Loading...
HomeMy WebLinkAboutOpening of Proposals - HVAC Preventative Maintenance Plan for VPA - Ideal Consolidated, Inc.CONSOLIDATED, INC. November 22, 2016 City of South Bend Board of Public Works County City Building 227 W Jefferson Blvd, Suite 1316 South Bend, IN 46601 Re: HVAC Preventive Maintenance Plan Request for Proposal Thank you for your consideration of Ideal Consolidated as a potential partner for the HVAV Preventive Maintenance at Century Center, the Cove and Martin Luther King, Jr Recreation Center. The following information will provide you with detailed information on our Company, our capabilities and specifics that will explain why we believe we are the best partner to furnish all labor, materials and equipment to fully maintain the HVAC systems based on the specification provided. About Ideal Consolidated, Inc. Founded in 1956, Ideal Consolidated has been serving South Bend, Indiana, and the surrounding area for over 60 years. In 2010, Ideal Consolidated and its sister company, Martell Electric, were purchased by John and Bonnie Martell. Ideal is a mechanical contractor specializing in commercial, industrial and institutional piping, plumbing and sheet metal work. A unique aspect of our operation is that all project managers and estimators have extensive field training and experience, with most having completed their respective apprenticeship programs. At Ideal Consolidated, safety is our number one priority and is a major part of our culture both within the office and out in the field. We have written programs that provide a basis for our aggressive program of training, weekly safety meetings and jobsite safety audits. We have two main operating divisions — construction and service. The construction division specializes in both plan & spec and design build mechanical systems ranging from $5,000 to $5M. Our service department focuses on plumbing and HVAC service as well as predictive and preventive maintenance. 4601 CLEVELAND ROAD SOUTH BEND, IN 46628 PHONE 574-271-5000 FAX 574-271-5400 www.idealconsolidated.com MEAL CO+ UDAVKD. INC. Scope of Work As a local leader in predictive and preventive maintenance, Ideal Consolidated is prepared to furnish all labor, supervision, tools, materials and equipment necessary to fully maintain all HVAC at the facilities specified in the Request for Proposal. This work is based on the following scope. COVE - AIR HANDLING UNITS (AHU) 1. Inspect coils for blockage. 2. Inspect drain line and drain pan. 3. Lubricate fan bearings as per manufacturer's recommendations. 4. Lubricate motor bearings as per manufacturer's recommendations. 5. Check belt and sheaves. 6. Check motor mounts and vibration pads. 7. Inspect wiring and tighten electrical connections. 8. Check fan operation. 9. Lubricate and adjust dampers and linkage. 10. Check motor operating voltage and amperage. 11. Inspect air filters; change if included in agreement. 12. Check fan assembly. 13. Check and calibrate temperature controls. COVE - BOILERS 1. Check operation of flame safeguard controls. 2. Check boiler vessel visually for leaks. 3. Check blow down valve. 4. Inspect relief valve for proper rating and operation. 5. Check fuel lines for leaks. 6. Inspect wiring and tighten electrical connections. 7. Check settings and test all operating controls. 8. Check operation of low water cut-off and feed controls. 9. Check burner operation and combustion air equipment. 10. Inspect fireside of boiler. 11. Check expansion tank for proper air cushion or flooding. 12. Check boiler for proper water fill and check PRV valve (fill valve) for proper operation. IDEAL 13. Pull and clean strainer in PRV valve. COVE - CONDENSING UNIT 1. Check all compressor screws and bolts for tightness. 2. Check compressor crankcase heater. 3. Test and adjust all safety controls including high pressure, low pressure and oil pressure switches. 4. Check oil pump pressure if possible. 5. Check compressor oil level if possible. 6. Check compressor operating voltage and amperage. 7. Inspect wiring and tighten electrical connections. 8. Check all contactors and relays for wear. 9. Check refrigerant sight glass. 10. Check compressor suction and discharge pressures. 11. Check for visual indication of a refrigerant leak. 12. Check solenoids and expansion valves for proper operation. 13. Clean condenser if called for in preventative maintenance. 14. Check condenser fan blades. 15. Lubricate bearing as needed. 16. Check and adjust condenser fan belt if applicable. 17. Check condenser motor amperage and voltage. COVE - PACKAGED ROOFTOP HEATING/COOLING UNITS 1. Inspect coils for blockage and cleanliness. 