Loading...
HomeMy WebLinkAboutOpening of Bids - Newman Center Roof Repair - Slatile Roofing and Sheet Metal CoProject Name Project No. For Bids Due CITY OF SOUTH BEND, INDIANA Contractor's Bid for Public Work CHECKLIST FOR BIDDERS Newman Center: Roof Repair 116-131 10:30 am, December 22, 2016 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted Form [MWBE-2.1]. Z Acknowledge Receipt of 1 Addendum(s) included with the bid. N/ All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: -Slatile Roofing and Sheet MetaICO., IDC. Date: 12/22/2016 By Authorized Signature: Print Name & - Version 10/17/2016 Contractor's Bid for Public Works - 1 Project Name Project No. For Bids Due City of South Bend, Indiana Contractor's Bid for Public Work Newman Center: Roof Repair 116-131 10:30 am, December 22, 2016 PART (Must be completed for all bids. Please type or print) Date: 12/22/2016 Bidder (Firm): Slatile Roofing and Sheet Metal Co -Inc. Address: 1703 S. Ironwood Dr. City/State/Zip: South Bend, IN 46613 Telephone Number: ( 574 ) 233-7485 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: and dated 11 /22/2016 for the sum of (enter the Total Bid as shown on the Proposal) sand -bu"'Ity five do]] rs ($ $16%845 ) (Enter sum of Total Base Bid plus Alternates shown onProposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shill be shown on a separate attachment. The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member James A. Mueller, Member Gerald Longerot, President (Printed Name of Person Signing) ACCEPTANCE day of 20 Suzanna M. Fritzberg, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk Version 10/17/2016 Contractor's Bid for Public Works - 2 PART II (For projects of $100,000 or more —I C 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT 1. Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 10/17/2016 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NOW DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF IN ) ) SS: St. josel2hCOUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty- five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included Version 10/17/2016 Contractor's Bid for Public Works and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E- Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. Version 10/17/2016 Contractor's Bid for Public Works - 5 I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1), 1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 22nd day of Dec , 2o16 ile RoofinR and Sheet Metal Co., Inc. ntr for/Bidder Fi ) ture of Con r/B' der or Its Agent Gerald Longerot, President Printed Name and Title Subscribed and sworn to before me this 22n da f D2C2mb='Z—�4 My Commission Expires 03/09/2024 N ary Public }- County of Residence Jeremy A. /IevUs \\\p j04/gry''i. State of Indiana Notary Public `, N .. �vk 'c County of Residence • St Joseph dJ, Expires 3191202b a' a ; Was i Version 10/17/2016 Contractor's Bid for Public Works - 6 Phone 5741233 7485 -� Fax 574/233 7531 into@sl atileroofing.com �--- - - - 1 www.slatileroofing.com ROOFING AND SHEET METAL CO, INC. 1703 South Ironwood • South Bend, IN 46613 December 22, 2016 1. Start date in compliance with contract and scope of work. Workers: 6/12 We will perform the proposed work as outlined in the scope of work. 2. N/A 3. N/A 4. We have all equipment needed to perform this scope of work. Equipment: 3 mobile truck cranes 14 'h ton to 1 ton trucks 2 large scissor bed trucks various roofing equipment Total sheet metal fabrication shop 1 large dump truck 6 coil metal roofing manufacturing machine $1.8 million replacement value of combined totals w/ fleet. 5. Yes Project Name Project No. For Bids Due e®e � BIDIPROPOSAL CITY OF SOUTH BEND Newman Center: Roof Repair 116-131 10:30 am, December 22, 2016 Item No. Description Quantity Unit Unit Price Total Amount 1 Demolition and removal from site all Lump 1 $ 12,920 portions of existing roof Sum 2 Membrane roof system including Lump 1 $ 108,075 patching, insulation, & terminations Sum 3 Miscellaneous sheet metal work, including coping, scuppers, Sum 1 $ 48,850 gutters, downspouts, etc. BASE BID TOTAL Bidder (Firm): Slatile Roofing and Sheet Metal Co., Inc.. 169 845 Address: 1703 S. Ironwood Dr. City/State/Zip: South Bend, IN 46613 Telephone Numbe : (574) 233-7485 By (SOgnature) Gerald Longerot, President (Printed Name of Plerson Signing) Version 10/17/2016 Contractor's Bid for Public Works - 7 W, ou 0 W m w w 9 Z N~ w 00 7y �x CA w o w a z� M z CD oa rn C:, � m O O Q\ W m V n ON a s Z �o O W N W w 0 O `z cn 6. � m cn w po�ii �P x• V 00 ( N A 0 o (D 0 ry� N n �e N D0 O 3m o N C 0 ro o CD n 7y 0 (D (D (D A' �a All o o O o (D a a a 0 W 0 �o W_ 3 and z z z°, 9 a�m> 0 c 0 W 0 ! 