Loading...
HomeMy WebLinkAboutOpening of Bids - Newman Center Roof Repair - Northern Indiana Roofing & Sheet Metal - AwardeeIIJIHNH c Work ERS rks'finds it necessary to reject a bid because it does your bid, please use the following checklist in order sr. s the option of providing either a Certified Check mtractor's Bid for Public Work Form, completely lent Affidavit, Certification Regarding Investments ration, Non Discrimination Commitment, and rducts or Foundry Products. [MWBE 1.0].If minimum participation goal is not orts Form [MWBE-2.0] and MBE/WBE Contacted I included with the bid. with the bid. i 11 signed by the proper ;party with name either uring compliance with required documentation; irements and does not relieve the bidder of the L'. tl[T Attn'y Date: 1;X— /7�l rector's Bid for Public Works - 1 Bend, Indiana i for Public Work iir 16 RTI I bids. Please type or print) nl• Alrl!-Y7rrn Lois„ ZaAi i-J..rlk-EF., (3?61 ))3Y- 1,15- )r and/or material necessary to i r PA7R— I specifications prepared by: he Total Bid as shown on the Proposal) (s ft ;-go, ='� ) isal) (Numerical) I check with this bid for an amount specified ndersigned submits a proposal for each in be specifically referenced at the applicable :ded, the cost of units must be the same as South Bend. Ifthe .bid is to be awarded on a )arate ° achment. C77� V14 "Ic (Printed Name of Person Signing) ACCEPTANCE day of l 20 / is Suzanna M. FF,r_itzber , Member e se,J. D- u, ember 'Aftest: Linda M. Martin, Clerk is Bid for Public Works - 2 PART II (For projects of $100,000 or more — IC 36 1-12-4) be submitted under oath by each bidder with and as part of his bid. es for each section as needed. iNCE QUESTIONNAIRE cation regarding projects your organization has completed for the period of one (1) he date of the current bid. ig of public works projects currently in process of construction by your organization. ration regarding any failure to complete any work awarded to you and the location races from private firms for which you have performed work. MD EQUIPMENT QUESTIONNAIRE ;planation of your plan or layout for performing proposed work. (Examples could rative of when you could begin work, complete the project, number of workers, etc. ar information which you believe would enable the City of South Bend to consider ig'of the names and addresses of all subcontractors (i,e. persons or firms outside i who have performed part of the work) that you have used on public works projects cast five (5) years along with a brief description of the work done by each i to sublet any portion of the work, attach the name and address of each equipment to be used; by the subcontractor, and whether you will require a bond. rou are unable to currently provide a listing, please understand a listing must be r to contract approval. Until the completion of the proposed project, you are under a blgation to immediately notify the City of 'South Bend in the event that you determine that you will use a subcontractor on the proposed project. g of equipment you have available to use for the proposed project. [eyed into contracts or received offers for all materials which substantiate the prices Ong your proposal? If not, attach an explanation for the rationale used which would ie prices listed. ACTOR'S FINANCIAL STATEMENT bidder's financial statement is mandatory. Any bid submitted without said financial required by; statute shall thereby be rendered invalid. The financial statement rider to the City of South Bend awarding the contract must be specific enough in aid City of South Bend can make'a proper determination of the bidder's capability the project if awarded. Contractor's Bid for Public Works - 3 Governmental Unit: City of South Bend Board of Public Works Bidder (Firm) Northern Indiana Roofing and Sheet Metal Corp. Date (month, day, year): 1212212016 These statements to be submitted under oath by each bidder with and as a part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? Contract Amount Class of Work Completion Date Name and Address of Owner 147,470.00 Roofing 5/2016 Chyot South Bond. 13160aanty Gty Buli goods Bend, IN 466B1 117,210.00 Roofing 10/2016 Soolh Bend Sabana.215 S. M. Joseph St, South Bend. IN 46601 543,624.00 Roofing 1012016 Peru Community School Cory., 35W. 31d St, Pa., IN 46WO 2. What public works projects are now in process of construction by your organization? Contract Amount Class of Work Expected Completion Date Name and Address of Owner 118,500.00 Roofing 5/2017 State of Indian.,402 W. Washington St., Indianapolis, IN 46204 3. Have you ever failed to complete any work awarded to you? NO. If so, where and why? 4. List references from private firms for which you have performed work. Gibson -Lewis Majority Builders Panzica Group NylonCraft Tire Rack SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project number of workers, etc. and any other information which you believe would enable the governmental unit to consider your bid.) We will begin work as instructed by the contract document or earlier (if allowed). We will utilize one crew of 8-10 men to tear off the existing roof system and install the new roof system. We plan to complete the work within the time frame allowed by the contract documents. 