Loading...
HomeMy WebLinkAboutChange Order No. 7 - SB One Way to Two Way Conversion Proj No 116-001A - Rieth Riley Construction Co., Inc.1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS December 13, 2016 John Yadon Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 RE: Change Order No. 7 - South Bend One -Way to Two -Way Conversion Project No. 116-001 A Dear Mr. Yadon: PHONE 574/235-9251 FAX 574/235-9171 The Board of Public Works, at its meeting held on December 13, 2016, approved the above referenced Change Order for an increase of $33,116.33, bringing the current contract amount to $3,469,972.80. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure c: Toy Villa, Engineering Michael Divita, Community Investment Beth Leonard, Community Investment Judy Love, Community Investment GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU CITY OF SOUTH BEND, INDIANA o�THg DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER e' o DATE: 11/17/2016 0:00:00 PROJECT NO: 116-001 DIVA PROJECT NAME: 116-001 South Bend One-way to Two-way Conversion CONTRACT DATE: 2/26/2016 CHANGE ORDER NO: 7 SUBJECT OF CHANGE ORDER: PCR #7-Remove and Reset Pipe and Structure due to Water Main Conflict (see change order 35) Water Line relocation on Chipewa (see Change Order 36) Palmer sewer line connection (see change order 37) The original contract sum $ 3,228,358.03 Net change by previously authorized change orders $ 208,498.44 The contract sum prior to this change order $ 3,436,856.47 By this Change Order, the project amount is QX Increased Decreased $ 33,116.33 The new contract sum including this change order $ 3,469,972.80 This Change Order represents a total change of 0.96 % Total change for entire project 7.48 Original contracted completion date/time 6/1/2017 Extension of date/time by previous change orders 0 days Date/time extension by this change order 0 days New completion date/time 6/1/2017 CONTRACTOR 04h gnature ,dal -a A J, , _.1 Printed Name and Title Rieth-Riley Construction CO. INC. Company Name 25200 State Road 23 Address South Bend, Indiana, 46614 City, State, Zip RECOMMENDED FOR APPROVAL 0 CONST 1CTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date;.;�olC Gary A. i ot, President Suz ni M: ritzber Me mkkr Elizabeth A Maradik. Member Therese J. Dorau, IV4emblef 4 Jam/ am s A. Mueller, Member Change Order No. 35 One- Way to Two -Way Street Conversion Division A Project No. 116-001 OWNER: City of South Bend ENGINEER: Lochmueller Group, Inc. Myron Cohagan CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion Division A Project No. 116-001 SUBJECT: Remove and Reset Pipe & Structure due to Water Main Conflict ISSUE DATE: November 16, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. A pay item is being added to account for the work of removing and resetting structure 48 and 40 Ift of pipe, due to a conflict with an existing water main. The structure and pipe were lowered 2 feet. The following sections of the Contract Documents are revised as a result of the above changes: 1: 1. • 1. Bid/Proposal Form: Division A: Add EWA Line Item No. 247: Remove and Reset Pipe & Structure, 1 LSM @ $12,970.87/LSM for a total addition of $12,970.87. SPECIFICATIONS: None DRAWINGS: None END OF CHANGE ORDER NO. 31 Sheet 1 of 3 Project No. 116-001 Change Order No. 35 — 10/3116 �a CV GH CITY OF SOUTH BEND � INnS PROJECT NAME: One -Way to Two -Way Street Conversion — Division A PROJECT NUMBER: 116-001 Division A: Item No. Description Quantity Unit Unit Price Total Amount 247 Remove and Reset Pipe & Structure 1 LSM 12,970.87 $12,970,87 OWNER: City of South Bend Signature Date CONTRACTOR: Rieth-Riley Construction ---g-- G �� Signature /e/J -00 Date $_12, 970.87_ Sheet 2 of 3 Mr. Myron Cohagan Lochmueller Group 130 South Main St. Suite 300 South Bend, IN 46601 TH `M/LEY November 141, 2016 RE: Division A EWA 006, Remove & Reset Pipe & Structure due to Water Main Conflict As you are aware, during installation of structures 47, 48 & 51 a water main was discovered that was in conflict with the proposed elevations of the new pipe runs. We were directed to remove and reinstall the pipe and structures at a lower elevation to avoid the water main conflict. In addition all three structures required field modifications to accommodate the new pipe elevation. The following is Rieth-Riley's cost to perform this work. Division B• Item # Qty I Unit Description Unit Price Total EWA 1 LSM Remove and Reset Pipe and Structures to avoid Water Main $12,970.87 $12,970.87 _ Total: $12,970.87 Attached is all the documentation that supports this pricing. Please let me know if you have any questions or require any additional information. Respectfully, Scott Ki,rk,�c�h-i,ck, Scott Kirkpatrick Estimator/Prof ect Manager Rieth-Riley Construction 25200 S.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (574) 288-8321 • FAX: (574) 233-3464 ICA EXTRA WORK AGREEMENT CONTRACT: 116-001 PROJECT' Division A, Two -Way Streets FORCE ACCOUNT/EXTRA WORK FOR EWA 006 Remove Modify and R s t Pipe and Structures 47,48 & 51 to avoid Water Main LABOR 109.04 (a) WEEKENDING: November5.2016 Regular Overtime Doubletme TOTAL RATE EXTENSION ER 0.00 $35.00 $0.00 R, CRAFT FOREMAN ELKHARTIST JOE 0.00 $32.17 $0.00 R, CRAFT FOREMAN LAPORTE 0.00 $0.00 R, JOURNEYMAN ELKHARTIST JOE 0.00 $29.92 $0.00 REMPLOKYEEMPLOYEE R JOURNEYMAN LAPORTE 0.00 $0.00 N, ELKHARTI ST. JOSEPH 24.00 2400 $24.15 $579.6oAN, ESOP 0.00 $40.00 $0.00N, FINISHER ELKHARTIST.JOSEPH 0.00 $32.82 $0.00N, FINISHER, LAPORTE 0.00 $0.00 N, LAPORTE 0.00 $0.00 LABORER, ELKHART/ST JOSEPH 48.00 48.00 $22.62 $1.085.76 LABORER, LAPORTE 0.00 $23.62 $0.00 MECHANIC 0.00 $35.60 $0.00 OPERATOR ELKHART 0.00 $28.15 $0.00 OPERATOR LAPORTE/ST, JOSEPH 24X0 24.09 $39.85 $956.40 oA TECH 0.00 $30.001 $0.00 PROJECTSUPERINTENDENT 5.00 5.00 $50.00 $250.00 TEAfN6TER 0.00 $27.91 $0.00 TOTAL LABOR $2,871.76 H) FICA 7.65 % x LINE (1) $219.69 (2) FRINGES EMPLOYEE HOURS RATE EXTENSION INEER --- 0.00 X $12.50 _. __.._ o oo X $13.44 0.00 X _ �_$13.44 _0CD X _ $13.44 0_60 % _ $1344�= 26.00 x L_$17.00 0.00 x $15.00� 0.00 % $13.4� - SHER, CRAFT FOREMAN ELKHART SHER CRAFTFOREMAN.LAPORTE SHER JOURNEYMAN ELKHART SHER JOURNEYMAN LAPORTE_ EMAN ELKHARTI ST_JOSEPH _ EMAN ESOP _ _ EMAN FINISHER, ELKHART /ST. JOSEPH EMAN FINISHER. LAPORTE [FOR- EMAN LAPORTE ORER ELKHARTIST JOSEPH _$0.00 _ $0.00 = $0.00 $0_00 $0.00 = $408.00 _ $0.00 _ = = $0.00 _ 00 $0.00 $0.00 $0.00 0.00 % $1344_ _ 0,00 X _I $1700 0.00 x I_ _$12961 0.00 _ X_ $73.96L- 0.00X_ $16.68 _ ORER, LAPORTE HANIC = $0.00 $0.00 OPERATOR ELKHART 0.00 X $22.771 24.00 _ x $28.15 OA_0 X $12.50 OPERATOR_LAPORTEI ST. JOSEPH - - $675.66 $0.00 OA TECH _ PROJECT SUPERIMENDENT _ 5.00 _ x _ _ $12.50 0.00 x $13.44 = = $62.50 $0.00 TEAMSTER TOTAL FRINGES $1, 146.10 (3) WORKERS COMPENSATION 19_60 % X LINE (1) $562.86 (4) BODILY INJURY INSURANCE 2.10 % X LINE (1) $60.31 (6) PROPERTY DAMAGE INSURANCE 0.00 % x LINE (1) $0.00 (6) STATE UNEMPLOYMENT 4,30 % X LINE (1) $123.49 (7) FEDERAL UNEMPLOYMENT 0.80 % X LINE (1) $22.97 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE 43) $0.00 (9) TOTAL LINES 1, 9,3,4,5,6,7,8&9 $5,007.18 (10) 20 %x LINE (10) $1,001.44 (11) GRANDTOTAL LABOR LINES(10).