HomeMy WebLinkAboutChange Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 .s� SouTlaF%P e`. w re�crs CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS November 8, 2016 Josh McCormick Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 PHONE 574/235-9251 FAX 574/235-9171 RE: Change Order No. 8 — South Bend One -Way to Two -Way Conversion, Division B Project No. 116-001 Dear Mr. McCormick: The Board of Public Works, at its meeting held on November 8, 2016, approved the above referenced Change Order for an increase of $58,442.42, bringing the current contract amount to $17,306,460.73. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure c: Toy Villa, Engineering Michael Divita, Engineering Beth Leonard, Engineering Judy Love, Engineering GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU DATE: PROJECT NO: CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER 10/4/2016 PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 116-001 DIV B 116-001 South Bend One-way to Two-way Conversion 2/26/2016 8 PCR #8-Parking revision LaSalle and Michigan (change order26) Light Pole Foundation (change order 27) Hawk Signal (change order 28) Saw cutting Bike Path (change order 31) speed limit Revision (Change order 29) The original contract sum $ 16,131,908.36 Net change by previously authorized change orders $ 1,116,109.95 The contract sum prior to this change order $ 17,248,018.31 By this Change Order, the project amount is Increased ❑ Decreased $ 58,442.42 The new contract sum including this change order $ 17,306,460.73 This Change Order represents a total change of 0.34 % Total change for entire project 7.28 % Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR — oen ractoragRattlhe Printed Name and Title Rieth-Riley Construction CO., INC. Company Name 25200 State Road 23 Address South Bend, Indiana, 46614 City, State, Zip 0 days 6/1 /2017 RECOMMENDED FOR APPROVAL CONDUCTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: li 400 GaryA. Gilot, Presidpnt Elizabeth A Maradik, Member Therese J. Dorau�'Mem er James A. Mueller, Member Change Order No. 28 One- Way to Two -Way Street Conversion Division B Project No. 116-001 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. Patrick K. Wooden, P.E. Professional Engineer No. 10504741 CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion Division B Project No. 116-001 SUBJECT: HAWK Signal ISSUE DATE: October 3, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Replace the traffic signal controller to be used for the emergency signal located on Michigan Street at South Bend Fire Station #1 in order to ensure compatibility with the proposed HAWK signal at this location. The following sections of the Contract Documents are revised as a result of the above changes: 1. Bid/Proposal Form: Division B: Add EWA Line Item No. 470: CONTROLLER, 1 EA @ $8,844.17/EA for a total addition of $8,844.17. Sheet 1 of 3 Change Order No. 28 One- Way to Two -Way