2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. DRC Corporation, 2214 Huron St., South Bend, IN 46619 - Removed and reset RTU's at Central Services Re roof project. 3. If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the governmental unit in the event that you subsequently determine that you will use a subcontractor on the proposed project. None anticipated. 4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors may also be required to be listed by the governmental unit. We own or have complete access to all necessary roofing and sheet metal equipment to perform standard roofing practices. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, please explain the rationale used which would corroborate the prices listed. Yes. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the governing body awarding the contract must be specific enough in detail so that said governing body can make a proper determination of the bidder's capability for completing the project if awarded. )rtify to any of the statements below, it shall attach an NON -DEBARMENT AFFIDAVIT, _ CERTIFICATION MPLOYMENT ELIGIBILITY VERIFICATION, NOW 'IFICATION OF USE OF UNITED ,STATES STEEL e type or print) on his/her/its oath, affirms under the penalties of perjury ether member, representative, or agent of the firm, company, ented by him, entered into any, combination, collusion or r to the price to be bid by anyone at such :letting nor to prevent luce anyone to refrain from bidding, and that this bid is made and without any agreement, understanding or combination with ich'bidding. Contractor further says that no person or persons, or will receive directly; or indirectly, any rebate, fee, gift, count of such sale; and of this proposal that neither contractor nor any of its principals d, (proposed for debarment, declared ineligible, or voluntarily ,ansaction by any Federal department or agency; and r successor to, nor an affiliate of, Contractor, engaged in ration, "Iran" means the government of Iran and any agency or is otherwise defined at .Ind. Code § 5-22-16.5-5, as amended § 5-22-16.5 8, as amended from time -to -time, a Contractor is vities in Iran if either: :cessor or its affiliate; rprovides goods or services of twenty ,000,000) or more in value in the energy sector of Iran; or ;cessor or its affiliate, is a financial institution that extends rs($20,000,000) or more in credit to another person for forty- iore, if that person will'(i) use the credit to provides goods and :rgy sector in Iran; and ,(ii) at the time the financial institution i person identified on list published by the Indiana Department nploy or contract with an unauthorized alien, nor retain any n that the Contractor subsequently learns is an unauthorized ie/it shall enroll in and verify the work eligibility status of all of s through the E-Verify Program as defined by I.C. 22-5-1.7-3. ollment and participation in the E-Verify Program is included yid for Public Works 4 bid/quote; and >/her/its subcontractors performing work :under this public contract to ors do not knowingly employ or contract with an unauthorized alien, contract with a person that the subcontractor subsequently learns is that the subcontractor has enrolled in and is participating in the E- actor agrees to maintain this certification throughout the term of the A Bend, and understands that the City may terminate the contract for s to cure a breach of this provision no later than thirty (30) days after aorations, associations, or joint venturers awarded a contract by the i its agencies, boards, or commissions shall not discriminate against for employment in the performance of a City contract with respect to ons, or privileges of employment, or any matter directly or indirectly )use of race, sex, religion, color, national origin, ancestry, age, gender /, sexual orientation or disability that does not affect that person's e purchase of