(If) $6,008.62 (12) Page 1 of 3 INSURANCE. TAXES 109 04 WEEK ENDING: November 5, 2016 INSURANCE $0 00 (13) TAXES $0 00 (14) TOTAL: LINE (13) + (14) $0.00 (15) 10 %x LINE (15) $0.00 (16) GRAND TOTAL FOR INSURANCE, TAXES: LINE (16) + (16) $0.00(17) MATERIAL 109.04 (c WEEK ENDING: November 5, 2016 MATERIALS PURCHASED: Midwest Tile, Structure Sections $3,760.00 (m) MATERIALS MANUFACTURED $0.00 (19) TOTAL: LINE(18)+(19) $3,760.00(20) 12 %x LINE (20) $451.20 (21) GRAND TOTAL FOR MATERIALS: LINE (20)+(21) $4,211.20(22) EQUIPMENT 109.04 /dl WEEK ENDING: November 5, 2016 CONTRACTOR OWNED EQUIPMENT BULB BOOK ADJUSTED MONTHLYRATE/175 HRB BOOK BLUE BOOK OPERATING HR BLUE BOOK TOTAL cosr RER HouR HOURS EXTENSION PICK-UP TRUCK 3/4 TON $8.751 $12.48 $21.231 $0.00 PICK-UP TRUCK TON $9.891 $13.78 $21671 24.00 $568.08 FLATRACK TRUCK $16.661 $16.85 $33.51 $0.00 LOWBOY $47.631 $43.25 $90.88 MOO TILT TOP TRAILER $6.501 $2.65 $9.35 $0.00 TRI-AXLE DUMP TRUCK $38.121 $41.10 $79.22 $0.00 QUAD -AXLE DUMP TRUCK $40.591 $42.50 $83.09 1 $0.00 CX75 EXCAVATOR $45.541 $16.951 $62.49 $0.00 CX210 EXCAVATOR $73.261 $36.101 $109.36 16.001 $1,749.76 CX330 EXCAVATOR $113.851 $59.301 $173.15 $0.00 850 DOZER $53.891 $26,301 $80.19 $0.00 SKIDSTEER $26.60 $15.20 $41.80 $0.00 CAST 938 LOADER $42.56 $23.65 $66.21 $0.00 CAT 96O LOADER $56.95 $28.00 $84.95 $0.00 MAINTAINER $41.37 $20.15 $61.52 $0.00 G RADER 12 $56,03M$29.10 $82.33 $0.00 GRADER 140 $61.31 $92.11 $0.00 Dirt Roller $34.95 $57.70 Asphalt Pave $268.08 $356.53 Asphalt Distributor $34.70 $43.40 ROLLER 3-5 TON $78.59 $105.69 d$00)0) ROLLER&12 TON $93.44 $122.54 AIR COMPERSSOR $19.20 $27.32 TOTAL CONTRACTOR OWNED EQUIPMENT $2,317.84 (23) RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES) $D.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $2,317.84 (26) 12 %x LINE (26) $278.14 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $2,595.98 (28) Page 2 of 3 SUBCONTRACTORS 109.04 M WEEK ENDING: November 5, 2016 TOTAL SUBCONTRACT WEEK ENDING $0.00 (29) 10 %x LINE (30) $3,000.00 OR LESS $0.00 (31) 7 % x LINE (30) OVER $3,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $0.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) 1.1 % OF BOND RATE BASED UPON LINE (34) 10 % x LINE (35) TOTAL EXTRA WORK LINES: (34) + (35) + (36) Page 3 of 3 $12,815.80 (34) $140.97 (35) $14.10 (36) $12,970.87 (37) Change Order No. 36 One- Way to Two -Way Street Conversion Division A Project No. 116-001 OWNER: City of South Bend ENGINEER: Lochmueller Group, Inc. Myron Cohagan CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion Division A Project No. 116-001 SUBJECT: Water Line Relocation on Chippewa at Main St. ISSUE DATE: November 21, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. A pay item is being added to account for the work of relocating a 12 inch water line on Chippewa near Main St. A 12 inch water line on Chippewa running east and west had to be lowered, due to a conflict with the drainage pipe that ran from structure 63 to drainage structure 66. The water line was lowered 2 feet by using 4 ninety degree elbows and 20 feet of pipe. The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS: 1. Bid/Proposal Form: Division A: Add EWA Line Item No. 248: Relocate water line, 1 LSM @ $12,882.86/LSM for a total addition of $12,882.86. SPECIFICATIONS: None DRAWINGS: None Sheet 1 of 3 Change Order No. 36 One- Way to Two -Way Street Conversion Division A Project No. 116-001 END OF CHANGE ORDER NO. 36 Sheet 2 of 3 Project No. 116-001 Change Order No. 36 — 11/21/16 i, r4irp L CITY OF SOUTH BENDVk PROJECT NAME: One -Way to Two -Way Street Conversion —Division A PROJECT NUMBER: 116-001 Division A: Item No. Description Quantity Unit Unit Price Total Amount 248 Relocate water line 1 LSM 112,882.86 $12,882.86 OWNER: City of South Bend