2. Inspect drain line and drain pan. 3. Lubricate fan bearings as per manufacturer's recommendations. 4. Lubricate motor bearings as per manufacturer's recommendations. 5. Check belt and sheaves (if applicable). 6. Check motor mounts and vibration pads. 7. Inspect wiring and tighten electrical connections. 8. Check fan operation. 9. Lubricate and adjust dampers and linkage. 10. Check motor operating voltage and amperage. IDEAL ! ulnOLl IIATP.ft ��� 11. Inspect air filters. 12. Check fan assembly. 13. Check temperature and operating controls. 14. Check and calibrate safety controls. 15. Check unit for refrigerant leaks. 16. Check starter contacts for wear. 17. Check oil level in compressor (where applicable). 18. Check crankcase heater. 19. Check compressor operating refrigerant pressures. 20. Check compressor voltage and amperage. COVE - UNIT HEATER 1. Lubricate fan and motor bearings per manufacturer's recommendations. 2. Brush and clean fan and housing as required. 3. Inspect wiring and tighten electrical connections. 4. Check all contactors and relays for wear. 5. Check unit operation. 6. Check safety controls. 7. Brush and clean coil (water and steam units). 8. Check steam trap. 9. Check operating fan current and voltage. 10. Check entering and exiting air temperature. 11. Check entering and leaving water temperature (water units only). CENTURY CENTER - AERCO BOILERS 1. Check and record inlet gas pressure. 2. Check gas cushion diaphragm assembly for fatigue. 3. Replace gas cushion diaphragms. 4. Check settings and test all operating controls. 5. Check settings and test all safety controls. 6. Check operation of combustion prove switch. 7. Check operation of program timer. IDEALUV. 8. Check operating voltage and amperage. 9. Inspect wiring and tighten electrical connections. 10. Check all contactors and relays for wear. 11. Visually inspect pressure relief valve. 12. Check operation of blower motor. 13. Check for visual indication of waterside leaks. 14. Check operation of gas valve. 15. Replace ignition spark plug. 16. Clean condensate drain and drain connection. 17. Check fuel lines for leaks. 18. Visually inspect inlet and exhaust piping. 19. Check and adjust waterside pressures. CENTURY CENTER- CHILLERS 1. Check flow controls. 2. Lubricate circulators. 3. Check pressure controls. 4. Check temperature controls. 5. Check screws and bolts for tightness. 6. Inspect electrical connections. 7. Check all operating and safety controls. 8. Check all relays and contactors. 9. Check system suction and liquid pressures. 10. Check return and supply water temperatures. 11. Check system superheat. 12. Check sight glass level and record. 13. Check oil level. 14. Perform oil analysis if called for in preventative maintenance. 15. Check for refrigerant leaks. MARTIN LUTHER KING JR RECREATION CENTER —TRANE UNITS 1. Check and record inlet gas pressure. EQUAL cON.I.W.Tk U, INC. 2. Check gas cushion diaphragm assembly for fatigue. 3. Replace gas cushion diaphragms. 4. Check settings and test all operating controls. 5. Check settings and test all safety controls. 6. Check operation of combustion prove switch. 7. Check operation of program timer. 8. Check operating voltage and amperage. 9. Inspect wiring and tighten electrical connections. 10. Check all contactors and relays for wear. 11. Visually inspect pressure relief valve. 12. Check operation of blower motor. 13. Check for visual indication of waterside leaks. 14. Check operation of gas valve. 15. Replace ignition spark plug. 16. Clean condensate drain and drain connection. 17. Check fuel lines for leaks. 18. Visually inspect inlet and exhaust piping. 19. Check and adjust waterside pressures. Experience With over 60 years of experience in the South Bend area, Ideal Consolidated has and/or is providing HVAC maintenance services to the following partners: • AM General— Commercial Building— Maintenance of 30 Rooftop Units • Chase Plastics— Maintenance of HVAC system • City of South Bend Waste Water Treatment Plant— Various Buildings throughout Plant — Maintenance of HVAC equipment • City of South Bend Water Works —Olive St and Colfax Ave Buildings— Maintenance of HVAC equipment • Cook Nuclear Plant— Maintenance of HVAC equipment on all buildings outside of the Containment Area • MR] Centers— Maintenance of various sites for HVAC • Sonic Restaurants — Maintenance of HVAC equipment • Union North Schools — Maintenance of HVAC equipment at High School and Elementary School — Facilities include Aerco Boilers MEAL CONSULIUATIL. INC. Capabilities Many of Ideal Consolidated's key employees have been with the Company for 20 or more years. The Service Department, led by Mr. Fred