REGULAR MEETING MARCH 17, 1975
A regular meeting of the Board of Public Works was convened at
9:30 a.m, on Monday, March 17 with Mr. Farrand and Mr. Barcome
present. Minutes of the previous meeting were reviewed and approved.
OPENING OF BIDS SALE OF OLD FIRE STATION NO. 4
This was the date set for receiving bids for the sale of old
Fire Station #4. The Clerk tendered proofs of publication.of
notice in the South Bend Tribune and the Tri-County News which
were found to be sufficient. There were no bids received.
OPENING OF BIDS - BUREAU OF STREETS MATERIALS
This was the date set for receiving bids for materials for the
Bureau of Streets for 1975. The Clerk tendered proofs of publication
of notice in the South Bend Tribune and the Tri-County News which
were found to be sufficient.
The following bids were opened and publicly read:
Westville Oil Company Bid was signed by Andrew Carson,
Westville, Indiana non -collusion affidavit was in
order and a 10% bid bond accompanied
the bid.
Bid - 175,000 gals road oil $0.129 per gal. $22,575.00
Eckler-Lahey Lumber CompanyC22pany Bid was signed by James Lahey,
South Ben- , Indiana non -collusion affidavit was in
order and a certified check in the
amount of $375.30 accompanied the bid.
3000 Bags Portland Cement - $2.07 each - $6210.00
Walsh & Kelly, Inc. Bid was signed by David Goodwin,
South Bend, Indiana non -collusion affidavit was in
order and a 10% bid bond accompanied
the bid.
20,000 Tons HAC Surface -Stone - $12.55 per unit - $251,000.00
10,000 Tons HAC Surface - Slag- $13.40 per unit - $134,000.00
20,000 Tons HAC Binder, #8 or #9 - $10.00 per unit - $200,000.00
2,500 Tons HAC Binder #11 - $11.25 per unit - $28,125.00
5,000 Tons HAE SAND SURFACE -IV - $16.50 per unit - $82,500.00
5,000 Tons HAC Sand Surface -IV - $13.00 per unit - $65,000.00
51*000 Tons HAE Slag Surface Spec - $18.00 per unit = $90,000.00
5,000 Tons HAC Slag Surface Spec - $14.55 per unit - $72,750.00
150 Tons Bit. Material Tack - $135.00 per unit - $20,250.00
1,000 Tons Bit. Patching Material - $14.40 per unit - $14,400.00
South Bend Sand and Gravel Bid was signed by C. R. Bratina,
South Bend, Indiana non -collusion affidavit was in
order and a 10% bid bond accompanied
the bid.
2,000 Tons C Fine Aggregate - $1.20 per unit - $2400.00
Hass Concrete, Products Bid was signed by Joseph Wagner,
South Bend, Indiana non -collusion affidavit was in
order and a certified check in the
amount of $1912.50 accompanied the
bid.
600 C. Y. Ready Mix Concrete - $25.90 per unit - $15,540.00
150 C. Y. Ready Mix Concrete - $23.90 per unit - $3,585.00
1
REGULAR MEETING MARCH 17, 1975
Kuert Concrete Inc. Bid ;was signed by C. R. Bratina
South Bend, Indiana non -collusion affidavit was in
order and a 10;10 bid bond accompanied
the bid.
600 Yds. Class A Limestone Concrete - $26.40 per unit - $15,840.00
600 Yds. Class A Slag Concrete $25.90 per unit - $15,540.00
150 Yds.,Class B Limestone Concrete - $23.40 per unit $3,660.00
150 Yds. Class B Slag Concrete - $23.90 per unit- $3,585.00
To add 2% calcium chloride solution $.65 per yd.
Rose Fuel & Materials Inc. Bid was signed by Paul M. Lehner,
South Bend, In iana Jr., non -collusion affidavit was
in order and a certified check in
the amount of $825.00 accompanied
the bid.
3,000 Bags Portland Cement - $2.75 per unit $8,250.00.
Wanatah Trucking Co., Inc. Bid was signed by Roger A. Hutton,
South Bend, Indiana non -collusion affidavit was in
order and a 10% bid bond accomanied
Oa the bid.
CL7 10,000 Tons Min. Aggregate #2 Stone - $4.65 per unit - $45,600.00
Western Materials Co. Bid was signed by Glenn A. Remaly
South Bend, Indiana non -collusion affidavit was in
order and a 10% bid bond
accompanied the bid.