work, labor, services, supplies, equipment, materials, or egoing including, but not limited to, public works contracts awarded r other contracts in which public bids are not required by law, the City, mmissions may consider the Contractor's good faith efforts to obtain actors certified by the State of Indiana as a Minority Business ("MBE") Enterprise ("WBE") as a factor in determining the lowest, responsible, r entities seeking the award of a City contract be required to award a E; however, it may not unlawfully discriminate against said WBE/MBE. y practice by the City's MBE/WBE Utilization Board shall prohibit that awarded a City contract for a period of one (t) year from the date of ch determination may also be grounds for terminating the contact for ictice or noncompliance pertains. er agrees that the following nondiscrimination commitment shall be tot which it may henceforth enter into with the City of South Bend, s, boards or commissions. discriminate against or intimidate any employee or applicant for Lance of this contract with privileges of employment, or any matter :d to employment, ,because of race, religion, color, sex, gender , sexual orientation,; handicap, national origin or ancestry. Breach of fed as material breach of contract, ictor's'Bid for Public Works -- 5 agent as contractor on a public works project, understand my statutory I products or foundry products made in the United States (I.C. 5-16-8-1). I subcontractors employed by me for this project will use steel products or United States on this project if awarded. I understand I have an affirmative )id that my proposal does not include the use of steel products or foundry States. I understand it is my sole obligation and responsibility to provide a >ct to review and approval, why the cost of United States made steel or able. Prior to award and upon submission of bid which does not use steel made in the United States, the City; through its director of public works, if the price of United States made steel or foundry is unreasonable. I eunder may result in forfeiture of contractual payments. cities of perjury that the facts and information contained in the foregoing bid :orrect. t1 A,20 � V� Nat�itFirrr.)�Diw,�Pr /ZupFk-+G �fffr2Tlye1�¢f;�aP-Q. Contr idle Firm) 7SESERNA. V Mp, N7 Signatu er of Contractor/Bidder or Its Agent Vo,88" 55`f #z� M- W+AgC 6r7 F `Mir4&t7� DnF�Mes02(14/2023 / Printed Name and Title t i to before me this°�ty f b C 20 1 Y' JH No ary Pu is r Contractor's Bid for Public Works 6 ZOPOSAL ,OUTH'BEND pair 2016 item No. Description Quantity Unit Unit Price Total Amount 1 Demolition and removal from site all Lump 1 s° `LYi 650.zN, le - 6ba portions of existing roof Sum 2 Membrane roof system including Lump 1 S/J, b6o, S v 866, patching, insulation, & terminations Sum 3 Miscellaneous sheet metal work, including coping, scuppers, Lump m 1�� 7'%0 '% ,v `� /�7 '✓ gutters, 7 �p , downspouts, etc. *". MM Co,-P . Telephone Number. a ure) shb' M. W'j AHE (Printed Name of Person Signing) ;or's Bid for Public Works 7 _a O.N Cc aE 3 'E da��a�iyr.. CL w Lo im 0 m5 m 0 ;ro 4546 w m cl �o V O L � N � W V N w @ w o w O Y :E Z m � c o inwWZa � mw0 �U ac o a ;m 1-tea m� m o 2 Ozz 3n. � 3 m E snww Grw o oL U ¢ oZO Ouj 0 o m w w " m w 3 w 52> M U E �A LL ell �° V 0 U. C y Q z O } CL z a u t- m z v �c a m3 L w 3 > a 0710 A Q > 'T N� "' -O o m O o O y N, c N E� O N _N ;N N O �a E Q;p 7 E 06 N N z .. O C N O N '.D a O) (6 l6 mFes- � a c o a d`om 0 0 ¢mo c 0 E o�U ro O a a ro m c 0 a a m E� 9 L O O h z� � o. w o O ro o c U L ro T C m ENS a`az h � W co f O ti n N 29 N b Q `fit N E � ro z 2 i 0 a� la O O N T � a O C E a g E2 U) > SOUTH BEND �tovrii q�. ISINESS ENTERPRISE DIVERSITY GENT PROGRAM I MWBE-2.0 iOOD FAITH EFFORTS of the Bids documents related to City of South Bend s to obtain MBE/WBE participation. It is the bidder's sole rity or woman business meets the qualifications of a )y the Indiana Department of Administration (" IDOAN ). Date: / z/2I- AZ sir STtviIF U­i"c Telephone: /?l I IQ .:- , A- 477. Sau7Jf EYA State: 1� Zip; Vbt,;z-r .SUrrAkERNyt70C,6 h.3 ,C0M Is to reach the MBE/WBE utilization iifications, the City and its agencies, Faith +Efforts as listed in the table EVIDENCE OF GOOD FAITH EFFORTS MBENVBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority. and Women Owned Business as found on their website (http:/Iwww.in.gov/idoa).- ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than of the following: : Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. Advertise in general circulation and/or trade association publications ;concerning .subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. Perform any and all necessary steps to provide written noticein a manner reasonably calculated to inform MBENVBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBENJBE firms. "Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH The :bidder negotiated in good faith with. interested MBE/WBEs, NEGOTIATIONS: including providing such MBENVBE's with adequate information about the plans, specifications and other requirements of the': subcontractand did not reject MBENVBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBENVSEs in order to increase the likelihood of meeting the MBENVBE goals (including breaking down contracts into smaller units to facilitate MBENVBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBENVBE that has Aid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if :not, why not, including any reasons for concluding that the MBENVBE was unqualified to perform the job. In Effort requires your initials next to all of the above boxes. Any ds for rejection of the bid by the Board of Public Works. The City of est additional information, tor's Bid for Public Works - 9 SOUTH BEND oej uT"»eH, 31NESS ENTERPRISE DIVERSITY ENTPROGRAM w MWBE-2.1 :CONTACTED '- ids that pertain to City of South :Bend Public Works 3ood Faith Efforts. It is the bidder's sole responsibility to ess meets the qualifications of a Minority or Women's MBENWBE Participation Goal v�Srk'�T`M CnlzP. _ "itle) (Date) g,,'Y , e-, Email: .Tr+if EMI{ jtvnFrn/6 SuPPt Yid of /tbz r"&- MM7Y PA,, Y, eom RESULTS OF CONTACT WITH THE MBENVBE FIRM: 6/4, 'Do CS Nn � SN PPw fT i3' Ms¢ 2�1{y MBE/ WBE Firm p p=e, Owner or Contact at MBENVBE Do Ct 6r Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: fHaT 111cm ` p eF G90 RESULTS OF CONTACT WITH THE MBEA1VBE FIRM- jb c, �FCt�^� jo Version 10/17/2016 Contractor's Bid for Public Works - 10 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIAN.A46601-1830 Date: To: From Subject PHONE 574/235-9251 FAX 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND PETL BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS December 15, 2016 All Bidders Linda M. Martin. Clerk. Board of Public Works Addendum Number: 1 Project Name: Newman Center Roof Project Number: 116-131 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Alt) Authorized Signature: Date: /2—/zI /Zo16 4Al r`77fiL n" City of South Bend — Newman Center Roof Repair PROJECT NO.116-131 ADDENDUM NO. 1 Owner: City of South Bend Engineer: Joseph A. Dzierla & Associates, Inc. Date: December 15, 2016 To: All Plan Holders From: Rich Estes, EIT You must acknowledge receipt of this addendum by signing the first page and returning a copy with your bid. This Addendum modifies the Contract Documents as follows: PART 1 — CLARIFICATIONS PART 1— CLARIFICATIONS 1.1 Attached is the sign in sheet and meeting agenda from the Pre -bid meeting held on December 13, 2016. 1.2 In response to a Pre -Bid Meeting question regarding existing roof warranties: The most recent roofing work was completed in 2003. This work included a 10 year full system warranty that has since expired. 1.3 In response to a Pre -Bid Meeting question regarding the locations that require masonry work prior to the roof repair being completed: We intend to provide an intermediate completion date for the masonry work that will require that part of the buildings masonry to be completed by a certain date to provide enough time for the roof repair to be completed in that area. Newman Center Roof Repair (116-131) Addendum # 1 December 15, 2016 Page I 1 I YR IEID CONFERENCE AG NA Project: 116-131 Newman Center Roof Repair December 13, 2016 11:00 a.m. (Local Time) Welcome and Introductions Sign -in Richard Estes, Design and Administration — City of South Bend (574-235-5896) Toy Villa, Construction Manager — City of South Bend Patrick C. Kerr, P.E., Ph.D., City Engineer — City of South Bend Aaron Kobb, Director of Economic Resources — City of South Bend Joseph Dzierla, Project Architect Brad Emberton, Site Developer Direct all questions, in writing, during bidding: Richard Estes, Engineer I for South Bend Public Works, restes a2southbendin.gov Questions due by 5:00 p.m. (Local Time) Thursday, December 15, 2016 It. Project Overview The work shall be carried out under one prime contract. A. Base Bid covers the removal of portions of the existing roof and installation of a new roof according to the intent of the Plans and Specifications. a. Demolition and removal from site of portions of existing roof. b. Installation