Loading...
HomeMy WebLinkAboutOpening of Bids - JMS Facade Work - Berglund Construction Company. uTrr trF, CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK INfi< CHECKLIST FOR BIDDERS "` Project Name JMS Fagade Work Project No. 116.048 For Bids Due 10:30 a.m., Local Time, December 22, 2016 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted X Form [MWBE-2.1]. X Acknowledge Receipt of 3 Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Berglund Construction Company Date: December 22, 2016 By Authorized Representative: Signature: Print Name & Title: ack Tribbia, President - Restoration Version 7/28/2016 Contractor's Bid for Public Works - 1 CITY OF SOUTH BEND, INDIANA ' w� /I> CONTRACTOR'S BID FOR PUBLIC WORK Project Name JMS Facade Work Project No. 116-048 For Bids Due 10:30a.m., Local Time, December 22, 2016 PART (Must be completed for all bids. Please type or print) Date: 12/22/16 Bidder (Firm): Berglund Construction Company Address: 8410 S. South Chicago Avenue City/Slate/Zip: Chicago, IL 60617 Telephone Number: ( 773 ) 374-1000 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: JMS Facade Work, Project No. 116-048 the City of South Bend, Indiana, in accordance with plans and specifications prepared by RG Collaborative. LLC and dated November 22, 2016 for the sum of (enter the Total Bid as shown on the Proposal) One Million Forty Thousand Dollars (g 1,040,000.00 ) (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate(/�Jtt�achment. By �a�' �_ !t (Signature) LJaC t Tribbia, President - Restoration (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this day of Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member James A. Mueller, Member Suzanne M. Fritzberg, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk Version 7/28/2015 Contractor's Bid for Public Works - 2 20 PART It (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 7/28/2016 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to cerlify to any of the statements belorv, it shall attach an esptannation to this Affndavil. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Illinois ) ) SS: Cook COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: I. Contractor has not, nor has any other member, representative, or agent of due firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, finns, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission o• thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Bran" means the government of Iran and any agency or instrumentality of Ian, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -tine. b. As provided by ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 7/2812016 Contractor's Bid for Public Works - 4 Contractor agrees that be/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have at affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public woks, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. k*.# Version 7/28/2016 Contractors Bid for Public Works - 5 I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 22nd day of Dec. 2016 Subscribed and sworn to before me this 22nd My Commission Expires June 21, 2019 County of Residence Berglund Construction Company Contractor/Bidder (Firm) Signatre utrac or/Bidder or Its Agent Jack Tribbia, President - Restoration Printed Name and Title day of December 2016 N ry Public r Cook �cy:+Y�.12' ' GAdI A. E�RR0 Noforr vubtic, Stotts of Illinois My Cor imissiyn expiros Jnno 21, 2016 Commission No. 7$g75a" Version 7/28/2016 Contractor's Bid for Public Works - 6 Project Name Project No. For Bids Due BASE BID BIDIPROPOSAL Y >x 7 CITY OF SOUTH BEND I�M1S� JMS Fagade Work 116.048 10:30 a.m., Local Time, December 22, 2016 Item No. Description Quantity Unit Unit Price Total Amount Demolish and remove the existing 1 storefront and install new storefront, and 1 Lump perform terra cotta and masonry repairs Sum $1,040,000.00 per drawings andspecifications. BASE BID TOTAL 4i1,04U,000.UU i37JL•�i:ff!l4I Item No. Description Quantity Unit Unit Price Total Amount Installation of storefront material utilizing the existing granite base along the Lump 1 western and southern facades of the 1 Sum JMS Building per the Plans and $35,000.00 Specifications ALTERNATE #1 TOTAL $35 000.00 AI_TFRNATFA2 Item No. Description Quantity Unit Unit Price Total Amount Installation of storefront material utilizing new granite base along the western and southern facades of the JMS Building Lump 1 that match the existing granite color of 1 Sum the northern most plinth (column) on the western fagade per the Plans and $66,000.00 Specifications. ALTERNATE #2 TOTAL $66,000.00 Bidder (Firm): Berglund Construction Company Address: 8410 S. South Chicago Avenue City/State/Zip: Chicago, IL 60617 Telephone Number: ( 773 ) 374-1000 By ,,-- (Signature) Jack Tribbia, President - Restoration (Printed Name of Person Signing) Version 7/28/2016 Contractor's Bid for Public Works - 7 ui W 0 W !q IL ag owg wzo m W O a' a piz yyW OiL }m0 FWW U0W z a K z _z 9 J U z 0 a oa r: U Lh m 0- E co UJ LL O m 2 LL O LL O w IL W m 'L o N O T T m o r� o 0 m 4" = O T O 7 0 06a ul a d CO G m � 0 W 7 W m E N N U N N C O •_ a`o Y W O O u3 0 0 O � O O � w O a v •o 0 0 C C T m s y 0.2 O .. W C O o m W E U t O O W U. (D c No m c 3 m F- Y 'C a> c u m m ° E wr m E O va u U m G O C o LL O a wv � a w w O m w a a 7 N O a O Z C r y s • 3 - 00 N N O o w_v m mo oo� E E m O o C Z. z U 'lj 'i: U N N m C o 1t 2 d m v 0 m o c o 0 H a T via ti a 'm c v o = 0 0 E EU Q W m O 0 W o m Cl) Hi v u N c a o a �v va av d= n � O T N o v U d �� L nQ U) o C w O L i rp. N = Gf 0v a` v = a= C V 2 C) v L a �? E a` v y co > T 6 co o It U p Z a a C iaE0 W M x a E Z G z O w N C 0 N d m E V d W J TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA BID BOND Hartford, Connecticut 06183 CONTRACTOR: SURETY: (Name, legal status and address) (Name, legal status and principal place of business) Berglund Construction Company Travelers Casualty and Surety Company of America 8410 S. South Chicago Avenue One Tower Square Chicago, Illinois 60617 Hartford, CT 06183 City of South Bend OWNER: Board of Public Works (Name, legal status and address): County -City Building 227 West Jefferson Blvd. South Bend, IN 46601 BOND AMOUNT: Five Percent ( 5% ) PROJECT: (Name, location or address, and Principal number, if any) JMS Fatrade Work Project No. 116-048 108 n. Main Street South Bend, IN 46601 The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 22nd day of Decembef 2016 (Witness) Beralund Construction Compan (Princt 0 � (Seal) (Titl ck Trib la, President -Restoration Travelers Casualty and Surety Company of America (Surety) (Seal) A f f Y i(yy I)Y /N Itle) dins M. Damato''' Attorney -In` --Fact The Company executing this bond vouches that this document conforms to American Institute of Architects Document A310, 2010 Edition AOW POWER OF ATTORNEY TRAVELERSJ Farmington Casualty Company St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surely Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St. Paul Guardian Insurance Company Attorney -In Fact No. 222536 Certificate No. 003727050 KNOW ALLMEN BYTHESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company me corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Carol F. Tasciotti, Evonne Brown, Adele M. Korczak, Grace Villarreal, Gail Schroeder, Cindy Genslinger, Gina M. Damato, Thomas A. Pieter, Erik Janssens, Jane Bronson, Michael Damewood, Rosemary Muliere, Kathleen M. Anderson, Vaenessa Sims, Luisa Seymour, Marva Miller, Thomas N. Taguc, Brenda D. Hockberger, Meredith Day, Carlina A. Jewell, Tara S. Petersen, Todd D. Baraniak, Dale F. Poquette, Oscar F. Rincon, Heather Meyer, Moises Alcantar, James P. Fagan, Heather J. Meneghetti, Stephanie Miller, Grace Lawrence, David Letcher, Andrew Stm Ann Mulder, Gabriel Jacquez, Amber E. Armand, Matthew Donovan, Joanna L. Leggett, and Matthew Tobias "" _. - - ^1 , their true and lawful Attorneys) -in -Fact, State of ILLINOIS County of COOK I((}} n n this C) t)a kday of d t 2016 before me personally appeared Gina M. Dam ato own to me to be the Attorney -in -Fact of TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, the corporation ��� rat executed the within instrument and acknowledged to me that such corporation executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year in this certificate first written above. OFFICIAL SEAL. BRENDAD.NOCKBERGER LOTARY PUBLIC - STATE OF ILLINOIS COMMISSION EXPIRES FES 9, 2020 State of Connecticut City of Hartford ss. (Notary Public) �Snnn •••T� +�a�o �'tlNaB' N. By: Georg Thompson, tr /ice President On this the 16th day of June 2010 , before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. �,TlT In Witness Whereof, I hereunto set my hand and official seal. T*Aq My Commission expires the 30th day of June, 2011. O '�i181\p.%+ 0� Marie C . Tetreaul[,Notary Public .Q� 58440-4-09 Printed in U.S.A. DEPARTMENT OF ADMINISTRATION ,.• �, STATE OF INDIANA Division of Supplier Diversity Michael R. Pence, Governor Indiana Government Center South 402 West Washington Street, Room W478 Indianapolis, IN 46204 4/8/2016 (317) 232 - 3061 Mr, James Pridgen RHCI LLC, dba Robert Haines Co. 2747 N. Emerson Ave. Indianapolis, IN 46218 Subject: Application for MBE Certification Dear ivh•. James Pridgen, Congratulations! The Indiana Department of Administration, Division of Supplier Diversity is pleased to inform you that RHCI LLC, dba Robert Haines Co. is hereby certified as a Minority Business Enterprise (MBE). Your company provides a commercially useful function in the areas listed below. Only work performed in these areas will be counted towards Minority Business Enterprise (MBE) participation: UNSPSC CODE, (S) Corte Description 72151910 Mortar tuckpourting or restoration service 72153204 Damp proofing service 72153205 Caulking service 72153207 Glazing of concrete surfaces service 72153209 Waterproofing service 72153501 Building exterior cleaning service 72154011 Epoxy application service This certification is valid through 4/30/2019. Although your certification is valid for a three-year period, you are required to submit an annual Affidavit of Continued Eligibility (ACE) form, located at http://www.in.gov/idoa/files/ACE Form.pdf. Please remember you must notify as immediately if any changes occur. Failure to notify us of changes or to provide the ACE form annually will result in revocation of your certification. Changes include, but are not limited to, changes in location, contact information, ownership or control. We encourage you to visit IDOA's procurement website, http://www.in.gov/idoa/2463.htm, and update your Business Registration Profile. It is important that you review and update your profile regularly, because state purchasing agents and prime contractors may use this information to contact you for business opportunities. For questions regarding your registration profile, you may contact our office at 317-232-3061. While this letter serves as notification of certification, it does not serve to prove continued eligibility. Please visit http://www.in.gov/idoa/minority/Certifications.xls to verify certification status. Please contact our office at (317) 232-3061 if you have any other questions. Reference: RHCI LLC, dba Robert Haines Co. We ask that you please contact our office at (317) 232-3061 if you have any questions or concerns about your letter. Sincerely, C Terrie F. Daniel, Deputy Commissioner Indiana Department of Administration Division of Supplier Diversity TFD/JW 1316 CouNrv-Crry BUFLDING 227 W. JEFFERSON BOULEVARD Soon{ BEND, INDIANA 46601-1330 PHONE 574/235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: December 9, 2016 To: All Bidders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: JMS Fagade Work Project Number: 116-048 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 12/9/16 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Si; Date: 12,«, .- 1316 COUNTY -Ow BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject CITY OF SOUTH BEND December 15, 2016 All Bidders PHONE, 574/235-9251 FAX 574"235-9171 TDD 574/235-5567 BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Linda M. Martin, Clerk, Board of Public Works Addendum Number: 2 Project Name: JMS Fagade Work Project Number: 116-048 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 12/15/16 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Berglund Construction Company Authorized Signature: Date: 12/22/16 1316 COUN'CY-C[TY BmI ANG 227 W. JEFEHRSON BOULEVAM) SOUTH BEND, INDI_ANA 46601-1830 Date: To: From Subject PHONe 5741235-9251 FAX 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS December 16, 2016 All Bidders Linda M. Martin, Clerk, Board of Public Works Addendum Number: 3 Project Name: JMS Fagade Work Project Number: 116-048 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 12/19/16 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Si Date: NIBERGLUND BE Y O N D B U I L D ING Established 1911 berglundco.com Corporate Office 6410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E. Wacker Dr., Ste. 2450 Chicago, IL 60601 312.726.6624 Indiana Office 126 Venturi Dr. Chesterton, IN 46304 219.926.4246 City of South Bend, Indiana Contractor's Bid For Public Work JMS Facade Work — Project No. 116-048 Response to Part II, Section I Experience Questionnaire Item 1. The following information is included: • Berglund Construction project listing for the months 12/2015—12/2016 sorted by market segment • Berglund Construction Jobs Billed Complete 2015 — 2016 • Berglund Construction Largest Projects in the Past 5 Years Berglund Construction - Market Segment Analysis Detail Projects For Months: 1212015 - 12/2016 Market Segment Count Dollars Healthcare 46 89,531,365.49 216006-UCMC- CCD Building Leak Mitigation Repairs M16 28,251.43 216027- St. Bemards Hospital - Statue Relocation 04/16 30,506.94 216030- Advocate Trinity 2016 Exterior Repairs 05/16 345,916.45 216046- Pipeti8era Welfare Fund- Wellness Center 11/16 998,765.51 216048- Northwestern Memorial - Beam Repair 05116 22,296.66 216074- 2519 N. Clark Street - Spoil Removal 07/16 0.00 216084- Northwestern Memorial - Beam Repair 08/16 22,939.93 216104. Advocate Good Samaritan-Misc Cleaning & Limestone Repairs 10/16 284,785.00 216109. Swedish Covenant Hospital - East Parapet