0 O O O N o � N ow W w W -0 c0 -u c- 3 W o: m a o �' lo Z 0N �-- (n c 6-0 6 (D0 ti Q O � N O N 0 N W N 0 N 0 a Q O N. (D O W 0', IQ 0 m CD CD o a a f O ,0y N �1 (D n ww i7 N (D 3 �. w no Z n O (D d * 0 w 3 _, o a (n D 0 0 °c W c (D 0 co W o =o 0 o- (N o '//10 0 O y\ N < O 3 N 00 (D m hi= N A. U, '= (D � N c � Wa =h c, Q 0(° � Na 0 � o0 W 0 co g3 m W n 0 d M. co O m �a V W O 3 O W ^ 0' o o (D W O. — CITY OF SOUTH BEND � o�SouTxse MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY k�°r DEVELOPMENT PROGRAMw(� FORM MWBE-2.0 �xrys,�sra EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA" ). Project Number: Project Name: Bidder: 116-131 Date: 12/22/2016 Contact Person: Wendell Simmons Telephone: 574-233-7485 Address: 1703 S. Ironwood Dr. City: South Bend State: IN zip: 46613 Email: To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa), ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: Attend all pre -bid meetings scheduled by the City to inform MBEANBEs of contracting and subcontracting opportunities. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. **Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBEIWBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBEfWBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBEANBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBEM/BE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 10/17/2016 Contractor's Bid for Public Works 4 ov CITY OF SOUTH BEND �a4z -ij MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM }� f 54, f FORM MWBE-2.1 '�",`�s-csz,,..;;�" MBEIWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE 1 OF 2 Number: 116-131 Newman Center: Roof Repair MBEIWBE Participation Goal 7.1% By: — President —.a (Signature) (Title) (Date) MBE/WBE Firm Apollos Water, LLC Owner or Contact at MBE/WBE Firm Kristi Snyder/Brooks Snyder Telephone: 765-463-6774 Fax: Email: apolloswaterII@yahoo.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Waste removal/recycling RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Brooks Snyder stated "We are only going to be cost effective around Lafayette, Kokomo, and Frankfort areas for trash recycling. South Bend is too far." MBE/WBE Firm Bulk Transport Cor Owner or Contact at MBE/WBE Firm Scott Olinek Telephone: 219-229-0442 Fax: Email: solinek@bulktransportcorp.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Equipment Rental RESULTS OF CONTACT WITH THE MBEIWBE FIRM: Scott Olinek stated "Unfortunately we will not be able to provide a quote for this." Version 10/17/2016 Contractor's Bid for Public Works 1 10 CITY OF SOUTH BEND aogs v_` aR MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITYF i DEVELOPMENT PROGRAM �y°) FORM MWBE-2.1 MBE/WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE 2 OF 2 Project Number: 116-131 MBE/WBE Participation Goal 7.1% Project me: Newman Center: Roof Repair Bidder: ti' Ro fin and S eet Metal Co. Inc. By President — / (Signature) (Title) (Date) MBE/WBE Firm Midwest Rentals, Inc Owner or Contact at MBE/WBE Firm Jennifer Marbach Telephone: 765-423-5541 Fax: Email: jmarbach@midwestrentalsinc.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Portable Restroom Rental RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Jennifer Marbach stated "South Bend is out of our service area.,, MBE/WBE Firm Owner or Contact at MBE/WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Version 10/17/2016 Contractor's Bid for Public Works - 10 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAX 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: December 15, 2016 To: All Bidders From Linda M. Martin, Clerl Subject Addendum Number: Project Name: Newman Center Project Number: 116-131 11 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Si Date: Z