Street Conversion Division B Project No. 116-001 SPECIFICATIONS: The following special provision have been added to the Contract Documents and is issued as a part of this Change Order: C00061I1, CONTROLLER (NEWJ A. Prevailing Specification: 2016, INDOT Standard Specifications Sections 805 and 922 B. Additions: 1. A new ACS/3-1000 or greater controller is to be installed in the existing signal cabinet utilized to control the HAWK signal that provides access to Fire Station #1 (1222 S. Michigan St.). The existing signal controller shall be removed and delivered to the City of South Bend at the salvage location specified in this document. DRAWINGS: No change required. END OF CHANGE ORDER NO. 28 Sheet 2 of 3 Project No. 116-001 Change Order No. 28 — 10/3/16 ,`4pC lfl RE CITY OF SOUTH BEND 7 9 � d< PROJECT NAME: One -Way to Two -Way Street Conversion —Division B PROJECT NUMBER: 116-001 Division A: Item K :QuantityNo•Description Unit Unit Price Total Amount 470 CONTROLLER +1 EA $8,844.17 $8,844.17 OWNER: City of South Bend CONTRACTOR: Rieth-Riley Construction Signature Date Date $8,844.17 Sheet 3 of 3 Mr. Myron Cohagan Lochmueller Group 130 South Main St. Suite 300 South Bend, IN 46601 RE: Division B, EWA 026: Hawk Signal Dear Mr. Cohagan, September 15, 2016 Per your request, the following is Rieth-Riley's pricing for the purchasing of the Hawk Signal Materials which were originally going to be provided by the City. The installation of these items will be paid under existing unit pricing already established in this contract. Upon approval of this pricing Pemberton Davis will begin installation. Item # Qty Unit Description Unit Price Total EWA 1 LSM Hawk Signal Materials $8,844.17 $8,844.17 TOTAL $8,844.17 I have attached all the documentation which supports this pricing. Please let me know if you have any questions or require any additional information. Respectfully, Scoff-KLrklaa� c, Scott Kirkpatrick Estimator/Project Manager Rieth-Riley Construction 25200 S.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (574) 288-8321 • FAX: (574) 233-3464 ICA EXTRA WORK AGREEMENT UAT E: 9/15/16 CONTRACT: 116-001 PROJECT: DivisionB Two -Way Streets_ FORCE ACCOUNT/EXTRA WORK FOR: EWA 026Hawk Signal LABOR 109.04 (a) WEEK ENDING: June 15, 2016 EMPLOYEE Regular Overtime Oouble0meI TOTAL RATE EXTENSION ENGINEER 0.Do $35.00 $0.00 FINISHER CRAFT FOREMAN ELKHART/ST JOE 0.00 $32.17 $0.00 FINISHER, CRAFT FOREMAN LAPORTE 0,00 $0.00 FINISHER, JOURNEYMAN ELKHART/6T JOE 0.00 $29.92 $0.00 FINISHER, JOURNEYMAN LAPORTE 0.00 $0.00 FOREMAN, ELKHARTIST. JOSEPH 0.00 $24.15 $0.00 FOREMAN,ESOP 0.013 $40.00 $0.00 FOREMAN, FINISHER, ELKHART I ST. JOSEPH 0.00 $32.82 $0.00 FOREMAN, FINISHER. LAPORTE 0.00 $0.00 FOREMAN, LAPORTE 0.00 $0.00 TABORER, ELKHART/ST. JOSEPH 0.00 $22.62 $0.00 LABORER, LAPORTE 0.00 $23.62 $0.00 MECHANIC 0.00 I sn5R sn $0.00 OPERATOR ELKHART 0.00 $29.15 $0.00 RA OPETOR LAPORTE I ST. JOSEPH 0.00 $39SS $0.00 CA TECH 0.00 $30.00 $0.00 PROJECT SUPERINTENDENT 4.no i 4.00 $50.00 $200.00 TEAMSTER 0.00 1 $27.91 $0.00 TOTAL LABOR $200.00 (1) FICA 7.65 IN x LINE (1) $15.30 (2) FRINGES EMPLOYEE HOURS RATE EXTENSION ENGINEER____ O;nO % _ 0_00 ! % OypO X 0.00 % 000-x $12.50 - $1_3.4 _ $1_3.44' _ $13.44� $0.00 $0.00 $0.00 _ $0.00 $0.00 FINI6HER,GMFT FOREMAN ELKHART _ FNISHER, CRAFT FOREMANLAPORTE0.00$13.44A_ FINISHER, JOURNEYMAN ELKHART FINI6HER, JOURNEYMAN LAPORTE FOREMAN. ELKHART/ ST. JOSEPH $17.�00 $15_01) $0.00 FOREMAN, ESOP n.on X Ono % FOREMAN, FINISHER, ELKHARTIST. JOSEPH $13.44' _ $0.00 FOREMAN, FINISHER, LAPORTE 0.00 $13.44 D00 % $17.00 - $0,00 FOREMAN, LAPORTE = $0.00 LABORER, ELKHART/ST. JOSEPH _ _ 000 _ X_-__$12.96 0.00 X ! $1396 0.00 x 7 $1668 0.00 % 71 = $0.00 LABORER LAPORTE = - $0.00 $0.00 MECHANIC _ OPERATOR ELKHART - $0.00 $0,0_0 OPERATOR LAPORTE I ST. JOSEPH _$22 C.00 _ _x 1_ $2_6.15 0.Do x I $12_50 L__ $12.50 OA TECH _ _ PROJEOTSUPERINTENDEN= _$0.00 $50.00 TEAMSTER _ _4_00__X OJ % $13.44 $0.00 TOTAL FRINGES $50.00 (3) WORKERS COMPENSATION 19_60 % X LINE (1) $39.20 (4) BODILY INJURY INSURANCE 2.10 % % LINE (1) $4.20 (5) PROPERTY DAMAGE INSURANCE 0.00 % x ONE (1) $0.00 (6) STATE UNEMPLOYMENT 4.30 % X LINE (1) $8.60 (7) FEDERAL UNEMPLOYMENT 0.80 % x LINE (1) $1.60 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (a) TOTAL LINES 1, 2, 3, 4, 5, 6, 7, 689 $318.90 (10) 20%x UNE(10) $63.78 (11) GRAND TOTAL LABOR LINES (10)-(11) $382.68 (12) Page 1 of 3 INSURANCE. TAXES 109.04 WEEK ENDING: June 15, 2016 INSURANCE TAXES MATERIAL 109.04 (c) m TOTAL: LINE (13) + (14) $0.00 (15) 10 %x LINE (15) $0.00 (1E) GRAND TOTAL FOR INSURANCE, TAXES: LINE(15)+(16) $0.00(17) WEEK ENDING: June 15, 2016 MATERIALS PURCHASED: MATERIALS MANUFACTURED EQUIPMENT 109.04 (d) TOTAL: LINE(18)+(19) 12 %x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20)+(21) WEEK ENDING: June 15, 2016 $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $O.OD (22) CONTRACTOR OWNED EQUIPMENT BLUE BOOK ADJUSTED MONTHLY RATE i ns HRS BLUE BOON OPERATING RATE iHR BLUE BOOK TOTAL COST PER HOUR HOURS EXTENSION PICK-UP TRUCK 3/4 TON $8.751 $12.481 $21.231 4.001 $84.92 PICK-UP TRUCK i TON $9.891 $13.781 $23.671 1 $0.00 FLATRACK TRUCK $16.661 $16.85 $33.511 1 $0.00 LOWBOY $47.631 $43.251 $90.881 1 $0.00 TILT TOP TRAILER $6.501 $2,851 $9.35 $0.00 TRI-AXLE DUMP TRUCK $38,121 $41.10 $79.221 1 $0.00 QUAD -AXLE DUMP TRUCK 1 $40.591 $42.501 $83.09 $0.001 CX75 EXCAVATOR $45.541 $16.951 $62.491 1 $0.00 CX210 EXCAVATOR $73.261 $36.01 $109.361 $0.00 CX330 EXCAVATOR $113,851 $59.301 $173.151 $0.00 850 DOZER $53,891 $26.301 $80.19 $0,00 SKIOSTEER $26.601 $15.201 $41.801 1 $0.00 CAST 938 LOADER $42.561 $23.651 $66.211 1 $0.00 CAT 950 LOADER $56.951 $28.001 $84.951 1 $0.00 MAINTAINER $41.371 $20.151 $61.52 $0.00 GRADER 12 $55.03 $27.30 $82.33 $0.00 GRADER 140 $61.31 $30.80 $92.11 $0.00 Dirt Roller $34.95 $22.751 $57.701 $0.00 Asphalt Pave $268.08 $88.45 $356.53 $0.00 Distributor $34.70 $8.70 $43.40 $0.00 ROLLER 3-5 TON 1JIAsphalt $78.59 $27.10 $105.69 $0.00 ROLLER B-12TON $93.44 $29.10 $122.64 $0.00 AIR COMPERSSOR $19.20 $8A2 $27.32 $0.00 TOTAL CONTRACTOR OWNED EQUIPMENT $84.92 (23) RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES) $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $84.92 (26) 12 %x LINE (26) $10. 