Rebuild 10/16 69,550.00 216115- St. Anthony- East Front Stair Repair 11/16 12,900.00 415014. Porter Hospital MOB 2nd FI Oncology Suite Build Out 12/15 645,481.24 416002- TST PodegLLC Porter MOB Lobby Wall Protection 02116 12,668.00 416005. Porter VMC Renovation- Starbucks Cafe 06/16 70,395.39 416007- Methodist SL Pharmacy Leak Repairs 07116 19,687.00 416010- Midwest Center Entrance Remodel 10/16 127,800.00 416012- Porer Portage Hospital Women's Restroom 11/16 4,708.00 416013- Porter VNA Michigan City Clean Up 11/16 25,000.00 514035- 1 St. Bernard - Mechanical Failure 10/16 63,094.91 515039- Advocate Trinity Cardiac Mini Door 127/5 8,357.47 515040- NMH 14th Floor Cage Relocation 12/15 48,954.00 516002- NMH Lower Concourse Elevator Threshold Repair 01/16 9,174.00 516003- NMH 12th Floor Sliding Doors Replacement 02/16 11,684.00 516004- LaRabida Children's Hospital- Expansion Joint Cover 01116 2,585.00 516006-Advocate Trinity- 2nd Floor Patient Doors 02116 45,386.00 516007- UCMC Mitchell Hospital EP Lab TW150 02/16 1,127,390.00 516008- St. Bernard Hospital Convent Demollion & New Parking Lot 03/16 921,777.90 516009- Advocate Trinity- Room 239 04/16 80,442.00 516010- Mercy Elevator A1dum Investigation T&M 04116 1,971.04 516011- NMH 10th Floor Flash Tank 04/16 30,342.00 516014- Swedish Covenant Hospital ED Renovation 05/16 9,685,181.00 516015- LaRabida Children's Hospital- Conference Room Renovation 06/16 340,264.00 516016- UCMC Mitchell Curtain Wall Testing Project 05/16 50,659.00 516017- VOIDED PROJECT 06/16 0.00 516018- Mercy OR Temporary AND installation -T&M 06/16 50,554.96 516019. Cade Foundation Hospital- Project X Al The Fields 07/16 58,950,686.00 516020. Mercy i at Fl Radiology Reading& Nuclear Med Waiting Room 06/16 63,512.00 516021- NMH Lavin Executive Health Pre -Con 07/16 11,470.00 516022- Cade Foundation Hospital - Infrastructure/Other Projects 00/16 5,902,359.00 516023. Mercy Surgery HVAC 09/16 15,476.00 516024. LaRabida Front Entry Stair Repair 09/16 18,426.00 516025- Swedish Covenant Hospital Mechanical Infrastructure Project 10/16 843,197.00 516026- Advocate Trinity Hospital AHD 5-13 Project 11/16 0.00 516027- Advocate Trimly Hospital South Building HVAC 11/16 7,957,765.00 516029. St. Bernard Hospital Water Pipe Burst 11/16 0.00 516030. Mercy Hospital Infusion Therapy 12/16 416,144.00 516501- Cade Foundation Hospital Project 04/16 162,862.66 16 Old jobs Education 86 25,158,782.40 2/5010- 09/16 0.00 215010-26 UC- Ryerson Leak Mitigation 12/15 2,875.45 215010- 27 UC - Rosenwald Hall Leak Mitigation Repairs 12/15 2,112.91 215010-28 UC- Pick Hall Paver Restoration 12/15 16,918.79 215010-29. UC Ida Noyes- West Elevation Concrete Sidewalk Replacement 12115 6,613.46 216004- UC -Cloisters Facade Make Safe Repairs 01116 720,000.00 Berglund Construction glen. [2310251 Page i ket Segment Analysis BC Market Segment Analysis Detail Sort By Market Segment For Months: 1212015-12/2016 LL tAew i rolia , 3 Market Segment Count Dollars Education 216010- UC- Service Agreements 09/16 0.00 216010-01 UC- Oriental Institute Concrete Floor Injection Repairs 01/16 10,600.66 216010-02 UC -S. Campus Resident Hall/ S. Ele. 5th FL Leak Mitigation 01116 4,700.30 216010-03 UC -S. Campus Residence Hall- Elevator Pit Leak Mitigation 01/16 1,667.77 216010-04 UC- LASR Building Interior Leak Mitigation Repairs 01/16 6,566.59 216010- 05 UC - McGNfea House Elevator Pit Repair 01/16 11,960.72 2160 10- 06 UC- CTS Storage Room 002- Leak Mitigation Repairs 01/16 3,068.86 216010-07 UC- Hines Geophysical Lab -East Entry Threshold Leak Repairs 01116 3,521.96 216010-08 UC- Hitchcock Temporary Waterproofing on West Gable 02/16 2,223.22 216010-09 UC- Zoology Building Emergency Make Safe 02/16 6,621.26 216010-10 UC- Pick Hall Stair Repair 03116 16,077.40 216010-11 UC- International House Stair Rehab/North Elev. W. Wing 03/16 13,915.34 216010-12 UC- Quad Pervious Concrete Epoxy Repair -Task Order F246201 03/16 96,596.18 216010-14 UofC SA Levi Hall New Wall Openings 03/16 903.94 216010-15 UC- Oriental Institute, Concrete Floor, Injection Repairs 04/16 2,560.09 216010-16 UC- GC IS Loading Dock Stair Repair 05/16 2,013.12 216010-17 UC- Oriental Institute Leak Mitigation Repairs 05/16 5,952.18 216010- 18 UC - Law School: Reflecting Pond, Sealant Restoration 06116 10,663.37 216010-19 UC - Hines Lab - East Elevation Fume Stack Accesses 06/16 4,981.98 216010-20 UC- GCIS Vacuum Lab Experiment Steel Supports 06116 24,800.05 216010-24 UC - Levi Hall, South Lobby- New Wall Openings 07116 1,447.60 216010-22 UC- Paulson institute/East Elevation/Masonry Repair 07116 2,543.10 216010-23 UC - Judd Hall- Drain Tile Installations 08/16 32,382.40 216010-24 UC- South Campus Residence Hall Wail Investigation 08/16 5,993.06 216010-25 UC- Accelerator Ramp Repairs 08/16 31,807.09 216010-26 UC- Accelerator Builtling- Asphalt Sing Hole 08/16 10,342.90 216010-27 UC - Caner Library- West Concrete Repairs 08/16 7,675.37 216010-28 UC- Ellis Parking Garage Sidewalk Repair 08/16 7,748.21 216010- 29 UC - Booth School Concrete Repairs 08/16 7,727.35 216010-30 UC- Judd Hall Stone Removal and Storage 08/16 4,405.99 216010-31 UC- Palevsky Commons Concrete Grinding 08/16 1,161.22 216010-32 UC - Law School - Comer Stone Replacement (Time Capsule) 08/16 1,678.13 216010-33 UC- Reynolds Club- New Masonry Opening 08/16 2,007.40 216010-34 UC- Social Science Bldg.- S. Elev Leak Invest/Mason Rep 08/16 8,161.44 216010.36 UC- Accelerator Building Sidewalk Replacement 08/16 15,711.23 216010-37 UC - Law School- Utility Lid Concrete Repair 08/16 4,932.38 216010. 38 UC- Logan Center Leak Mitigation 08/16 1,470.85 216010-39 UC- Bartlett Hall Commons/Interior Masonry Cleaning 09/16 1,603.69 216010-40 UC- Chapin Hall- 3rd Floor Masonry Repair 09/16 7,096.42 216010.41 UC- Theological Society Water Entry Investigation 10/16 13,967.33 216010-42 UC- Saieh Hall Plaza Level Window Sill Sealant Replacement 10/16 7,112.50 216010.43 UC- Saieh Hall 3rd Floor Parapet Rehabilitation 10/16 23,910.16 216010.44 UC- Garage Door Rehabilitation 10116 29,620.38 216010.45 UC- Make Safe Masonry Repairs- Cobb Oriental Bookstore 11116 20,190.00 216010.46 UC- Walker Hall Tower Ladder 12/16 29,701.00 216010.47 UC- Swift Hall Tower Ladder 12/16 30,642.00 216016- SAIC - 280 S.Columbus- Leakage Investigation at Foundry 03/16 36,246.00 216025- Cade Foundation Hospital- Main Campus Exterior Finishes 04/16 357,556.50 216031-NWU- 720 University Place- Exterior Facade Repairs 05/16 490,306.69 216032- UCMC - BSLC Facade Limestone Repair 05116 134,533.78 216033-CICS-Bucktown School- Investigation Opening 06/16 3,950.00 216036-MSI- Central Pavilion, Weatherproofing 05/16 2,074,964.00 216038- SAIC- Facade Repairs Phase 2 -162 N. Slate 05/16 1,040,143.10 216039- Waubonsie Valley High School- Exterior Wail Repairs 06/16 836,894.53 216042-Moody Bible - Sweeling Center- East Plaza Rehabilitation 05/16 317,156.43 Berglund Construction glens [2310251 Page 2 ket Segment Analysis BC Market Segment Analysis Detail Sort By Market Segment For Months: 1212015- 1212016 Market Segment Count Dollars Education 216045- PipefiHers Training Fund -Training Center 11116 