CONTRACTOR: Rieth-Riley Construction Signature Date Signature Pilztll Date $_12,882.86_ Sheet 3 of 3 Mr. Myron Cohagan November 21", 2016 Lochmueller Group 130 South Main St. Suite 300 South Bend, IN 46601 RE: Division A EWA 012, Water Line Relocation on Chippewa at Main St As you are aware, an existing water main was in conflict with the new storm pipe and structure at the corner of Chippewa and Main Street. We were directed to relocate the existing water main to avoid the conflict. The following is Rieth-Riley's cost to perform this additional work. Division B• Item # Qty Unit Description Unit Price Total Water Line Relocation to EWA 1 LSM Avoid Storm Sewer on $12,882.86 $12,882.86 Chippewa at Main Street Total: $12,882.86 Attached is all the documentation that supports this pricing. Please let me know if you have any questions or require any additional information. Respectfully, Scott Ki rkp& ri, Scott Kirkpatrick Estimator/Project Manager Rieth-Riley Construction 25200 S.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (S74) 288-8321 • FAX: (574) 233-3464 ICA EXTRA WORK AGREEMENT CONTRACT: 116.001 PROJECT: Division A Two -Way Stret$ FORCE ACCOUNT/EXTRA WORK FOR: EWA 012 Chippewa at Main Street Water Line Relocation LABOR 109.04 (a) WEEK ENDING: November 18, 2016 EMPLOYEE Re901ar OVMime OoublMima TOTAL j RATE I EXTENSION ENGINEER 1 0.00 1 $35.001 $0.00 FINISHER, CRAFT FOREMAN ELKHARTIST JOE 0.00 1 $32.171 $0.00 FINISHER, CRAFT FOREMAN LAPORTE 0.00 $0.00 FINISHER, JOURNEYMAN ELKHART/ST JOE 0.00 $29.92 $0.00 FINISHER, JOURNEYMAN LAPORTE 0.00 1 $0.00 FOREMAN, ELKHART/ ST. JOSEPH 0.00 $24.15 $0.00 FOREMAN, ESOP 0.00 $40.00 $0.00 FOREMAN FINISHER, ELKHART/ST. JOSEPH 2 $0.00 FOREMAN, FINISHER, LAPORTE $0.00 FOREMAN, LAPORTE $0.00 IABORER, ELKHART/BT.JO6EPH 01$T2 $0.00 $0.00MECHANIC $0.00 OPERATOR ELKHART $0.00 OPERATOR LAPORTE IST. JOSEPH 0.00 $39,85 $0.00 OA TECH 0.00 $30.001 $0.00 PROJEGTEUPERINTENOENT 0.00 1 $50.001 $0.00 TEAMSTER 0.00 1 $27.911 $0.00 TOTAL LABOR $0.00 (1) FICA 7.65 % x LINE (1) $0.00 (2) BINGES EMPLOYEE HOURS I I RATE I EXTENSION ENGINEER 000 X $12.50 0.00 X _ $13.44 0.00 % $1344 0A0 % $1344 00 % $1344 000 % $1700 G00 x $1500� _ 0.00 x 1 $13441 _ 0A0 % $1344 0�00 X 1 $77UD 0.00 %$i2.961= = $0.00 $0.00 $000 _.. $000 FINISHER, CRAFT FOREMAN ELKHART = FINISHER GRAFT FOREMAN LAPORTE FINISHER JOURNEYMAN ELKHART _ FINISHER JOURNEYMAN LAPORTE FOREMAN ELKHART/ST JOSEPH FOREMAN ESOP FOREMAN FI NISHER. ELKHART/ST.JOSEPH FOREMAN FINISHER, LAPORTE FOREMAN LAPORTE _ LABORER, ELKHART/ST. JOSEPH i -� $000 $000 $000 $0.00 $0.00 $0.00 $0.00 = = = LABORER, LAPORTE _ _ 000 % $13.96 = $0.00 _ MECHANIC _ RATOR ELKHART _. p.00 _ % _ coo $16.68 = $0.00 $0.00 LAPORTEIST. JOSEPH _ _X _ 0.00 % _$22.71 $28.15 = FORERATOR ECH _ 0.00 X 1 $12.50 - _$0.00 $0.00 JECT SUPERINTENDENT 0.00_X ' $12.50 _ $0.00MSTER 0.00 X $13.44 - $0.00 TOTAL FRINGES _ $0.00 (3) WORKERS COMPENSATION 19.60 % % LINE (1) $0.00 (4) BODILY INJURY INSURANCE 2.10 % X UNE(1) $0.00 (5) PROPERTY DAMAGE INSURANCE 0.00 % X LINE (1) $0.00 (6) STATE UNEMPLOYMENT 4.30 % x LINE (1) $0.00 (7) FEDERAL UNEMPLOYMENT 0,80 % x LINE (1) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE(NOTE#3) $0.00 (9) TOTAL LINES 1, 2, 3, 4, 5, 6, 7, B 8 9 $0.00 (10) 20 %x LINE (10) $0.00 (11) GRAND TOTAL LABOR LINES (10) ♦ (11) $0.00 (12) Page 1 of 3 INSURANCE. TAXES 109.04 WEEK ENDING: November 18, 2016 INSURANCE $0 00 (13) TAXES $0 00 (i4) TOTAL: LINE (13) + (14) $0.00 (15) 10 % x LINE (15) $0.00 (16) GRAND TOTAL FOR INSURANCE, TAXES: LINE (15)+(15) $0.00 (17) MATERIAL 109.04 (c) WEEK ENDING: November 18, 2016 MATERIALS PURCHASED: $0.00 (18) MATERIALS MANUFACTURED $0.00 (19) TOTAL: LINE(18)+(19) $0.00(20) 12 %x LINE (20) $0.00 (21) GRAND TOTAL FOR MATERIALS'. LINE (20) + (21) _ $0.00(22) EQUIPMENT 109.04 /d WEEK ENDING: November 18, 2016 CONTRACTOR OWNED EQUIPMENT BLUE BOOK AOJUSTEO MONTHLY RATE rne Hfl5 BLUE BOOK OPERATING RATE r HR BLUE BOOKTOTAL COST PER HOUR HOURS EXTENSION PICK-UP TRUCK 3/4 TON $&751 $12.48 $21.231 $0.00 PICK-UP TRUCK 1 TON $9.891 $13.78 $23.671 $0.00 FLATRACK TRUCK $16.661 $16.85 $33.511 $0.00 LOWBOY $47.631 $43.25 $90.881 $0.00 TILT TOP TRAILER $6.501 $2.85 $9.351 $0.00 TRI-AXLE DUMP TRUCK $38.121 $41.10 $79.221 $0.00 QUAD -AXLE DUMP TRUCK 1 $40.591 $42.501 $83.091 $D.00 CX75 EXCAVATOR $45.54 $16.961 $62.491 $0.00 CX210 EXCAVATOR $73.26 $36.101 $109.361 $0.00 CX330 EXCAVATOR $113.851 $5R.301 $173.151 $0.00 850 DOZER $53.891 $26.301 $80.19 $D.OD SKIDSTEER $26.601 $16.201 $41.801 1 $0.00 CAST 938 LOADER $42.561 $23.65 $66.21 $0.00 CAT 950 LOADER $56.95 $28.00 $84.95 $0.00 MAINTAINER $41.371 $20.151 $61.521 11 $D.00 GRADER12 $65.03 $27.301 $82.33 1 $0.00 GRADER 140 $61.31 $30.80 $92.11 $0.00 Din Roller $34.95 $22.75 $57.70 Asphalt Pave $268.08 $88.45 $356.53 Asphalt Distributor $34.70 $8.70 $43.40 $0.00 ROLLER 3-5 TON $78.59 $27.10 $105.69 $0.00 ROLLER 8-12 TON $93.44 $29.10 $122.64 $0.00 AIR COMPERSSOR $19.20 $8.12 $27,32 $0.00 T07AL CONTRACTOR OWNED EQUIPMENT $0.00 (23) RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES) $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $0.00 (26) 12 % x LINE (26) $0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 (28) Page 2 of 3 SUBCONTRACTORS 109.04 (fl WEEK ENDING: November 18, 2016 Indiana Earth Water Line Reroute at Chippewa 1 $11.812.001 TOTAL SUBCONTRACT WEEK ENDING $11,812.00 (29) 10 %. x LINE (30) $3,000.00 OR LESS $300.00 (31) 7 %x LINE (30) OVER $3,000.00 $616.84 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+ (31)+(32) $12,728.84 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) 1.1 % OF BOND RATE BASED UPON LINE (34) 10 % x LINE (35) TOTAL EXTRA WORK LINES: (34) + (35) + (36) Page 3 of 3 $12,728.84 (34) $140.02 (35) $14.00 (36) $12,882.86 (37) E . .. Indiana Earth, Inc. 10343 McKinley Highway '= Osceola, IN 46561 SILL TO: Rieth Riley Construction 25200 State Road 23 South Bend, IN 46614 SB 2 Way Div A 8119/16 & 9/22/16 Water line reroute on Chippewa. Quoted for 1 day, ran into valve/line leaking and would not shut off delaying crew to cut line and do the work until Monday. Laborer went to get water pump to set up for dewatering and later had vac trailer come to site for exposing Iine and get the water out of the trench. Discussed the added expenses. Quote for 1 day and pipe materials Water pump for 3 hours Vac trailer 4.5 hrs Added time to complete the work. Rolled into a fall second day for crew to complete. 574-674-6488 574.674-6480 earth92inc@sbcgloba1xa 10/25/2016 8706 7,012.00 M0.00 630.00 3,870.00 7,012.00 300.00 630.00 3,870.00 $11,812.00 Change Order No. 37 One- Way to Two -Way Street Conversion Division A Project No. 116-001 OWNER: City of South Bend ENGINEER: Lochmueller Group, Inc. Myron Cohagan CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion Division A Project No. 116-001 SUBJECT: Palmer Sewer Line Connection. ISSUE DATE: November 22, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. A pay item is being added to account for the work of reconnecting the Palmer Funeral Home sewer line. While installing the new storm sewer line Structures 77 and structure 42 were eliminated. Unbeknownst to the designer the Palmer sewer line was blind taped into the pipe that ran between structures 77 and 42. A new line was then connected to the city