Loading...
HomeMy WebLinkAboutChange Order No. 1 - Ireland Road Storm Repairs Proj No 116-083G - Walsh & Kelly, Inc.1316 Coun rY-CITv BUILDINa 227 W. JEFFERsON BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS December 13, 2016 Dustin Hilary Walsh & Kelly, Inc. 24358 State Road 23 South Bend, IN 46614 RE: Change Order No. 1 - Ireland Road Storm Repairs Project No. I I6-083G Dear Mr. Hilary: PHONE 574/235-9251 FAX 574/235-9171 The Board of Public Works, at its meeting held on December 13, 2016, approved the above referenced Change Order for an increase of $7,479.85, bringing the current contract amount to $92,258.25. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, 9 Linda M. Martin, Clerk Enclosure c: Toy Villa, Engineering Roger Nawrot, Engineering GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 11 /16/2016 116-083G Ireland Road Storm Repairs 10/25/2016 PCR #1-Install Catch Basin PCR #2-Remove Line Items The original contract sum $ 84,778.40 Net change by previously authorized change orders $ 0.00 The contract sum prior to this change order $ 84,778.40 By this Change Order, the project amount is Q Increased The new contract sum including this change order This Change Order represents a total change of Total change for entire project Decreased $ 7,479.85 $ 92,258.25 8.82 % 8.82 % Original contracted completion date/time 4/28/2017 Extension of date/time by previous change orders 0 days Date/time extension by this change order 0 days New compPe-�6n dat�,/fime 4/28/2017 bNTRACTOR RECOMMENDED FOR APPROVAL % ontrabtor Signature CONST TION MANAGER SUS 'Tz o 14 / t A f 2 ,r,�,,4 6?('� Printed Name and Title e _Walsh Kelly Inc. Company Name 24358 State Road 23 Address South Bend, IN 46614 City, State, Zip CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: —) 0/6, Gary A; Gilot, President uicauem I-X. MaraalK, iviemper Therese J. Dorreu, Member Jam s A. Mueller, Member City of South Bend Project No. 116-083G Change Order No. 1 - 1218/16 OWNER: City of South Bend ENGINEER: City of South Bend Engineering Roger T. Nawrot, P.E. Professional Engineer No. 60016991 CONTRACTOR: Walsh & Kelly, Inc. PROJECT: Ireland Road Storm Repairs Project No. 116-083G SUBJECT: Change Order Explanation ISSUE DATE: December 8, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: Item Qty Unit Price Total 1. Install Catch Basin 1 LS $15,750.00 $15,750.00 2. Remove Line Items N/A N/A ($8,270.15) ($8,270.15) 1. Install Catch Basin A catch basin is needed to incorporate an existing storm pipe running through the Erskine golf course. Work will include rolling up a large portion of the erosion control mat (Flexamat), excavation around the existing storm pipe, saddling a structure around the pipe, backfilling, and fine grading the finished product. Additional Flexamat anchors will be ordered and installed to secure the mat. 2. Remove Line Items Some line items were not needed. They were included as an "as needed' item. The current work has found that they are not necessary. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 12/01/16 Name Toy Villa Department Engineering BPW Date 12/13/16 Phone Extension 5920 Prior to Submittal to Legal ❑ Attorney Name Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ ❑ Check the Appropriate Item Type —Required for All Submissions Agreement ❑ Contract ❑ Proposal ❑ Professional Services ❑ Resolution P Addendum ❑ ❑ Bid Opening ❑ Bid Award Quote O enin ElReq, to Advertise ❑Title Sheet P 9 ❑Quote Award ® Change Order No. 1 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control ❑ Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Required In Walsh & Kelly, Inc. ❑ Yes ®No ❑ MBE ❑WBE No I I Yes of Com ❑ Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) I Required For Change Orders Only Amount of ® Increase $ 7,479.85 Previous Amount Current Percent of Change: New Amount Total Percent of Change: Copy Original ❑ ❑ v� Dispersal After Approval Roger Nawrot Tov Villa