of a new membrane roof system at portions of existing roof. c. Installation or repair of gutters, downspouts, and scupper boxes. d. Installation of new copings and sheet metal flashings. Ill. Critical Schedule The project will have a completion date of May 30, 2017 for all work. The contract time will start when the Notice to Proceed is delivered and signed. Liquidated Damages - $500/ calendar day — Special Provisions Section XVI.B.2 IV. Bidding Overview Plans and Specifications The Contract Documents are on file and available for public inspection commencing on the first advertise date during regular working hours at the Department of Public Works (1316 County -City Building, South Bend, Indiana), and at MACIAF 3215-A Sugar Maple Court, South Bend, IN 46628. Additionally, the Contract Documents will be available that ATTACHMENTS • Pre -Bid Meeting Agenda and Sign In Sheet END OF ADDENDUM #1 Newman Center Roof Repair (116-131) Addendum # 1 December 15, 2016 Page 12 same day for inspection or purchase at American Reprographics Company ("ARC", located at 1303 Northside Blvd., South Bend, Indiana, 46615), http://www.e-aro.com, (574) 287-2944, toll free at (800) 783-7231. There will be a non-refundable charge for reproduction as set by ARC for every set of documents for all bidders. Bids are due at the Office of the Board of Public Works, County -City Building Room 1316, 227 West Jefferson Blvd, South Bend, Indiana, 46601 until the hour of 10:30 a.m., Local Time, on December 22, 2016. A checklist for bidders is included in the Contractor's Bid for Public Works, sheet 1. Acknowledgement of receipt of any Addendum to be included in bid submission. Bids must be on the City of South Bend Contractor's Bid for Public Work Form, accompanied by a Certified Check or Bid Bond in the amount of not less than five percent (5%) of the base bid plus any alternates, in a sealed envelope noting the project name, number and your company's information on the front. Upon award, the successful Bid provider shall supply the following bonds: • Payment Bond within seven (7) days of the Notification of Award for an amount equal to one hundred percent (100%) of the contract amount. • Performance Bond within seven (7) days of the Notification of Award for an amount equal to one hundred twenty-five percent (125%) of the contract amount. Maintenance bond within ten (10) days of acceptance of the project by the City of South Bend, for an amount equal to ten percent (10%) of the final contract price, guaranteeing for a period of three (3) years after the date of acceptance of the project by the City of South Bend. MBENVBE goal is 7.1 % of the total bid amount. MWBE Forms must be completed, signed, and handed in with the bid submission. These forms are shown in the bid proposal, Contractor's Bid for Public Works, sheets 8, 9, and 10. The Contractor shall apply for and obtain any and all required permits for the work from local, state, and federal agencies and shall comply with permit requirements, including the St. Joseph County / City of South Bend Building Department. Traffic closure requests, if required, will need to be submitted to the City of South Bend Permit Office (dhanson(a)southbendin.00v) a minimum of 2 days prior to the shift in traffic. The permit office is open M-F from 9-3, except holidays. The traffic closure request form will be shown in Addendum 1. As-builts shall be performed and stamped by a professional engineer or professional land surveyor in the State of Indiana. One (1) pdf file of the entire set shall be submitted upon completion of the work. Payments for work completed during this project will be made every thirty (30) calendar days. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. V. Comments by Department of Public Works Questions due by 5:00 p.m. Local Time on 12/1512016. VI. Contractor Questions '0� Liberty Mutual® Document A31 OTM — 2010 SURETY Conforms with The American Institute of Architects AIA Document 310 Bid Bond CONTRACTOR: SURETY: (Nance, legal status and address) (Natne, legal status and principal place of business) Northern IN Roofing & Sheet Metal Corp The Ohio Casualty Insurance Company 1319 N. Iowa St. 62 Maple Avenue South Bend IN 46628 Keene, NH 03431 This document has important legal consequences. Mailing Address for Notices Consultation with an attorney is OWNER: The Ohio Casualty Insurance Company encouraged with respect to its (Name, legal status and address) Attention: Surety Claims Department completion or modification. City of South Bend Board of Public Works 1001 4th Avenue, Suite 