10,000 Tons Min.• Aggregate #2 Stone - $5.95 per unit - $59,500.00
5,000 Tons C. Aggregate #73 - $1.50 per unit - $7,500.00
8,000 Tons Course Aggregate #9 Spec. - $1.85 per unit - $14,800.00
2,000 Tons Fine Aggregate #14-1 or 14-2 - $1.10 per unit - $2,200.00
The Levy Company,Inc. Bid was signed by Russell A. Reed,
Chesterton, Indiana non -collusion affidavit was in order
and a 10% bid bond accompanied the bid.
2,000 Tons Min. Aggregate -Slag - $3.95 per unit - $7,900.00
5,000 Tons C Aggregate #73 - $1.50 per unit - $7,500.00
8,000 Tons Course Aggregate #9 Spec. - $2.03 per unit - $16,240.00
2,000 Tons Fine Aggregate $14-1 or 14-2 - $1.20 per unit - $2,400.00
8,000 Tons Crse. Aggregate -Crusher Run - $3.50 per unit - $28,000.00
Rieth Riley Construction Co. Bid was signed by Richard D. Ruhlman,
South Bend, Indiana non -collusion affidavit was.in order
and a 10% bid bond accompanied the bid.
20,000 Tons HAC Surface Stone - $12.39 per unit - $247,800.00
10,000 Tons HAC Surface -Slag $13.23 per unit - $132,300.00
20,000 Tons HAC Binder #8 or #9 - $9.82 per unit - $196,400.00
2,500 Tons HAC Binder #11 - $11.10 per unit - $27,750.00
5,000 Tons HAE Sand Surface -IV - $16.70 per unit - $83,500.00
5,000 Tons HAC Sand Surfave IV - $12,78 per unit - $63,900.00
5,000 Tons HAE Slag Surface -Spec. - $18.25 per unit - $91,250.00
5,000 Tons HAC Slag Surface -Spec. - $14.25 per unit - $71,250.00
1,000 Tons Bit. Patching Material - $14.90 per unit - $14,900.00
Emulsified Asphalts, Inc. Bid was signed by David M. Yates,
Chicago, Illinois non -collusion affidavit was in order
and a 10% bid bond accompanied the
bid.
600,000 Gallons Emulsified Asphalt - $0.4097 per unit - $245,820.00
521
REGULAR MEETING
MARCH 17, 1975
Bitucote, Inc.
St. Louis, Missouri
Bid was signed
non -collusion
and a 10% bid
by Otto Hadley,
affidavit was in order
bond accompanied the bid.
600,000,Gallons Emulsified Asphalt - $0.4287 per unit - $257,220.00
Upon motion made, seconded and carried, the bids were referred.to
DQn.ald::Decker,, Director, Division of Transportation for review and
recommendation.
FILING OF ASSESSMENT ROLL - VACATION RESOLUTION NO. 3411, 1975
Rollin E. Farrand, P. E., City Engineer files with the Board an
Assessment Roll for Vacation Resolution No. 3411, 1975 for the vacation
of the north -south alley between Taylor and William Street running north
from Monroe Street to the first east -west alley as found on the Recorded
Plat of William E. Vail's Southwest Addition to the Town, now City of
South Bend. The following property maybe injuriously or beneficially
affected by such vacation:
Lots 5 to 8 inclusive and Lots 13 to 16 inclusive located in Part
of Vail's Southwest Addition.
The Board finds that each of said lots have been benefited in the amount
of $0.00 and damaged in the amount of $0.00.
Upon motion made, seconded and carried, the Board adopted the Assessment
Roll and set Monday, April 21, 1975 at 9:30 a.m, as the time and the
Board of Public Works Hearing Room as the place where all persons
interested in or affected by such vacation may be heard.,.
FILING OF ASSESSMENT POLL - VACATION RESOLUTION NO. 3412, 1975
Rollin E. Farrand, P. E., City Engineer, files with the Board an
Assessment Roll for Vacation Resolution No. 3412, 1975 for the
vacation of the north and south alley between Phillipa and Carlisle
Street, from Dunham Street south to the first alley south of Dunham
Street, City of South Bend. The following property may be injuriously
or -beneficially affected by such vacation: Lots 142 to 145 inclusive and
Lot 111 in Realty Construction Company's Second Addition.
The Board finds that each of said lots have been benefited in the
amount of $0.00 and damaged in the amount of $0.00.
Upon motion made, seconded and carried, the Board adopted the
Assessment Roll and set Monday, April 21, 1975 at 9:30 a.m, as the
time and the Board of Works Hearing Room as the place where all persons
interested in or affected by such vacation may be heard.