3,470,018.78 216050- NU- Ward Facade Restoration 2016 05/16 618,372.21 216055- Wheeler/Union Township High School& Middle School Gymnasium 06116 135,992.03 216057- 1 UC Quad -Campus Facade Assessments 2016-Bauer Latoza 06/16 66,347.91 216057-2 UC Quad- Campus Facade Assessments - INSPEC 06/16 30,883.04 216059- UC - Neubauer N. Elevation Window WelVConcrele Curb Repair 06116 6,637.43 216068- Northwestern University - Tech Plaza 07/16 87,877.94 216070- 29 S. LaSalle Street - Exterior Wall Rehabilitation 07116 1,657,233.00 216078-NU- Pool Maintenance 07/16 89,000.00 216080-NWU- President's House Main Entrance 08/16 8,404.28 216083-UC- Henry Hinds Laboratory Building 08116 211,W2.00 216090-NWU- Presidents Green House Glazing Rehabilitation 09116 6,170.36 216100- MSI- Service Agreements 09116 0.00 216100- 1 MSI- W. Pavilion NE Comer Camera Mount Installations 09116 500.00 216102-NU Rubloff- Facade Inspection(WJE) 10/16 25,606.89 216103- NU Rubloff -Sign Bracket Install 10/16 8,628.04 216111- SAIC - 112 S. Michigan Emergency Facade Repairs E. Elevation 10/16 39,852.00 216120- UCMC - Tuckpointing - American School of Business PO# 568286 11116 10,000.00 216121-NU-Deering Library- Exterior Masonry Repair WO#48277 11116 35,128.00 415015- Purdue- Bechtel Design Center Preconstruction 12/15 15,000.00 416001- New Elementary School - Bid Package No.1 12/15 10,923,189.00 416003- Valparaiso University Discus Cage Repair 04/16 4,750.00 416501- Purdue University Feasibility Estimating 09116 1,500.00 516001- MFS- Early Childhood Center 03/16 35,000.00 516005- FWP- Cafeteria Preconstmction& Investigative Work 01116 1,092,194.66 31 Old jobs Retail 4 1,887,133.83 216028- Shalom Memorial Park - Water Feature 05/16 162,275.00 2%037-SNB- Block 125 Easement Modification -2016 05/16 34,320.00 216086-SNB- Bulltling improvements- Emergency Generator 08116 - 1,154,474.00 516013- Monroe Park Plaza 05/16 536,084.83 2 Old jobs Office Building 11 13,657,350.28 216011- PipefiHers Ogden - Executive Office Renovation 02/16 17,998.20 216024- PipefiHers' Ogden Executive Off fee Renovation 04/16 570,147.06 216034- PipefiHers Butterfield - Mire T&M Repairs 05/16 18,946.05 216040- PipefiHers Ogden - Health & Welfare Renovation 05116 1,108,673.88 216044- PipefiHers Association Fund - Training & Wellness Center 11/16 10,000,000.00 216053-PipefiHers'Joliet - Parting Wall Removal 06/16 3,875.00 216060- 350 N. Orleans Mockups 06/16 0.00 216076-Hyde Park Bank- Main Entrance Pavers 07116 2,650.00 216085- 300 S. Wacker -Structure Repair and Metal Panel Replacement 08/16 895,000.00 216088- PipefiHers Ogden Snow Melt 08/16 967,010.09 216119- 303 E. Wacker- Middle Columbus Repairs/Garage Repairs 11/16 73,050.00 8 Old jobs Financial Institution 6 23,061,209.18 215103-Chase Tower ATM 12115 7,000.00 216015-Chase Tower- Interior Panel Repairs 03/16 54,862.00 216043- Chase Tower - Storefront Refurbishment - Preconstmctlon 05/16 17,500.00 216056- Chase Tower - Mike. Caulking at Entrances 06/16 1,789.65 216114-Chase Tower- Storefront Refurbishment 11/16 22,975,447.53 416004- Chase Bank Hammond-(Langehaumer) 06116 4,620.00 1 Old jobs Berglund Construction gferrc [2310251 Page 3 ket Segment Analysis BC Market Segment Analysis Detail Sort By Market Segment For Months: 1212015 - 1212016 FRI, Market Segment Count Dollars Multi -unit Residential Multi -unit Residential 29 11,547,986.86 215104- Mike Maloney Cabinet Takeoffs 12115 0.00 216001- 800 N. Michigan - East Elevation Leak Mitigation Repairs _ 01/16 2,006.70 216003- 175 East Delaware Place -Tank Coating Repairs 01/16 46,690.85 216005- 1120 N. LSD - Facade Repairs and Window Replacement 02116 4,112,080.86 216008- Metro North Condo - Phase 2 Repairs 02/16 2,184,977.62 216012- Admiral's Pointe Condominiums Exterior Wall Repairs 03/16 958,481.68 216014-Lake Point Tower- Emergency Repair 02116 6,630.60 216017- 1000 Lake Shore Drive - Trash Room Plate 03/l6 3,160.00 216019- Antonini Residence- Misc. interior& Exterior Repairs 04116 38,879.68 216041- 100 E. Huron- Sealant Replacement 05/16 1,515,04 216047- Kennelly Square Brick Removal 05/16 500.00 216049- The Granville - Balcony Rail Post and Concrete Repair 05/16 930,898.75 216051-800 N.Michigan-Balcony Repair - Unit 5101 05/16 9,849.39 216052- Fulton Court Condominiums- Masonry Wall Openings 06116 33,499.86 216058- 800 N. Michigan - W. & S. Facing Elevations/Leak Repairs 06116 6,793.39 216071- 100 E. Huron- Roof Investigations 07116 6,835.00 216072- 1130 N. LSD- BoomiiR Investigation 07116 6,350.00 216075- 100 E. Huron Facade Repairs 08116 151,291.08 216079- Waterford- Sun Deck lnstallalioe Roofing Repairs 08/16 680,550.00 216081- Wheaton Apartment Trial Scupper Repair: Bldg 92 08116 363,926.00 216082- 625 West Jackson- West Parapet Rebuild 08116 318,416.99 216087- Wheaton Apartment Hi - Scupper Retrofit 08/16 645,391.00 216094- Clock Tower Lofts- Unit 400 Structural lnvestgation 09116 5,000.00 216096- 532 W. Dickens- Sealant Replacement 09/16 10,136.57 216098- Newport Village Repairs- Garage Foundation & Floor Repairs 10/16 240,000.00 216099- John Leon - Drywall Ceiling Repair at Unit P 09116 1,066.85 216112-John Leon- Floor and Door Repair 10116 50,577.99 216116- Admiral's Pointe Condominiums - Door Replacement 11116 13,981.77 516012- 111 Chestnut Rowhomes 04116 718,500.19 8 Old jobs Government 4 2,693,763.80 216035- GSA -JLK Inspection 08/16 73,990.00 216073- 18 West Jackson Investigation 07116 5,945.00 216095- GSA -Louver Repairs 09/16 1,813,212,80 416009- National Mascot Hall of Fame -City of Whiting 10/16 700,616.00 3 Old jobs Religious 4 1,505,437.41 216018- St. Luke Parish - Phase II 03116 678,606.41 216089- St. Paul's Church - North Entrance Leveling 09/16 121,831.00 216091-St. Gertrude- East Elevation Ministry Center Renovations 09/16 245,000.00 216117- Shrine of Christ The King- Masonry Facade Stabilization 11/16 460,000.00 5 Old jobs Industrial 3 3,840,344.91 216013- Morton Salt- Emergency Wind Damage Repairs 02116 8,283.98 216093- Morton Sall - Boom Lift Inspection 09/16 5,053.95 416008- Garmong-LOV Shell Building 07/16 3,827,006.98. 