Mohler, is fully capable of meeting the news of the City of South Bend outlined in this proposal. Name Position Roles and Responsibility As President John directs the strategic focus of the business and coordinates the governance of design, construction, installation, John Martell President and maintenance, operations. John is a Professional Engineer with over 30 years of Senior Executive experience. Vice President, Tim Stuver, started with Ideal in 1991 as afield foreman. His previous experience in the piping trade includes Tim Stuver Vice President completion of the Local172 Apprenticeship Program and working as a journeyman, foreman and, later, superintendent prior to becoming Vice President. Service Fred joined Ideal Consolidated in 2010. He has been in the industry Fred Mohler Manager for 42 years, 30 of which has been in the role of Service Manager. Jahn is a Certified Occupational Safety Specialist with extensive John Hewitt Safety experience in safety, occupational health, and security. He has an Manager excellent track record implementing safety programs for reducing incidents and developing a strong safety culture. Not only is our team signatory with Local 172: Plumbers & Pipefitters, but, as a Company, we are certified to work on Aerco Boilers. At present time, Ideal Consolidated has 54 employees, 6 of which are in the Service Department for HVAC. All Service Technicians are licensed plumbers with one being an apprentice. All have their Freon Certification and one is certified for Aerco Boilers. Collectively, our Service Technicians have over 100 years of experience in HVAC Service. Other certifications of our technicians include Backflow testing, Mitsubishi Start-up, Rigging and Confined Space. Cost Our pricing for the above scope of work is based on all preventive maintenance taking place during normal business hours. Price includes labor as well as basic maintenance materials including belts and filters. EDRAL co�u oe PM Time Frame Building Address Expiration Yearly Cost Quarterly Semi - Annual Annual Inspection Inspection Date Per Building Cost Inspection Cost Cost Cove 501 W South St, $ _ $ $ - 12/31/2016 $ 46601 5,250.00 10,500.00 Martin Luther King Jr 1522 W Linden, $ $ Recreation 46628 $ 400.00 $ New 800.00 Center Century Center 120 S St. Joseph $ _ $ 12/31/2016 $ St, 46601 400.00 $18,000.00 18,800.00 Labor Rate - Normal 8am-4:30pm $ $ Business Hours g4.00 30,100.00 Labor Rate - After Business After 4:30 and $ Hours Before 8am 126.00 ' Labor Rate - $ Holidays & Weekends 168.00 Trip Charge - per call -out $ While the HVAC Preventive Maintenance Plan does not require the use of a subcontractor or offer an opportunity for material to be purchased from a registered DBE/MBE/WBE at this time, Ideal Consolidated commits to purchasing all replacement equipment during the life of the contract through a registered WBE material broker. Please review this proposal at your convenience and feel free to contact myself (574-286-8200) or Fred Mohler (574-532-8990) with any questions you may have. We truly appreciate your time and consideration. Sincerely, IDEAL CONSOLIDATED, INC. John A. Martell, P.E. President When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) ) SS: St. Joseph COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to - time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). 1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide ajustification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. »ae I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this November day of 22 , 2016 Ideal Consolidated, Inc -o actorl idder (Firm) eSi nature of Contr ctorMidder or Its Agent John Martell, President Printed Name and Title Subscribed and sworn to before me this 22 day of November 12016 My Commission Expires Z 12 8I 20 -z-a Notary Public County of Residence -6z :S o 3.15 P N RENA BALDWIN • � PJofary _ .itate of Indian* F,nhc. ' ,mpr;�c St .!oeaph County �'— '�_= Commission u E�3G64 EAt' Fdy Commission E,P"-s February 28. 2023 1316 COUNTY-Crry BUILDING 1Z Or PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD FAX 574/235-9171 SOUTH BEND, INDIANA 46601-1830 1865 ii" TDD 574/235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: November 21, 2016. To: All Planholders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: HVAC PREVENTATIVE MAINTENANCE PLAN Project Number: REQUEST FOR PROPOSALS ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy bid package upon submittal. Notes: MUST also be included with your THIS ADDENDUM MAY AFFECT YOUR BID. The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: le -D Authorized Signature: '/� Date: Version 4/2/2015