APPROVAL OF CLAIMS - CIVIC CENTER FROM SOLLITT CONSTRUCTION COMPANY
The Board received claims from the Sollitt Construction Company for
reimbursable expenses for Century Center from February 1 to February 28,
1975 in the amount of $6,204.43. The claims have been approved by
Patrick McMahon, Manager, Bureau of Public Construction and by the
Civic Center Authority. Upon motion made, seconded and carried, the
claims were approved.
CHANGE ORDER NO. 7 - PURCHASE ORDER APPROVED -FIRE STATION NO. 4
The Purchase Order covering Change Order No. 7 from the Muia Construction
Company was submitted to the Board. The Change Order was in the amount
of $1407.00 and had been approved by the Board. Upon motion made, seconded
and carried, the Purchase Order was approved_, for the Change Order No.
7 for the construction of Fire Station No. 4.
REGULAR MEETING
MARCH 17 1975
REQUEST TO INSTALL COLLECTION BOXES AT MAIN=POST OFFICE RECEIVED
The Post Office Department sent a request to the Board for
permission to install additional collection boxes for mail drops
at the Main Post Office. A sketch showing the proposed locations
was submitted. Upon motion made, seconded and carried, the request
was referred to the Bureau of Traffic and Lighting for -review and
recommendation.
REQUEST FOR ADDITIONAL PARKING AT STATE EMPLOYMENT OFFICE RECEIVED
A letter was received by the Board from Councilman Walter Kopczynski
and Councilman Walter Szymkowiak asking that the.parking problem
around the Indiana State Employment Office be investigated. Mr.
Farrand noted that this matter has been discussed by the members of
the Board and steps are being taken to eliminate the problem. Upon
motion made, seconded and carried, the letter was referred to the
Department of Public Works for investigation and report.
REQUEST TO SELL POPPIES - AMERICAN LEGION AUXILIARY UNIT 50 APPROVED
The Board received a request from the American Legion Auxiliary,.Unit
No. 50 to sell poppies on the streets on May 16 and 17, 1975. Upon
W motion made, seconded and carried, the Board approved the request and
directed that the Bureau of Traffic and Lighting and the Police
Department be advised of the approval.
APPLICATION APPROVED FOR SALE OF FLOWERS ON RIVER BEND PLAZA
The Board received an application from Inwood's Store to sell green
carnations on River Bend Plaza in connection with the St. Patrick's
Day Celebration on March 17, 1975. The application was favorably
recommended by Louis Wilcox, Director. Upon motion made, seconded
and carried, the application was approved.
TRAFFIC CONTROL DEVICES APPROVED
The Bureau of Traffic and Lighting recommended the following
installations to the Board:
A. Installation of parking meters in the 100 block East Helmen
Court. Upon motion made, seconded and carried, the request was
approved.
B. Installation of a stop sign at Helmen Court and St. Joseph Street.
Upon motion made, seconded and carried, the installation was
approved.
C. Request permission to allow two parking meters to be bagged
at 319 South Main Street during a construction period. A fee
of $5.00 per day per meter will be paid. Upon motion made,
seconded and carried, the request was approved. The estimated
construction time is three months.
BOND APPROVED
Ray S. Andrysiak, Bureau of Engineering, recommended to the Board
that the contractor's bond for Associated Concrete Company was properly
executed and could be approved. Upon motion made, seconded and
carried, the bond was approved to 3/5/76.
STREET LIGHT OUTAGE REPORT FILED
The Street Light Outage Report for the period of March 6 through March
13 was received. Upon motion made, seconded and carried, the report
was ordered filed.
REGULAR MEETING
APPROVAL OF LEASES WITH A.C.T.I.O.N., INC.
Leases with A.C.T.I.O.N., Inc
No. 7, No. 8 and No. 10 were
approved by A.C.T.I.O.N. The
Board for approval. Mr. Barc
leases with Mr. Hojnacki, Dir
Development, and they are rea
seconded and carried, the lea
TENT REQUEST APPROVED
MARCH 17, 1975
. for the use of Old Fire Station
prepared by the Legal Department and
leases are now submitted to the
ome noted that he had reviewed the
ector of Human Resources and Economic
dy for approval. Upon motion made,
ses were approved.
Forrest R. West, Building Commissioner, reported to the Board that
he had reviewed the request of the Junior League to erect a tent in
the rear of 330 West Navarre Street from May 1 through 5, 1975.
Mr. West, recommended approval, subject to a permit being secured
from the Building Department, a permit for the electrical work
being secured„from the Building Department and fire protection to
be as required by the Fire Prevention Bureau. Upon motion made,
seconded and carried, the Board approved the request subject to the
stipulations of the Bureau of Buildings and Permits.
There being no further business to come before the Board, upon
motion made, seconded and carried, the meeting adjourned at 10:00 a.m.