1 Old jobs Other 38 3,269,236.00 215105- ComEd - Maywood Tech Center- Parapet Wall Repairs 12/15 10,263.08 215106- ConnEd - Maywood Tech Center- Parapet Wall Replacement 12/15 295,143.84 215107- ComEd - Maywood Tech Center- Flashing Repairs 12/15 15,410.00 216002-Driehaus Museum-1525 N. State - Temp Repairs 01116 4,771.57 Berglund Construction Page 4 gferro 12310251 kel Segment Analysis BC Market Segment Analysis Detail Sort By Market Segment For Months: 1212015-1212016 Market Segment Other 216007- ComEd - Maywood Tech Center- Erect Emergency Canopy 216009- Driehaus Museum -1525 N. Stale - Paver Repairs 216020. ComEd- Maywood Tech Center -Work Area 216021- Union Station Inspections 216022- Glessner House Museum- Masonry Restoration 216023. Sunberg - Vehicle Damage Repairs to Masonry & Trail Repairs 216026. Emergency Repairs at PF Charge 216029- 300 E. Illinois -Concrete Inspection 216054. Union Tower Exterior Column Repair 216061. Glessner House - Mud Slab 216062- ComEd Substation - TSS 101 Itasca 216063- ComEd Substation - SS 851 Washonaw, 216064- ComEd Substation - TSS 51 McCook 216065- ComEd Substation - GS 18 Will County 216066- ComEd Substation - TDC 550 Clearing 216069- Midway Airport 216077- 10 East Grand- Emergency Repair to Precast Panel 216092- ComEd Maywood - Doghouse Removal 216101- Salvation Army- Mumford Plumbing Repair 216105- Gaareaux Masonry Investigation 216106- ComEd Maywood - WA8 216107- ComEd - Dixon 216108- ComEd Maywood - WA9 216110- 18 E. Pearson - Annual Maintenance (T&M) 216113- Wood Dale Public Works- Garage Column Repair 216998- Warranty Work - Restoration 216999- Cost to Closed Jobs - RE 416006- Crown Point Community Library Winfield Brunch Renovations 416011- Schererville Dairy Queen 416998- Warranty Work - IN 416999- Cost to Closed Jobs - IN 516502- Central Slickney Park District 516998. Warranty Work -DT 516999- Cost to Closed Jobs - DT 14 Oldjobs GrandTotal Berglund Construction Count Dollars 02/16 9,500.00 Omit 2,141.08 04/16 241,574.48 04/16 168,897.00 04/16 0.00 04116 41,467.00 05/16 15,908.03 05/16 16,612.10 06/16 93,953.67 06/16 9,579.72 07/16 12,770.00 07/16 159,547.00 08/16 115,873.18 10116 34,005.00 08/16 121,559.00 07/16 210,890.00 07/16 221,640.00 09116 1,243.63 11/16 258,307.74 10116 7,500.00 10/16 178,067.56 10/16 203,969.50 10116 166,635.84 10/16 0.00 10/16 45,000.00 01116 0.00 01116 0.00 06/16 689,405.98 11116 0.00 01116 0.00 01/16 0.00 04/16 17,600.00 01116 0.00 01116 0.00 231 176,052,610.16 Page 5 gferm [2310251 ket Segment Analysis Berglund Construction Jobs Billed Complete 2015 - 2016 Contracts: 215001-- 216999- Contract Left Contract Amount To Bill 215001- Amalgamated Bank Masonry Inspections & Stabilization 22,769 0 215002- Morton Sall - Emergency Repairs at Storage Building 1,175,598 0 215003- Beverly Country Club Emergency Repairs 253,777 0 215004- Pipefilters' Mokena - T&M Misc Repairs 887,478 0 215005- U of C - Mitchell Door Replacement 25,772 0 215006- Hyde Park Bank Assisted AE Facade Repairs, N, E, & S 1 20,000 0 215007- Salvation Army Booth Hall Temporary Repairs 12,150 0 215008- Newport Condominiums - Storefront Rehabilitation 834,053 0 215009- Morton Salt - BE Parapet 32,550 0 215010- 1 UC - Chapin Hall Leak Mitigation Repairs 11,112 0 215010- 2 UofC SA: S Campus Residence Hall Stone Cleaning 2,731 0 215010- 3 UoIC SA; Snow Removal 3,070 0 215010- 4 UofC SA: Culver Hall Leak Mitigation Repairs 1,199 0 215010- 5 UC - Child Development Center/Replacmeni of Damage 10,839 0 215010- 6 U of C - Burton Judson CounsNine Removal 3,576 0 215010- 7 UC - South Campus Residence Hall: Damaged Railing 10,401 0 215010- 8 UC - Burton Judson Courts Louvers - Remove/Reinstall 4,411 0 215010- 09 UC - Cloister Apartment Leak Mitigation Injection Reps 15,574 0 215010-10 UC - President's Residence - Security Box Installation: 2,658 0 215010-11 UC - Pervious Concrete Patch Repair Mock-up 16,326 0 215010-12 UC - President's Residence - Foundation Waterproofin 11,927 C 215010-13 U of C- Cloisters Facade Examination 72,830 0 215010-14 UC - Rosenwald Hall Terrazzo Stair Repair 13,257 C 215010-15 UC East Quad - Pervious Concrete Repair Mockup 73,421 0 215010-16 UC - South Quad Paver Repair 7,859 0 215010-17 U of C - Hutchinson Commons New Scupper Box Opei 7,633 C 215010-18 U of C - Cathay Dining Hall Air Barrier Investigation/Re 6,582 0 215010-19 UC - Classics Building - Elevator Pit Leak Mitigation 5,536 C 215010- 20 UofC SA; Karsten Teaching Center 17,274 0 215010- 21 UofC SA; Hutchinson Commons Fountain Removal/Re 2,586 0 215010- 22 UC - Cloister Make Sate Repairs 166,724 C 215010- 23 UC - Langley Press Warehouse - Masonry Repairs 24,041 C 215010- 24 UC - Regenstein Library - Make Safe Granite Repairs 11,838 C 215010- 25 UC - Gates Blake Leak Mitigation 3,641 C 215010- 26 UC - Ryerson Leak Mitigation 2,875 0 215010- 27 UC - Rosenwald Hall Leak Mitigation Repairs 2,113 0 215010- 28 UC - Pick Hall Paver Restoration 16,919 C 215010- 29 UC Ida Noyes - West Elevation Concrete Sidewalk Rel 6,613 C 215011- 800 N. Michigan Balcony Facade Inspection 66th A 711 0 215013- 800 N. Michigan Window Sealant Repairs 11,610 0 215014- 1000 Lake Shore Drive - Entrance Promenade Repairs 676,786 0 215015- Salvation Army Booth Hall Long Term Repairs Precon Be 9,563 C 215016- NU Deering Library Pre -Con / Cost Estimating Services 7,500 C 215017- 2230 S. Michigan Inspections 12,525 0 215018- UC - 5533-36 S. Blackstone - Interior Entry Stair Railing 2,612 0 215020- Wheaton Center Building Six Structural Repairs 455,099 C 215020- 1 Wheaton Center Building 6 Structural Repairs -permit o 276 0 215021- ComEd - Maywood Tech Center 216,961 C 215022- 70 E Walton - Investigative Work 3,760 0 215023- U of C - Burton Judson Repair & Replace Stairs 994 0 215024- 10 East Grand - Panel Replacement 266,478 0 215025- Pipefilters' Ogden - First Floor Office Renovation 2,970,379 0 215026- UC - Accelerator Building: Masonry Repairs/Copings Fini: 62,717 0 215027- Morton Salt - East Warehouse Sharing 91,205 0 215028- 18 E. Pearson - Foundation Crack Repairs 4,900 0 215029- CTA Pedestrian Tunnel Investigation 3,415 0 215030- 910 S. Michigan - Surface Cleaning & Refinishing - Mock- 3,600 0 215031- NU - Deering Library - BE Turret 97,979 0 215032- MSI - Emergency Sidewalk Repair 6,719 0 215033- Racquet Club of Chicago - 2015-2016 Exterior Wall Repai 551,691 215034- MSI`- Central Pavilion, Critical Exterior Restoration 1,538,228 215035- ComEd - Commercial Center Parking Garage Concrete Si 8,435 215036- UCMC Leak Investigation Openings 10,113 215037- WaterFord Garage Repairs 21,697 215038- 800 N. Michigan Ave. - Balcony Wall Opening - Unit 2902 4,500 215039- 300 E. Illinois - Granite Repairs 6,896 215040- Advocate Trinity Hospital - 2015 Exterior Hospital Repairs 224,970 215041- 1000 Lake Shore Drive - Compactor Room Coating 9,700 215042- Hedrich Blessing - Roof Service 2,530 215043- Evanston Township HS - Roof Replacement & Facade Re 778,249 215044- UC - Burton Judson Repair & Replace Stairs 401,704 215045- Elmhurst D205 - Exterior Weatherproofing & Restoration 648,778 215046- ComEd - Streator Repairs 54,009 215047. 