1700 Seattle, WA 98154 Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. BOND AMOUNT: 5% of total bid amount PROJECT: (Name, location or address, and Project number, if any) Newman Center: Roof Repair The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof,, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 22nd day of December , 2016 (Witness) (Witness) POWER OF ATTORNEY The Ohio Casualty Insurance Company Bond Number; Principal: Northern IN Roofin &Sheet Metal Corp Agency Name:DeHayes Group Obligee: City of South Bend Board of Public Works Agent Code: 130178 Know All Men by These Presents; That The Ohio Casualty Insurance Company, pursuant to the authority granted by Article IV, Section 12 of the Code of Regulations and By -Laws of The Ohio Casualty Insurance Company, do hereby nominate, constitute and appoint: Sandy Roth, Mindy Zielke, Heather R. Pieper, Donald H. Stoneburner, David Relue, Jeff Pikel, Emily Kitchens, Karen S. Wallace, Martha Kinast, Renada Kelley of FT WAYNE , Indiana its true and lawful agent(s) and attorney(ies)-in-fact, to make, execute, seal and deliver for and on its behalf as surety, and as its act and deed any and all BONDS, UNDERTAKINGS, and RECOGNIZANCES, excluding, however, any bond(s) or undertaking(s) guaranteeing the payment of notes and interest thereon. And the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Company, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of said Company at their administrative offices in Keene, New Hampshire, in their own proper persons. The authority granted hereunder supersedes any previous authority heretofore granted the above named attorney(ies)-in-fact. In WrfNESS WHEREOF, the undersigned officer of the said The Ohio Casualty Insurance Company has hereunto subscribed his name and affixed the Corporate Seal of said Company this 26th day of September, 2016. VSY INS[,A JP ORPOq W Y 20 9jFe m o x1919, o �Z HI pd David M. Carey, Assistant Secretary S"1"A'fE OF PENNSYLVANIA COUNTY OF MONTGOMERY On this 26th day of September, 2016 before the subscriber, a Notary Public of the State of Pennsylvania, in and for the County of Montgomery, duly commissioned and qualified, came David M. Carey, Assistant Secretary of The Ohio Casualty Insurance Company, to me personally known to be the individual and officer described in, and who executed the preceding instrument, and he acknowledged the execution of the same, and being by me duly sworn deposes and says that he is the officer of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seat of said Company, and the said Corporate Seal and his signature as officer were duty affixed and subscribed to the said instrument by the authority and direction of the said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal at the City of King of Prussia, State of Pennsylvania, the day and year first above written. 9P PAST ��Q4`*tAONpTq<2F�y COMMONWEALTH OF PENNSYLVANIA OF Teresa Paslella, Notary Public //0.('/'W, �-W1 /W� Upper Merlonitvp.. Montgomery County ��c My Commission Expires Morca 2a,2011 �o svrvw �o Notary Public in and for County of Montgomery, State of Pennsylvania Tye, PVBx. Membop PennsylvaniaAssotlation or No�aries My Commission expires March 28, 2017 This power of attorney is granted under and by authority of Article IV, Section 12 of the By -Laws of The Ohio Casualty Insurance Company, extracts from which read: ARTICLE IV - Officers: Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or -President may prescribe, shall appoint such attorneys -in -Fact, as maybe necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bond, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers ofattorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of The Ohio Casualty Insurance Company effective on the 15th day of February, 2011: VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy orally power of attomey issued by the company in connection with surety bonds, shall be valid and binding upon the company with the same force and effect as though manually affixed. CERTIFICATE I , the undersigned Assistant Secretary of The Ohio Casualty Insurance Company, do hereby certify that the foregoing power of attorney, the referenced By -Laws of the Company and the above resolution of their Board of Directors are true and correct copies and are in full force and effect on this date. IN WITNESS WHEREOF, I have hereunto set my hand and the seal of the Company this 22nd drty of, December 2017 OP' OgPOR9 7 TF Zo , 1 24 z� 91 �pw (IL/NNI/� 30 �,� HAMPSY'dD _ tit h� Renee C. Llewellyn, Assistant Secretary