19 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $95.11 (28) Page 2 of 3 SUBCONTRACTORS 109.04 (f) WEEK ENDING: June 15, 2016 AMOUNT TOTAL SUBCONTRACT WEEK ENDING $7,636.12 (29) 10 % x LINE (30) $3,000.00 OR LESS $300.00 (31) 7% x LINE (30) OVER.$3,000.00 $324,53 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $8,260.65 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) 1 1 % OF BOND RATE BASED UPON LINE (34) 10 %x LINE (35) TOTAL EXTRA WORK LINES: (34) + (35) + (36) Page 3 of 3 $8,738.44 (34) $96.12 (35) $9.61 (36) $8,844.17 (37) Hawk Signal Controller PAGE 1 OF 3 Pemberton Davis Electric DATE: 9116116 CONTRACT 182704 FORCE ACCOUNT EXTRA WORK Description Hawk Signal Controller LABOR : 109.DS (aI WEEK ENDING: PROJECT: Two -Way Street Conversion EMPLOYEE REGULAR OVERTIME DOUBLETIME PAY HOURS RATE I TOTAL ELECTRICIAN FOREMAN 8 12 36.00 $432.00 ELECTRICIAN 29.85 GROUNDMAN / OPERATOR 33.95 GROUNDMAN / TRUCKDRIVER 23.80 OPERATOR, CLASS 1 42.86 OPERATOR, CLASS 4 24.60 LABORER FOREMAN 23.62 LABORER 20.12 LABORER 20.12 20.12 TOTAL LABOR S432.00 (1 ) FICA 7,65% X LINE (1) $93.05 (2 ) FRINGES: ELECTRICIAN FOREMAN 8 HRS X $14.17 = $113.36 ELECTRICIAN HRS X $11.51 = GROUNDMAN / OPERATOR HRS X 915.20 = GROUNDMAN / TRUCKDRIV HRS % $9.21 = OPERATOR, CLASS i HRS X. $25.60 ' OPERATOR, CLASS 4 HRS X $9.66 = LABORER FOREMAN HRS X $12.46 = LABORER HRS X $12.46 = LABORER HRS X $12.46 FIRS X TOTAL FRINGES $113.36 (3) WORKMEN'S COMPENSATION 7.10% X LINE(1) 111 (4) BODILY INJURY INSURANCE 2.10% X UNE(1) $9.07 (6) PROPERTY DAMAGE INSURANCE R42% X LINE (1) nu (a) STATE UNEMPLOYMENT 5.00% X LINE(1) $24.19 (7) FEDERAL UNEMPLOYMENT 0.80% X UNE(1) $3.46 (B) TRAVEL ALLOWANCE OR SUBSISTENCE (9) TOTAL: LINES (1)+(2)+(3)+(4)+(5)+(6)+(7)+(8) +(9) $647.02 (10) 20%X LINE (10) $129.52 (11) GRAND TOTAL LABOR: LINES (10) + (11) $777.14 (12) Hawk Signal Controller PAGE 2 OF 3 INSURANCE, TAXES : 109.05 (b ) INSURANCE: ( 1.80% X LINES (12)+(20)+(26)1 $134.78 (13) TAXES (14) TOTAL: LINES (13) + (14) 5134.78 (15 ) 10% X LINE (16) $13.48 (16) GRAND TOTAL FOR INSURANCE, TAXES: LINES (15) + (18) $148.26 (17 ) MATERIALS : 109.05 (a) TOTAL MATERIALS $5.706.55 (18) 12%X LINE(18) $694.39 (19) GRAND TOTAL MATERIALS: LINES 118) + (19) 36,480.94 (20 ) EQUIPMENT : 109.05 (d ) CONTRACTOR OWNED EQUIPMENT: MACHINERY OR SPECIAL EQUIPMENT BLUE BOOK ADJ. MO. RATE / 175 HIRE. BLUE BOOK OPERATING RATE/ HR BLUE BOOK TOTAL COST PER HOUR NO. OF HOURS EXTENSION SERVICE TRUCK 1 $9A3 525.06 $34.19 6 3205AB BUCKET TRUCK 2 524A4 526.21 $49.35 LINE TRUCK 3 .943.81 1 S3786 1 581.67 DUMP TRUCK 41 512,02 1 $23.24 1 535.26 SIGN