303 E. Superior - Tunnel Concrete Repair 12,930 215048- Optima Horizons - Parking Garage Repairs 894,847 215049- NU Alice Millar Chapel - Elevator Renovation 585,427 215050- Ashburn Baptist Church - Masonry Mitigation 2015 390,865 215051- 300 E. Randolph - Replace Granite Fins 141,868 215052- Little Company of Mary Hospital - South Pavilion Facade 94,500 215054- 70 E. Walton - Limestone Facade Repairs 552,203 215055- NWU Dearborn Observatory - Exterior Restoration 1,013,224 215056- Wheaton Center Building Six Concrete Repair & Replacer 35,547 215057- Salvation Army Booth Hall - Televise Storm Piping 2,280 215059- GSA - EMD Granite Paver Removal 29,999 215060- Driehaus Museum - Sidewalk Planter Stone Repairs 41,619 215061- ComEd - Maywood Tech Center - Penthouse Repairs 91,835 215062- 1 Northwestern - Rubloff Plaza Repairs 0 215063- ComEd - Lincoln Center 3 Pad Replacement 29,142 215064- U of C - Regenstein Library A -Level Facade Renovation 331,704 215065- MSI - Emergency Repair Work E. Pavilion N. Entry Stairw 16,038 215066- Chicago Firehouse Inspections 3,625 215067- John Leen - Garage Renovation 11,289 215068- St. Luke Parish - Exterior Restoration 158,184 215069- SAIC 7 W. Madison - Water Test 5,345 215070- NU - Ryan Field - Painting Warranty Work 0 215072- Metro North Condo - Masonry Inspections 0 215074- MSI - U-505 NE Exit Stairs - Auto Damage Repairs 22,569 215075- Ovaltine - Roof Related Masonry Repairs 25,914 215076- SAIC -162 N. State GFRC Panel Investigation 21,386 215077- Merchandise Mart - Light Court Cleaning & Painting 215,805 215078- Wisconsin Warranty Work -RE -Milwaukee and Kenosha C 8,752 215079- ComEd - Maywood Tech Center - Penthouse Repairs 249,414 215083- ComEd - Freeport 277,968 215084- Pipefitter's Aurora Flooring Rework 9,271 215085- Pipefitters Local 597 Mokena Health Center 1,445,494 215086- MSI - Masonry Substrate Repairs at Perimeter 14,659 215087- Jackson Towers - Entrance Portico - 5555 S. Everett 48,826 215088- Driehaus Capital Management Repairs - 25 E. Erie 14,667 215089- 232 E. Walton - Unit t0E Window Surround Repairs 10,000 215090- 5747 North Sheridan Road - Limited Lintel Repairs 70,501 215091- 300 E. Illinois - Garage Repairs 2,450 215092- UIC - Student Center 48,985 215093- Shops at Northbridge- Sealant Replacement 181,603 215094- Northwestern - Front Porch Repairs 7,633 215095- 300 E. Illinois - Misc Repairs at Bank 6,661 215096- Morton Salt - Boom Lift Inspection 8,070 215097- SAIC - Ballroom Stair Renovation 133,635 215098- UC Ratner Center Pool Finger Grip Repairs 2,942 215099- Shops at Northbridge- Rush & Grand Parking Garage 21,771 215100- Northwestern Memorial - Restoration 11,175 215101- Pipefitters Mokena - Med Gas Classroom Relocation 6,237 215102- Assisi Homes - Non -Critical Repairs 147,612 215103- Chase Tower ATM 7,000 215104- Mike Maloney Cabinet Takeoffs 0 215105- ComEd - Maywood Tech Center - Parapet Wall Repairs 10,263 215106- ComEd - Maywood Tech Center - Parapet Wall Replacerc 295,144 215107- ComEd - Maywood Tech Center - Flashing Repairs 15,410 215998- Warranty Work - Restoration 0 215999- Cost to Closed Jobs - RE 0 216001- 800 N. Michigan - East Elevation Leak Mitigation Repairs 2,007 216002- Driehaus Museum -1525 N. State - Temp Repairs 4,772 216003- 175 East Delaware Place - Tank Coating Repairs 46,691 216006- UCMC - CCD Building Leak Mitigation Repairs 28,251 216007- ComEd - Maywood Tech Center- Erect Emergency Cane 9,500 216009- Driehaus Museum -1525 N. State - Paver Repairs 2,141 216010- 01 UC - Oriental Institute Concrete Floor Injection Repairs 10,601 216010- 02 UC - S. Campus Resident Hall/ S. Ele. 5th FL Leak Mit 4,700 216010- 03 UC - S. Campus Residence Hall - Elevator Pit Leak Mi 1,668 216010- 04 UC - LASR Building Interior Leak Mitigation Repairs 6,557 216010- 05 UC - McGiffert House Elevator Pit Repair 11,961 216010- 06 UC - CTS Storage Room 002 - Leak Mitigation Repair: 3,069 216010- 07 UC - Hines Geophysical Lab -East Entry Threshold Lea 3,522 216010- 08 UC - Hitchcock Temporary Waterproofing on West Gal 2,223 216010- 09 UC - Zoology Building Emergency Make Safe 6,521 216010-10 UC - Pick Hall Stair Repair 16,077 216010-11 UC - International House Stair Rehab/North Elev. W. N 13,915 216010-12 UC - Quad Pervious Concrete Epoxy Repair -Task Orc 95,596 216010-14 UofC SA Levi Hall New Wall Openings 904 216010-15 UC - Oriental Institute, Concrete Floor, Injection Repaii 2,560 216010-16 UC - GCIS Loading Dock Stair Repair 2,013 216010-17 UC - Oriental Institute Leak Mitigation Repairs 5,952 216010-18 UC - Law School: Reflecting Pond, Sealant Restoratior 10,663 216010-19 UC - Hines Lab - East Elevation Fume Stack Accesses 4,982 216010- 21 UC - Levi Hall, South Lobby - New Wall Openings 1,448 216010-22 UC- PaulsonInstitute/East Elevation/MasonryRepair 2,543 216010- 23 UC -Judd Hall - Drain Tile Installations 32,382 216010- 24 UC - South Campus Residence Hall Wall Investigation 5,993 216010-25 UC- AcceleratorRampRepairs 31,807 216010-26 UC- AcceleratorBuilding- AsphaltSingHole 10,343 216010- 27 UC - Crerar Library - West Concrete Repairs 7,675 216010- 28 UC - Ellis Parking Garage Sidewalk Repair 7,748 216010- 29 UC - Booth School Concrete Repairs 7,727 216010- 30 UC - Judd Hall Stone Removal and Storage 4,406 216010- 31 UC - Palevsky Commons Concrete Grinding 1,161 216010- 32 UC - Law School - Corner Stone Replacement (Time C 1,578 216010- 33 UC - Reynolds Club - New Masonry Opening 2,007 216010- 34 UC - Social Science Bldg. - S. Elev Leak Invest/Mason 8,151 216010- 36 UC - Accelerator Building Sidewalk Replacement 15,711 216010- 37 UC - Law School - Utility Lid Concrete Repair 4,932 216010-38 UC- LoganCenterLeakMitigation 1,471 216010- 39 UC - Bartlett Hall Commons/Interior Masonry Cleaning 1,604 216010- 40 UC - Chapin Hall - 3rd Floor Masonry Repair 7,096 216011- Pipefitters Ogden - Executive Office Renovation 17,998 216012- Admiral's Pointe Condominiums Exterior Wall Repairs 958,482 216013- Morton Salt - Emergency Wind Damage Repairs 8,284 216014- Lake Point Tower - Emergency Repair 6,631 216015- Chase Tower - Interior Panel Repairs 54,852 216016- SAIC - 280 S. Columbus - Leakage Investigation at Founc 36,246 216017- 1000 Lake Shore Drive - Trash Room Plate 3,160 216018- St. Luke Parish - Phase II 678,606 216019- Antonini Residence - Misc. Interior & Exterior Repairs 38,880 216020- ComEd - Maywood Tech Center - Work Area 3 241,574 216022- Glessner House Museum - Masonry Restoration 0 216023- Sunberg - Vehicle Damage Repairs to Masonry & Trail Re 41,467 216024- Pipefitters' Ogden Executive Office Renovation 570,147 216025- Carle Foundation Hospital - Main Campus Exterior Finish( 357,556 216026- Emergency Repairs at PF Changs 15,908 216027- St. Bernards Hospital - Statue Relocation 30,507 216029- 300 E. Illinois - Concrete Inspection 16,612 216030- Advocate Trinity 2016 Exterior Repairs 345,915 216031- NWU - 720 University Place - Exterior Facade Repairs 490,307 216032- UCMC - BSLC Facade Limestone Repair 134,534 210033- CICS - Bucklown School - Investigation Opening 3,950 216034- Pipefitters Butterfield - Misc T&M Repairs 18,946 216035- GSA - JLK Inspection 73,990 216037- SNB - Block 125 Easement Modification - 2016 34,320 216040- Pipefitlers Ogden - Health & Welfare Renovation 1,108,674 216041. 