sewer. The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS: 1. Bid/Proposal Form: Division A: Add EWA Line Item No. 249: Sewer Line Connection, 1 LSM @ $7,262.60/LSM for a total addition of $7,262.60, SPECIFICATIONS: None DRAWINGS: None Sheet 1 of 3 Change Order No. 37 One- Way to Two -Way Street Conversion Division A Project No. 116-001 END OF CHANGE ORDER NO. 37 Sheet 2 of 3 Project No. 116-001 Change Order No. 37— 11122/16 YS11 Ex,, O r CITY OF SOUTH BEND 'IL y 1NG5 PROJECT NAME: One -Way to Two -Way Street Conversion —Division A PROJECT NUMBER: 116-001 Division A: Item No. Description Quantity Unit Unit Price Total Amount 249 Sewer Line Connection 1 LSM $7,262.60 $7,262.60 OWNER: City of South Bend Signature Date CONTRACTOR: Rieth-Riley Construction "?, /Z Signature Date $_7,262.60_ Sheet 3 of 3 Mr. Myron Cohagan Lochmueller Group 130 South Main St. Suite 300 South Bend, IN 46601 RE: Division A EWA 013, Palmer Sewer Line Connection November 21 ", 2016 Per your request, the following is Rieth-Riley's cost to hydro excavate and tie in the Palmer Funeral Home storm sewer. Division B: Item # Qty Unit Description Unit Price Total EWA 1 LSM Palmer Funeral Home Sewer $7,262.60 $7,262.60 Connection Total: $7,262.60 Attached is all the documentation that supports this pricing. Please let me know if you have any questions or require any additional information. Respectfully, Scott- Kixk,�wh-i.ck� Scott Kirkpatrick Estimator/Project Manager Rieth-Riley Construction 25200 S.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (574) 288-8321 • FAX: (574) 233-3464 ICA EXTRA WORK AGREEMENT CONTRACT: 116-001 PROJECT: Division A, Two -Way Streets FORCE ACCOUNT/EXTRA WORK FOR: EWA 013 Palmer Sewer Tie -In LABOR 109.04 (a) WEEKENDING: November 162016 MPLOYEE Regular TOTAL RATE EXTENSION INEER 0.00 $35.00 $0.00 SHER, CRAFT FOREMAN ELKHARTIST JOE0.00 $32.17 $0.00 SHER, CRAFT FOREMAN LAPORTE 0.00 $0.00 HER, JOURNEYMAN ELKHARTIST JOE 0.00 $29.92 $0.00 SHER, JOURNEYMAN LAPORTE 0.00 $0.00 EMAN, ELKHARTI ST. JOSEPH 8.00 12.50 $24.15 $356.21 EMAN, ESOP 0.00 $40.00 $0.00 EMAN, FINISHER, ELKHART/ST. JOSEPH 0.00 $32.82 EMAN, FINISHER, LAPORTE FrEAMSTER IDoublelme 0.00 $0.00 EMAN, LAPORTE 0.00 $0.00 RER, ELKHART/ST. JOSEPH 8.00 12.50 $22.62 $333.65RER, LAPORTE 0.00 $23.62 $000 HANIC 0.00 $35.60 $0.00 RATOR ELKHART 000 $2915 $0.00 RATOR LAPORTE I ST. JOSEPH moo 12.50 $39.85 $587.79 ECH 0.00 $30.00 $0.00 ECT SUPERINTENDENT 0.00 $50.00 $0.00 STER 0.00 1 $27.911 $0.00 TOTAL LABOR $1,277.65 (1) FICA 7.65 %x LINE (1) $97.74 (2) FRINGES EMPLOYEE HOURS I RATE I EXTENSION ENGINEER _ FINISHER CRAFT FOREMAN ELKHART 0.00 x _ $12.50 1 $1344 $1344� IF- $13441 _$1344� $1700T-.$212.50 $15.00� $13.441 __ $13.44t I $1700 = $0.00 0,00 x 000 %� 000 X 0.00 % 12,60 x 0,00 x 0,00 X x _ $0.00 FINISHER CRAFT FOREMAN LAPORTE $0.00 FINISHER JOl1RNEYMANELKHART $0.00 FINISHER JOURNEYMAN LAPORTE $D.Og FOREMAN ELKHARTI ST. JOSEPH FOREMAN ESOP _ FOREMAN FINISHER ELKHARTIST JOSEPH __- _ FOREMAN LAPORTE FOREMAN LAPORTE _ _ _. _ LABORER, ELKHART/ST. JOSEPH _ = = $0.00 $0.00 I $0.00 11 $0.00 $0.00 _0__00 0.00 0.00 X 0.00_ X$1296 _ LABORER, LAPORTE 0.00 _ X I $13_96 ___ = _ MECHANIC 0.00 x $16.68 = _$0.00 $0.00 OPERATOR ELKHART 0.00 x $22_71 = $0.00 OPERATOR LAPORTE I ST. JOSEPH _ _i 12.50_ x $2_8.15 - $351.88 _ OA TECH 0.00 �X ^$12.50 = $0.00 __ PROJECT SUPERINTENDENT 0.00-__x-$12.50 - $0.00 TEAMSTER 0.00 x $13.44 - $0.00 TOTAL FRINGES _ $564.38 (3) WORKERS COMPENSATION 19.60 % x LINE 11) $250.42 (4) BODILY INJURY INSURANCE 2.10 % x LINE (1) $26.83 (5) PROPERTY DAMAGE INSURANCE 0.00 % x LINE (1) $0.00 (6) STATE UNEMPLOYMENT 4.30 % x LINE 0) $54.94 (➢) FEDERAL UNEMPLOYMENT 0.80 % x LINE (1) $10.22 (6) TRAVEL ALLOWANCE OR SUBSISTENCE(NOTE M3) $0.00 (9) TOTAL LINES 1, 2, 3, 4, 5, 6, ], 8 8 9 $2,282.17 (10) 20%x LINE(10) $456.43 (11) GRAND TOTAL LABOR LINES (10) ♦ (11) $2,738.60 (12) Page 1 of 3 INSURANCE. TAXES 109.04 WEEK ENDING: November 18, 2016 INSURANCE TAXES TOTAL'. LINE (13) + (14) $0.00 (15) 10 %x LINE (15) $0.00 06) GRAND TOTAL FOR INSURANCE, TAXES: LINE (15) + (16) $0.00 (17) MATERIAL 109.04 /d WEEK ENDING: November 18, 2016 MATERIALS PURCHASED: (10' Pipe, 21T k8 Gravel, 2Cyd Class A) $768.00 (18) MATERIALS MANUFACTURED $0.00 (19) TOTAL: LINE(1B)+(19) $768.00(20) 12 %x LINE (20) $92.16 (21) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) $860.16(22) EQUIPMENT 109.04 /d) WEEK ENDING: November 18, 2016 CONTRACTOR OWNED EQUIPMENT BLUE BOOK ADJUSTED MONTHLY RATE HTB WE BLUE BOOK OPERATING RATE -Ha BLUE BOOK TOTAL COST E BOOK HOUR HOURS EXTENSION PICK-UP TRUCK 3/4 TON $8.751 $12.481 $21.231 1 $0.00 PICK-UP TRUCK TON $9.891 $13.781 $23,671 12.501 $295.88 FLATRACK TRUCK $113.661 $15.851 $33.511 1 $0.00 LOWBOY $47.631 $43.251 $90.881 1 $0.00 TILT TOP TRAILER $6.501 $2.85 $9.351 $0.00 TRI-AXLE DUMP TRUCK $38.121 $41.101 $79.221 $0.00 QUAD -AXLE DUMP TRUCK $40.591 $42.50 $83.09 $0.00 CX76 EXCAVATOR $46.541 $16.951 $62.491 10.50 $666.15 CX210 EXCAVATOR $73.261 $36.10 $109.361 $0.00 CX330 EXCAVATOR $113.851 $59,301 $173,151 $0.00 850 DOZER $53.891 $26.3DI $80.191 $0.00 SKIDSTEER $26.601 $15.201 $41.801 $0.00 CAST 938 LOADER $42.5BI $23.651 $66.21 $0.00 CAT 950 LOADER $56.95 $28.001 $84.951 1 $0.00 MAINTAINER $41.37 $20.151 $61.521 1 $0.00 GRADER 12 $55.03 $27.30 $82.331 $D.00 GRADER 140 $61.31 $30.80 $9111 $0.00 Dirt Roller $34.95 $22.75 $57.70 $0.00 Asphalt Pave $268.08 $88.45 $356.53 $0.00 Asphalt Distributor $34.70 $8.70 $43.40 $0.00 ROLLER 3-5 TON $78.59 $27A0 $105.69 $0.00 ROLLER 8-12 TON $93.44 $29.10 $122.54 $0.00 AIR COMPERSSOR $19.20 $8.72 $27.32 $0.00 TOTAL CONTRACTOR OWNED EQUIPMENT $952.02 (23) RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES) $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23)+(24)+(25) $952.02 (26) 12 % x LINE (26) $114.24 (27) GRAND TOTAL FOR EQUIPMENT: LINES (28)+(27) $1,066.26 (28) Page 2 of 3 SUBCONTRACTORS 109.04 (fl WEEK ENDING: November 18, 2016 AMOUNT TOTAL SUBCONTRACT WEEK ENDING $2,282.50 (29) 10 %x LINE (30) $3,000.00 OR LESS $228.25 (31) 7 %x LINE (30) OVER $3,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+ (31) + (32) $2,510.75 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17). (22), (28) & (33) 1.1 % OF BOND RATE BASED UPON LINE (34) 10 % x LINE (35) TOTAL EXTRA WORK LINES: (34) + (35) + (36) Page 3 of 3 $7,175.77 (34) $78.93 (35) $7.89 (36) $7,262.60 (37) REMIT TO: Badger Daylighting Corp 75 Remittance Drive Suite 3185 Chicago, IL 60675-3185 Phone: (877) 322-3437 Fax: (877) 741-3134 RIETH-REILY CONSTRUCTION CO. INC. 25200 SR 23 SOUTH BEND, IN, 46614 RRC006 NORTHERN INDIANA CORP INVOICE INVOICE NUMBER: AR00120006 INVOICE DATE: 1111112016 Page 1 of 1 Chippewa Ave. and Michigan St., South Bend Chippewa Ave. and Michigan St. South Bend Work Order #1 Job # 3610569 cost code 41910 Cust. Rep Eric Dhoore Cust. Rep# 219-380-6986 3610569 Chippewa Ave. and Michigan St., South Bend NET 30 DAYS FROM INVOICE DATE 12/11/2016 Ticket Date Ticket # Unit # Item Description Qty Una or Unit Price Amount Measure 11/092016 TKT00361292 1265 MOBILIZATION/DEMOBILIZATION 0.50 Hours 175.00 87.50 11/09/2016 TKT00361292 1265 HYDROVAC W/-1 MAN CREW - HOURLY -01 STANDARD RATE 8.00 Hours 240.00 1,920.00 111092016 TKT00361292 1265 HYDROVAC W/1 MAN CREW - HOURLY -02 OVERTIME RATE 1.00 Hours 275.00 275.00 Subtotal 2,282.50 Sales Tax 0.00 TOTAL DUE $2,282.50 