TRUCK 51 356.10 1 557.90 1 $114.00 LOOP TRUCK ( LESS SAW) 6 $21.68 1 $53.47 1 $75.35 PICK - UP TRUCK 7 $4.39 $12.73 $16.52 TRUCK CRANE-15 TON 85 FT., 8X4, DSL B $43.50 542.42 5&5.92 BACKHOE - CASE # 580 L. 80 HP, 1.03 CYD, F 9 1 $15.05 $17.60 532.74 TRENCHER-DAN#6510, W/BACKHOE 10 $17.64 $14.34 $31.98 TRENCHER-DAV#401014500, W/BACKHO 11 1 314.88 $11.48 $26,36 TRENCHER -DAV#367013700 12 1 $9.94 $8.14 Siam BORING MACHINE -VERMEER#D24X40AW 13 1 $87.87 1 $162.01. $249.88 FIBER OPTIC CABLE VAN WITH O.T.D.R. 14 j $12.42 $23.27 535.69 FIBER OPTIC FUSION SPLICER ( LESS VEF 15 $8.33 $722 $16.66 HYORAULIC EXCAVATOR. GRADALL GS-R 16 537.89 $37.71 575.g0 HYDRAULIC EXCAVATOR -CAT E1201312C 17 1 $26.83 1 523.88 1 $50.79 LOADER -SKID STEER B/C#773-T 18 $1077 $11.56 $22.33 LOADER -SKID STEER SIC4883 19 1 $12.09 $13.93 $26.02 LOADER -SKID STEER B/C#864 20 1 513.63 $13.20 $28.83 ROCK BREAKER-Z-86, FOR SKID STEER 21 $4.32 $2.10 $0.42 TRACTOR ON HIGHWAY-8X4, 310 HP, D51 22 517.83 531.39 $49.22 TRAILER, EQUIPMENT, - 3 AXLE, 20 Ff., 7C 23 $9.52 $7.15 $16.67 TRAILER, GOOSENECK,- 2 AXLE, 18 E.. 3 24 58.93 55,55 $12.48 TRAILER, EQUIPMENT - 2 AXLE, 8 TON 26 S7.% $IAA 52.83 AIR COMPRESSOR -ROTARY SCREW, 185 1 26 $3.85 $10.40 $14.25 PAVEMENT BREAKER - 9D I.E. 27 1 SD.53 $0.45 $0.98 ROCK DRILL 7 CORING MACHINE 28 1 $0.97 $0.85 $1.52 CHIPPING HAMMER 29 1 $1.35 $0.45 $1.80 SMALL GENERATOR - 5 KW MAX. 30 I Saw $3.66 $4.52 VIBRATORY PLATE COMPACTOR, MANUAL ( 31 1 $4.30 $3.71 SB.01 CUT-OFF SAW 32 1 51.48 $17.32 $18.80 MAGNETIC DRILL (LESS BITS) 33 $1.0 $0.70 $1.75 CONCRETE SAW - 35 HP 34 $5.87 I $13,35 $19,22 TRAFFIC LINE REMOVER 35 1 $2.79 1 $3.21 $8.00 ARROW BOARD -DIESEL 36 52.19 $1.20 $4.00 ARROW BOARD - SOLAR 37 51,74 $0.50 $2.24 CRASH ATTENUATOR FOR TRUCK MOUNT 38 $3.97 $0.60 $4.57 HYDRAULIC SENDER 39 $10.39 $4.30 $14.69 TRASH PUMP W/HOSE 8 GENERATOR 40 $5.10 $6.07 $11.17 TOTAL CONTRACTOR OWNED EQUIPMENT $205.16 (21 ) RENTED EQUIPMENT - (22) FUEL, LUBRICANTS, 8 TRANSPORTATION COSTS (23) TOTAL: LINES (21)+(22)+(23) $205.16 (24) 12%X LINE (2A) $24.62 (26) GRAND TOTAL EQUIPMENT : LINES (24) + (25) $229,78 (26) 9 Hawk Signal Controller PAGE 3 OF 3 SUBCONTRACTS : 109.06 (f) SUBCONTRACTS WEEK ENDING : URN PH<S • TOTAL. SUBCONTRACTS WEEK ENDING (27) TOTAL SUBCONTRACTS TO DATE - (28) 10% X LINE (28 ), FOR FIRST $3,000.00 (20 ) 7% X BALANCE OF LINE (28), IF LINE (28) IS OVER $3,000 -- (30) GRAND TOTAL SUBCONTRACTS: LINES (28)+(29)+(30) (31) TOTAL: LINES (12). (17). (20), (26). 8 (31) $7,035.12 (32) 1.1% BOND RATE BASED UPON LINE (32) (33) 10% X LINE (33) (34 ) TOTAL EXTRA WORK : LINES (321 + (33) + (34) S7,835.12 (35 ) xQTEs: 1) ATTACH LOPIM OP MILV THE BHEETE SHOWWO IABON AND OONIRA ."WNED EQUIPMENT. N 9UEOOMRACTOR6 USE FMQE81 ANO R Me PRIME OONTRACTORS ATIAOH TO PAGE 9. 