100 E. Huron - Sealant Replacement 1,515 216042- Moody Bible - Sweating Center - East Plaza Rehabilitatior 317,156 216043-Chase Tower- Storefront Refurbishment- Preconstructicr 17,500 216047- Kennelly Square Brick Removal 500 216051- 800 N. Michigan - Balcony Repair - Unit 5101 9,849 216052- Fulton Court Condominiums - Masonry Wall Openings 33,500 216053- Pipefitters' Joliet - Parting Wall Removal 3,875 216054- Union Tower Exterior Column Repair 93,954 216055- Wheeler/Union Township High School & Middle School G 135,992 216056- Chase Tower - Misc. Caulking at Entrances 1,790 216057- 1 UC Quad - Campus Facade Assessments 2016 - Baue 66,348 216058- 800 N. Michigan - W. & S. Facing Elevations/Leak Repair; 6,793 216059- UC - Neubauer N. Elevation Window Well/Concrete Curb 6,637 216060- 350 N. Orleans Mockups 0 216061- Glessner House - Mud Slab 9,580 216062- ComEd Substation - TSS 101 Itasca 12,770 216063- ComEd Substation - SS 851 Washtenaw 159,547 216064- ComEd Substation - TSS 51 McCook 115,873 216065- ComEd Substation - GS 18 Will County 34,005 216066- ComEd Substation - TDC 550 Clearing 121,559 216068- Northwestern University - Tech Plaza 87,878 216071- 100 E. Huron - Roof Investigations 6,835 216072- 1130 N. LSD - Boomlift Investigation 6,350 216073- 18 West Jackson Investigation 5,945 216075- 100 E. Huron Facade Repairs 151,291 216077- 10 East Grand - Emergency Repair to Precast Panel 221,640 216078- NU - Pool Maintenance 89,000 216080- NWU - President's House Main Entrance 8,404 216081- Wheaton Apartment Trial Scupper Repair: Bldg #2 363,926 216083- UC - Henry Hinds Laboratory Building 211,012 216084- Northwestern Memorial - Beam Repair 22,940 216087- Wheaton Apartment #1 - Scupper Retrofit 645,391 216089- St. Paul's Church - North Entrance Leveling 121,831 216090- NWU - Presidents Green House Glazing Rehabilitation 6,170 216092- ComEd Maywood - Doghouse Removal 1,244 216093- Morton Salt - Boom Lift Inspection 5,054 216094- Clock Tower Lofts - Unit 400 Structural Investigation 5,000 216096- 532 W. Dickens - Sealant Replacement 10,137 216099- John Leon - Drywall Ceiling Repair at Unit P 1,067 216102- NU Rubloff - Facade Inspection (WJE) 25,607 216103- NU Rubloff - Sign Bracket Install 8,628 216105- Gautreaux Masonry Investigation 7,500 216109- Swedish Covenant Hospital - East Parapet Rebuild 69,550 216110- 18 E. Pearson - Annual Maintenance (T&M) 0 216115- St. Anthony - East Front Stair Repair 12,900 216998- Warranty Work - Restoration 0 216999- Cost to Closed Jobs - RE 0 PROJECTS In the Past Five (5) Years START & REFERENCE AMOUNT END DATE CONTACT GMP 5/2013— Mr. Paul Spieles $36,000,000 10/2013 Chief Development Officer (312) 744-9427 GMP 9/2015 — Janelle Moody $33,000,000 8/2016 STL Architects (312) 644-9850 GMP 05/2010 — Ms. Karen M. Beaty, FMA $28,000,000 2/2014 Project Manager (614) 469-5361 Agent C CM 6/2014 — Stephen Turner $27,000,000 4/2016 Vice Chancellor for Finance and Administration (219) 785-5200 CM at Risk 1/2014— Charles Holland $26,000,000 4/2016 CEO (773) 962-4165 GMP 1/2011 — Diana Kon $24,000,000 3/2012 Co -Executive Director (773) 420-2894 GMP 06/01/2010 — Mr. Jeff Mornar $24,000,000 12/04/2012 GSA Property Manager (312) 353-3422 CM at Risk 2/2011 — Mr. Richard Cerceo $22,000,000 5/2013 Vice President / COO (312) 567-2255 CM at Risk 10/2012 — Ms. Brenda Wolf $15,000,000 1/2014 President & CEO (773) 753-8631 BERGLUND ® B E Y O N D B U I L D I N G START & REFERENCE AMOUNT END DATE CONTACT GMP 9/2009— Mr. Michael Naponelli $14,250,000 10/2010 Project Architect (312) 855-1973 GMP 6/2015— Glen Rasmussen $12,400,000 6/2016 Project Manager (312) 926-6120 GMP 12/2014— Marco F. Capicchioni $12,000,000 9/2016 Vice President, Facilities Planning, Design and Construction (773) 702-2790 Lump Sum 7/2014 — Gavin Tun $10,500,000 4/2015 Project Management Capital Project Delivery (773) 834-1820 CM at Risk 11/2009— Mr. Ray Kasmark $9,500,000 3/2011 President Local 697 (219) 844-6386 CM at Risk 6/2013 — Nicole Kleidon $8,500,000 8/2016 Project Coordinator (312) 374-9455 CM at Risk 6/2010 — Mr. Steven Mar -Pohl $8,200,000 6/2011 InSite Consulting (608) 204-0825 CM at Risk 10/2009 — Ms. Maria C. Becerra $8,500,000 3/2011 Executive Director (219) 989-3265 ext 303 GMP 11/2014 — Barbara Popovic $7,100,000 9/2015 Executive Director (312) 738-1400 ■ iBERGLUND III BEYOND BUILDING START & REFERENCE AMOUNT END DATE CONTACT Lump Sum 10/2014— Dan McGuire $6,800,000 8/2015 Events Operations (219) 462-5144, Ext. 6312 GMP 5/2014— Chris Fahey $6,600,000 5/2016 Manager of Operations & Planning (312) 738-5811 Lump Sum 2/2011 — Frank Martinelli $4,620,500 2/2012 Project Manager (262) 857-1863 CM at Risk 1 /2015 — Dan Stewart $4,620,500 7/2016 Vice President HR (773) 326-6305 CM at Risk 1/2015— Paul Harding $3,250,000 7/2016 FAIA, Architect + Founding Partner (312) 922-2600 CM at Risk 10/2015 — Joe Stahura $2,500,000 7/2016 Mayor (219) 659-7700 GMP 11/2015 — Barb Young $2,000,000 4/2016 President (219) 763-8112 NIBERGLUND BEYOND BUILDING Established 1911 berglundco.com Corporate Office 8410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E. Wacker Dr., Ste. 2450 Chicago, IL 60601 312.726.6624 Indiana Office 126 Venturi Dr. Chesterton, IN 46304 219.926.4246 City of South Bend, Indiana Contractor's Bid For Public Work JMS Facade Work — Project No. 116-048 Response to Part 11, Section I Experience Questionnaire Item 2. • Berglund Construction Company is currently working for the City of Wood Dale, IL Department of Public Works on a garage column repair project at 404 N. Wood Dale Road, Wood Dale, IL 60191. • Currently, Berglund Construction is the Construction Manager for the Hall of Fame Mascot Museum for the City of Whiting, Indiana. • For additional information, we have attached our Current Workload listing of larger projects. WORKLOAD CONTRACT PERCENT COMPLETION ARCHITECT AMOUNT COMPLETE DATE LCM Architects $70,000,000 5% 2018 WissJanney Elstner $23,000,000 0% 2017 Associates Perkins Eastman $21,500,000 50% 2017 RATIO Architects, Inc. $20,500,000 10% 2017 Perkins Eastman $20,000,000 5% 2017 Harboe Architects $19,500,000 75% 2017 Booth Hansen $18,000,000 5% 2017 Design Organization $18,000,000 0% 2017 Harley Ellis Devereaux $14,400,000 0% 2017 Arcon Associates Inc. $12,000,000 0% 2017 CONTRACT PERCENT COMPLETION ARCHITECT AMOUNT COMPLETE DATE Gibraltar Design $11,100,000 40% 2017 Anderson Mikos $9,000,000 0% 2017 Architects SMNG-A $8,000,000 0% 2017 Vavrek Architects $7,000,000 0% 2017 Kellermeyer $3,650,000 80% 2017 GodhytHart Bauer Latoza Studios $2,275,000 90% 2017 Thorton Tomasetti $2,060,000 95% 2016 Design Organization $2,000,000 95% 2016 Wiss Janney Elstner $1,100,000 90% 2016 Associates NIBERGLUND BE Y O N D B U I L D ING Established 1911 bergiundco.com Corporate Office 8410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E. Wacker Dr., Ste. 2450 Chicago, IL 60601 312.726,6624 Indiana Office 126 Venturi Dr. Chesterton, IN 46304 219.926.4246 City of South Bend, Indiana Contractor's Bid For Public Work JMS Facade Work — Project No. 116-048 Response to Part II, Section I Experience Questionnaire Item 3. • Berglund Construction Company has never failed to complete any work awarded to our company. •iBERGLUND � BEY ON D B U I L D ING Established 1911 berglundco.com Corporate Office 8410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E. Wacker Dr., Ste. 2450 Chicago, IL 60601 312.726.6624 Indiana Office 126 Venturi Dr. Chesterton, IN 46304 219.926.4246 City of South Bend, Indiana Contractor's Bid For Public Work JMS Facade Work — Project No. 116-048 Response to Part II, Section I Experience Questionnaire Item 4. References 1P Morgan Chase City of Valparaiso, IN Gerard Pacini, Global Real Estate John Seibert, Director of Parks and Recreation 312.325.3416 219.466.0113 Art Institute of Chicago City of Whiting, IN Ron Kirkpatrick, Director of Design and Construction Joe Stahura, Mayor 312.899.7400 219.659.7700 Museum of Science and Industry Cartier Bank (Valparaiso, IN) Ed McDonald, Director of Facilities and Operations Tim Warner, Vice