Payment terms are Net 30 days. Any unpaid balances are subject to: a 10% late fee, maximum interest Ver 2.0.0 allowed by law, collection fees, and any and all court costs and legal fees. Printed : 11/272016 TKT00361292 Billed To: RIETWREILY CONSTRUCTION CO. INC. 25200 SR 23 SOUTH BEND IN 46614 Operator(s) MORAN ERIC Job Location Chippewa Ave. and Michigan St., South Bend Company: Badger Daylighting Corp Select Truck Job Name/#: Chippewa Ave. and Michigan St., South Bend - Hyd Area NORTHERN INDIANA CORP Ticket Items Badger Daylighting Corp 75 Remittance Drive Suite 3185 Chicago, Illinois, United States, 60675-3185 Ph: (877) 3BADGER Fax: (877) 741-3134 Emait AR Dept Job Number J00232602 Ticket Date: 11/09/2016 Paper Ticket #: 392627 PO: 3610569 Project Name/AFE: Customer Rep: Eric Dhoore Customer Rep #: 219-380-6986 Industry Item Unit # / Personnel Quantity U of M Rate Amount HYDROVAC W/ 1 MAN CREW - HOURLY - 01 1265, HYDROVAC 8.00 HR 240.00 1,920.00 STANDARD RATE HYDROVAC W/ 1 MAN CREW - HOURLY - 02 1265, HYDROVAC 1.00 HR 275.00 275.00 OVERTIME RATE MOBILIZATION / DEMOBILIZATION 1265, HYDROVAC 0.50 HR 175.00 87.50 TIME-01-OPERATOR 1-DAY SHIFT Approved By: Work Order #1 Job # 3610569 cost code 41910 Ticket Notes MORAN, ERIC 0.00 HR 0.00 0.00 Total $2,282.50 Taxes included if applicable. Job Description Intersection of Michigan St and Chippawa St South Bend IN 11/09/2016 Unload at Reith & Riley site on St Rd 23 Work Description Cut trench for new drainage tile expose gas main and fiber and electrical service lines 11/09/2016 Spire Wireless Field Ticketing Visit us at w .spiradata.com Ver 1.9.0 Page 1 of 1 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 12/01/16 Name Toy Villa ✓ Department Engineering BPW Date 12/13/16 Phone Extension 5920 Required Prior to Submittal to Board Legal ® Attorney Name Michael Schmidt Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ® Change Order No. 7 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control ❑ Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Required Information ith Riley Construction Co., Inc. Yes ® No ❑ If Yes, Ap MBE ❑ WBE LJ No U Yes Name of Company South Bend One Way to Two Way Conversion — Division A 116-001 SSDA TIF 430.1050.460.31.36 Approval of Change Order #7 ❑ Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verifv. Iran. etc. Required For Change Orders Only 33ount of ® Increase $ 33,116.33 ❑ Decrease $ Previous Amount $ 3,436,856.47 Current Percent of Change: 0.96% New Amount $ 3,469,972.80 Total Percent of Change: 7.48% Copy Original ® ❑ ® ❑ Michael Divita Tov Villa Dispersal After Approval Love BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 12/01/16 Name Toy Villa dam( Department Engineering BPW Date 12/13/16 Phone Extension 5920 Required Prior to Submittal to Board Legal ® Attorney Name Michael Schmidt Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ® Change Order No. 10 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control ❑ Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Reith Riley Construction Co. Inc. ❑ Yes ® No ❑ If Yes, Approved by Purchasing I -I MBE n WBE LJ No ❑ Yes Name of Company South Bend One Way to Two Way Conversion — Division B 116-001 2015 TIF Bond Approval of Change Order #10 ❑ Required Contractor's Certification Form Attached (Non - Collusion Non -Discrimination Non -Debarment E-Verify, Iran etc.) Required For Change Orders Only Amount of ® Increase $ 198,786.95 ❑ Decrease $ Previous Amount $ 17,306,460.73 Current Percent of Change: 1.15% New Amount $ 17,505,247.68 Total Percent of Change: 8.51 % Dispersal After Approval Copy Original ® ❑ Michael Divita ® ❑ Toy Villa 2 ❑ Beth Leonard, Judy Love