Document A31OTM - 2010 Conforms with The American Institute of Architects AIA Document 310 Bid Bond CONTRACTOR: SURETY: R14ane,legnLcrnitrsnndaddi•ersy (Mine,legal.ofttfusairdprincf/utlplucerfbnrinexs) Slatile Roofing & Sheet Metal, Inc. Merchants Bonding Company (Mutual) 1703 S. Ironwood Drive P.O. Box 14498 South Bend, IN 46613 Des Moines, IA 50306 - 3498 This document has on ant ation legal consequences.. Consultation Mailing Address for Notices with an attorney is encouraged with respect to Its completion or OWNER: modification. (,Name, legal status and adds ass) Any singular reference to City Of South Bend Board of Public Works contractor, surety, owner or 227 W Jefferson Blvd Room 1316 other party shall be considered plural where applicable. South Bend, IN 46601 BOND AMOUNT: $ 5% Five Percent of Amount Bid PROJECT: (Main, location or address, andllmjecrnaruber, Ifan)) Newman Recreational Center, 727 S Eddy St, South Bend, IN 46615 The Contractor and Surety arc bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves• their hairs, executors, administrators, successors and assigns, jointlyand severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with ilia Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in file bidding orContract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in file prosecution thereof: or (2) pays to fire Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another Ponfy In Perlbno the work covered by said bid, their this obligulion shall be null and void, otherwise to remain in lull linen and ollect. The Surely hereby waives any notice ol'mr agreement between lire Owner and Contractor to extend the time in which the Owner may accept the bid. Waiverol'nolice by the Surely shall not apply to any extension exceeding sixty (60) days in lire aggregate beyond the time Air acceptance oi'bids specified in the bid documents, and lire Owner and Contractor shall obtain the Suret)as consent Air an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the tcmr Contractor in this Bond shall be doomed to be Subcontractor and the tern Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a stutulory• or other legal requirement in the location ol'the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted heref lour and provisions eonlbrining to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that (his Blind shall be construed as a statutory bond and not as a common law bond. Signed and scaled this 22nd day of December,2016. t Ie Roofing & Sheet Metal, Inc. Ifl'!t ss) Rvr_ ff 1't'�S(lif.il• Merchants B nding Cam any (Mutual) (I In On) ( (C&) race HouseAttorney-in-Fact 8-00541AS 8r10 MERCHANTS BONDING COMPANY.. POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint, Individually, Tracie House their true and lawful Attorney -in -Fact, with full power and authority hereby conferred to sign, execute and acknowledge, at any place within the United States, the following surety bond: Surety Bond #: Bid Bond Principal: Slatile Roofing & Sheet Metal, Inc. Obligee: City Of South Bend Board of Public W orks This Power-of-Attomey is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 24, 2011. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attomeys-In-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given to the Attomey4n-Fact Includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations In favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this Instrument to be signed and sealed this 1st day of August, 2015. -o- 2003 ' ;y�, 1933 .� MERCHANTS BONDING COMPANY (MUTUAL) MERCHANTS NATIONAL BONDING, INC. By /-or--7p;;5� STATE OF IOWA "''. �r� * 00% .'•..*.. COUNTY OF DALLAS as. r.....0 rr President On this 1st day of August , 2015, before me appeared Larry Taylor, tome personally known, who being by me sworn did say that he Is President of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors, '`Pet O, Commi40 ssion Number My Commission Expires 0 z , QQ- 1011il' < June 20 2017 Notary Pub o County; Iowa (Expiration of notary's commission does not Invalidate this instrument) I, William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this22nd day of December 2016 ....... •'_.NG f n P ":no•. z 1933 Secretary : c. POA 0007 (6/15)