President 773.947.3725 219.465.1073 Shedd Aquarium INTAC IBEW Local 697 Bob Wengel, Senior Director of Facilities Ray Kasmark, Maintenance Dept. 312.692.3296 630.434.1683 University of Chicago Barry O'Ctuinn, Director of Construction 773.834.1548 Northwestern University Paul Zack, Director of Construction 847.491.5079 Lakeside Wealth Management Mark Chamberlain, CEO 219.763.8112 General Services Administration Bob Green, Director of Construction 312.636.9387 s =11 l Established 1911 berglundco.com Corporate Office 8410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E, Wacker Dr., Ste. 2450 Chicago, IL 60601 312.726.6624 Indiana Office 126 Venturi Dr. Chesterton, IN 46304 219.926.4246 City of South Bend, Indiana Contractor's Bid For Public Work JMS Facade Work — Project No. 116-048 Response to Part II, Section II Plan and Equipment Questionnaire Item 1. Plan for Proposed Work The project will be completed in 5 phases as indicated below. Berglund Construction will self -perform 100% of the work excluding the new glass/aluminum storefront which will be furnished and installed by others. Phase 1— Initial Investigation & Submittal Procedure Anticipated Start Date: February 2017 • Existing building will be surveyed and investigations performed • Analysis will be performed to sample historic mortars • Selective terra cotta units will be removed for duplication by terra cotta manufacturer • Color samples or terra cotta will be provided to owner for review and approval o Lead-time for new terra cotta is 6 — 8 months after approval • Color samples of granite will be provided to owner for review and approval • Submittals will be provided for review and approval to Owner, Architect and State of Indiana Historical Society Phase 2 — Demolition & Board Anticipated Start Date: March 2017 • Demolition of existing storefront will be performed • Weather tight board up of storefront will be performed • Demolition of existing granite at columns will be performed • Verify R.O. for new storefront Phase 3 — Material Fabrication Anticipated Start Date: March 2017 • Terra Cotta Fabrication —Anticipated 6-8 Month Duration • Granite Fabrication • Storefront Fabrication Phase 4—Granite & Terra Cotta Installation Anticipated Start Date: August / September 2017 • Install terra cotta • Install granite Phase 5—Storefront Installation Anticipated Start Date: September 2017 • Install storefront Estimated Project Completion: October / November 2017* *Lump sum bid amount takes into consideration specified liquidated damages. NIBERGLUND IIIBEYON D B U I L D ING Established 1911 berglundco.com Corporate Office 8410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E. Wacker Dr., Ste. 2450 Chicago, IL 60601 312.726.6624 Indiana Office 126 Venturi Dr. Chesterton, IN 46304 219.926.4246 City of South Bend, Indiana Contractor's Bid For Public Work 1MS Facade Work — Project No. 116-048 Response to Part II, Section II Plan and Equipment Questionnaire Item 2. Berglund Construction subcontractors used on public works projects: Block Electric Company, Inc. Electrical 815.744.2000 F. J. Kerrigan Plumbing Co., Inc. Plumbing 847.251.2695 Corsetti Structural Steel Steel 815.726.4083 Mechanical Concepts Plumbing 219.938.1941 State Line Fire Systems, Inc. Fire Suppression 219.728.2997 EMCOR Hyre Electric Electrical 219.362.4814 Videotec Corp Security Electronics 219.922.4500 Acorn Fence & Construction, Inc. Fencing 219.844.8400 Anagnos Door Company Coiling Doors & Grilles 708.728.9000 Colvin Masonry, Inc. Masonry 219.558.2170 Hook's Concrete & Construction Co., Inc. Site Concrete 708.757.1690 'I BERGLUND III BE YON D BU IL DIN G Established 1911 berglundco.com Corporate Office 8410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E. Wacker Dr., Ste. 2450 Chicago, IL 60601 312.726.6624 Indiana Office 126 Venturi Dr. Chesterton, IN 46304 219.926.4246 Lazzaro Companies Storefront/Glazing 219.980.0860 Phillip Konrac & Sons, Inc. Millwork 574.773.3966 Prism Painting Company Painting 219.322.4800 Risch Construction Install Reinforcement 219.765.3440 St. John Plumbing, Inc. Plumbing 219.365.2095 Wilson Iron Works Structural Steel 219.663.7900 Drywall Service of Gary Inc. Carpentry 219.728.1844 Seal Tight Exteriors, Inc. Roofing 708.755.3555 A to Z Construction Layout Layout 219.663.3355 F.E. Moran, Inc. Fire Protection 219.923.2352 Adams Masonry Masonry 219.865.0075 American National Insulation Insulation 630.775.9999 EC Babilla Roofing Co. Roofing 219.884.3851 Hubinger Landscaping Landscaping 219.662.9911 R.V. Sutton, Inc. Demo 219.926.6625 Security Industries, TAG Div. Temp. Fencing 219.942.9447 NIBERGLUND BE VON D B U I L D ING Established 1911 berglundco.com Corporate Office 8410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E. Wacker Dr, Ste. 2450 Chicago, IL 60601 312.726.6624 Indiana Office 126 Venturi Dr. Chesterton, IN 46304 219.926.4246 Site Services, Inc. 219.924.9944 Trout Glass & Mirror, Inc. 219.926.6675 Upright Iron Works, Inc. 219.922.1994 Lake Shore Floor Covering Corp 219.663.0331 Air Filter Heating & Cooling, Inc. 219.887.5121 Blast -It -All, Inc. 312.391.9404 Safe Environmental Corp. 219.922.0844 Asphalt Glass & Glazing Structural Steel Flooring HVAC Shotblasting Asbestos Abatement HIBERGLUND ® BEY ON D 6 U I L D ING Established 1911 berglundco.com Corporate Office 8410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E. Wacker Dr., Ste, 2450 Chicago, IL 60601 312.726.6624 Indiana Office 126 Venturi Dr. Chesterton, IN 46304 219.926.4246 City of South Bend, Indiana Contractor's Bid For Public Work JMS Facade Work — Project No. 116-048 Response to Part II, Section II Plan and Equipment Questionnaire Item 3. Berglund Construction's subcontractors proposed for this project: Restoration Services: • RHCI LLC, dba Robert Haines Co. 2747 N. Emerson Avenue Indianapolis, IN 46218 Glass and Glazing: • J.W. Werntz & Son Inc. Werntz Supply / Werntz Glass 1002 Kerr Street South Bend, IN 46601 NIBERGLUND Y BEYOND BUILDING Established 1911 berglundco.com Corporate Office 8410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E. Wacker Dr., Ste. 2450 Chicago, IL 60601 312,726.6624 Indiana Office 126 Venturi Dr, Chesterton, IN 46304 219.926.4246 City of South Bend, Indiana Contractor's Bid For Public Work JMS Facade Work — Project No. 116-048 Response to Part II, Section 11 Plan and Equipment Questionnaire Item 4. Equipment to be used for this project: • Crane • Pipe Scaffold • Air Compressor • Hoists • Forklift • Lull • Mixer • Power Tools • Trucks ;i BERGLUND BE YON D B U I L D ING Established 1911 berglundco.com Corporate Office 8410 S. South Chicago Ave. Chicago, IL 60617 773.374.1000 Chicago Office 111 E. Wacker Dr., Ste. 2450 Chicago, IL 60601 312.726.6624 Indiana Office 126 Venturi Dr. Chesterton, IN 46304 219.926.4246 City of South Bend, Indiana Contractor's Bid For Public Work JIVIS Facade Work — Project No. 116-048 Response to Part 11, Section 11 Plan and Equipment Questionnaire Item S. Berglund Construction Company has not entered into contracts or received offers for all materials which substantiate the prices used in preparing our proposal.