91, ATTACH ORUM)OWN roR EACH INOVNUAL ITHIO POW MAY BE PHOTOCOPIED OR REPRINTED AS NECESSARY) Hawk Signal Controller Description MATERIALS City Unit Description Unit Cost Total Cost 6 Each Hybrid Signal Hardware - Span Mount $311.00 $1,866,00 1 Each Controller ASC/3-21 00 $2,711.00 $2711.00 2 Each San Wire Junction Box $167.00 $334.00 8 Hr Traffic Control Corp- Assist , $75.00 $600.00 -------------- 1 .............. -------------- LSM ......I------- ---------------------------------------------------------------- Total Above Misc. Materials ( 5 %) ------- --------------------------------------------------------- Total Materials ---------------- ---------------- ----------------- $6,511.00 $275.55 -- ---------- -- $5,786.55 Invoice; 93229 7_; T F IC CONTROL 10 R ORATION 104 AR ONNE WOODS DRIVE WO RI GE IL 60517 630--300 Fax:630-543-5050 ,' T t 4 y�,m�'dsss� T {A'Y rq,1t51-P-- 2 tXJA.-j- /* Act' Page: 1 of 1 Invoice Date: 9/2/2016 Due Date: 1912/2016 To: 14719 Ship To: PEMBERTON-DAVIS ELECTRIC INC PEMBERTON-DAVIS ELECTRIC INC 916 E MCKINLEY AVENUE 916 E MCKINLEY AVE MISHAWAKA IN46545 MISHAWAKA IN46545 USA USA Fax:574-272-25fi5 A/P EMail: APINVOICE@PEMBERTONDAVIS.COM ' j Customer PO: 16274-4350 ✓ /e,Z gyp: f .. Ship Via: 1. FEDEX ,Sales Rep: DAVE SAN.TANA Order Date: 6/30/2016 Pack Slip No: 68382 I TCC Order No: 708059 RMA No: D i Location: SOUTH BEND i Project Desc: HAWK SIGNAL USING EXISTING TS-9 CABINET Quote Num: 611054 i Tracking Number)s); 364479415150061 1 F51880 1.00 E CONTROLLER, ASC/3-2100, W/HEATER, DATA KEY, ETHERNET Comments. PLEASE PROGRAM CONTROLLER FOR HAWK OPERA TIONAND SUPPLYGENERIC PRINTS HOW TO HOOK UP IN TS-1 CAB/NET. SerialNumber A32284 ' II TAX DETAIL Description IN EXEMPT Terms: NET30 Sales Tax ID: 0070672241 5 FOB: DESTINATION-FRT INCLUDED 1.00 /1 Goods &Services 2,711.00 Total Misc Charges 0.00 �" Tavec 0.00 Taxable Amt Tax Rate Amount (InvoiceTotal $2r71 1 •®0 2,711.00 0.000% 0.00 90/2/2016 Payment Due: 7���— Remit To: Traffic Control Corp, 10435 Argonne Woods Drive, Woodridge, IL 60517 .`'��:��/D Subject to current Terms &Conditions available at vvww.trafficcontrolcorp.com Sign up to receive invoices via email. Send request to AccountingDept@TrafficControlCorp.com F� TRAFFIC CONTROL CO'.RP0RAT ION 10435 ARGO NNE WOODS DRIVE WOODRIDGE IL 60517 < > 630-543-1300 Fax:630-543-5D50 Invoice;93277 To:14719 PEMBERTON-DAVIS ELECTRIC INC 916 E MCKINLEY AVENUE MISHAWAKA IN 46545 USA Page: Invoice Date: ' a' , 3 "Ps a `w7N7a Ia 3 ffi'7T�e Due Date: Ship To: PEMBERTON-DAVIS ELECTRIC INC 916 E MCKINLEY AVE MISHAWAKA IN 46545 USA Fax:574-272-2565 A/PEMail:APINVOICE@PEMBERTONDAVIS.COM Customer PO: 162704-4372/ Sales Rep: STEPHEN KETTLESTRINGS Order Date: 8/3/2016 TCC Order No: 708081 Location: SOUTH BEND 2-WAY Project Desc: SPAN WIRE HARDWARE Quote Num 611116 Tracking Number(s): Ship Via: 1. Pack Slip No: 88396 RMA No: 0 1 of 1 9/7/2016 10/7/2016 Terms: NET 30 Sales Tax ID: 00706722-015 FOB: DESTINATION-FRTINCLUDED 1 HYBRID SIGNAL HARDWARE T 6.00EA 311.00 A HARDWARE TO HANG HYBRID SIGNALS ON SPAN WIRE: 1. 12001 CABLE CLAMP 2. 12002 BALANCE ADJUSTER 3. 12040 WEATHER HEAD 4. 