERTISEICONTACT): In order for your bid to be deemed responsive, the City of South Send requires that all perspective bidders complete no less than 2 of the following: Attend all pre -bid meetings scheduled by the City to inform MBENVBEs of contracting and subcontracting opportunities. Advertise in general circulation andfor trade association publications concerning subcontracting - opportunities, and allowMBEIWBEs reasonable time to respond. - PPerform any and all necessary steps to provide written notice in a manner reasonably calculated. to - inform MBEWBEs of subcontracting opportunities and allowed sufficient time for them to participate - - effectively. - - - Utifize pre-existing services of available community- organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBEIWBE firms. "Bidder must.circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBEWBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE1WBEs as unqualified without sound - business reasons based on a thorough investigation of their capabilities. - - SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBENBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WSE that has bid on the subcontracting opportunity: - - 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBEWBE was unqualified to perform the job. 'Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 1011712016 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND cFa°vT"'a MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM r ` FORM MWBE-2.1 ,yes MBE/WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBENVBE to obtain Good Faith Efforts. it is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE_ —OF - Project Number: 116-132 MBENVBE Participation Goat %, Project Name: Newman Center: Masonry Repair Bidder: S tt l�s V m '� p T� 3•.s L C C By: isx, 7 (Signature) (Title) (Date) MBENVBE Firm AA-ve: L:, Gt e✓ I Owner or Contact at MBEIWBE Firm V 4 C A e:A-- Telephone: cIJ j5 -Z 1 Fax: A)A Email: CAfL 1%Z-rt—,,e t- y t c eat% A-kP TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBEIWBE FIRM: fq 1. MBENVBEFirm 5��.r41 /ZrJ CL?rrn i�Fis. Owner or Contact at MBENVBE Firm Telephone: _ S4'`rh` Fax: lt-la,mail: 6!6-9 cIZ Gcvyac.avl TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MSENVSE FIRM: Version 10/17/2016 Contractor's Bid for Public Works - 10