12004 2-WAY TUBE SPREADER - 5. 120042-WAY TUBE SPREADER 6. 12042 TRkSTUD WASHER KIT 7. 12010 TETHER CLAMP A BACKPLATE DOES NOT EXIST CURRENTLY FOR THIS CONFIGURATION Goods & Services Total Misc Charges II TAX DETAIL Taxes Description Taxable Amt Tax Rate Amount FInvoice To'IN EXEMPT 1,866.00 0.000% 0.00 ment Due: Remit To: Traffic Control Corp, 10435 Argonne Woods Drive, Woodridge, IL 60517 Subject to current Terms & Conditions available at www.traffccontroloorp.com Sign up to receive invoices via email Send requestto AccountingDept@TrafficControlCorp.com 1,66ti.UU 0.00 0.00 $1,866.00 1r71712b16 y:.::. :. jA_-t,44, 0- 2Ljp-/- APO Ae-r- TRAFFIC CONTROL CORPORATION 10435 ARGONNE WOODS DRIVE WOODRIDGE IL 60517 630543-1300 Fax: 630-543-6050 Invoice: 93278 "Offiffi MAIN Page: 1 of 1 Invoice Date: 9/7/2016 Due Date: I Of7/2015 To: 14719 Ship To: PEMBERTON-DAVIS ELECTRIC INC PEMBERTON-DAVIS ELECTRIC INC 916 E MCKINLEYAVENUE 916 E MCKINLEYAVE MISHAWAKA IN46545 MISHAWAKA IN46545 USA USA Fax:574-272-2565 Ar'P EMail: APINVOICE@PEMBERTONDAVIS.COM [Customer PO: 162704-4372t/ Ship Via; 1. FEDEX GROUND Terms: NE7 3U I Sales Rep: STEPHEN KETTLESTRINGS Sales Tax ID:.00706722-015 - Order Date: 8/312016 Pack Slip Nd: 16-0213 FOB: DESTINATION-FRT INCLUDED TCC Order No: 708081 RMA No: 0 (Location: SOUTH BEND 2-WAY - Project Desc: SPAN WIRE HARDWARE I Quote Num: 611116 Tracking Number(s) + �°r! $NISI ��one FY-�XiSuCYf�l'4,P6Eer "4» s3 T.a L—s -n -9�c i_.q 11111.0 H Vn l �,a- ON IN av m! _. 1 F97108. - 2.00EA 167.00 /1 334.00 SPAN WIRE JUNCTION BOX: ELLIOT, 12068 2 F95920 12.00 EA 0.00 /1 0.00 2-WAY TUBULAR SPREADER: ELLIOT, 12004 - 3 12042 6.00 EA 0.00 /1 0.00 ELLIOTT TRI-STUD WASHER KIT Goods & Services 334.00 _. _.. -- _. . --.. _..__.. -._ . . — ---- -- Total Miso-Charges — — -- -0.00 - TAX DETAIL Taxes 0.00 Description Taxable Amt Tax Rate Amount Invoice Total $334�.00 IN EXEMPT _ 334.00 0.000% 0.00 Payment Due: 10/7/2016 Remit To: Traffic Control Corp,35 Argonne Woods Drive, Woodridge, 60517 & Conwww.traffccontrolcorp.com to current Terms Conditions available at v✓w.trafFlccontrolcorp.cocom Sign up to receive invoices via email. Send request to AccountingDept@TrafficControlCorp.com Change Order No. 31 One- Way to Two -Way Street Conversion Division B Project No. 116-001 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. Patrick K. Wooden, P.E. Professional Engineer No. 10504741 CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion Division B Project No. 116-001 SUBJECT: Saw Cut Bike Path Joints ISSUE DATE: October 3, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. A pay item is being added to account for the work of saw cutting joints within the PCCP bike path. The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS• 1. Bid/Proposal Form: Division B: Add EWA Line Item No. 472: SAW CUT BIKE PATH JOINTS, 2,000 LFT @ $2.00/LFT for a total addition of $4,000.00. SPECIFICATIONS: None DRAWINGS: None END OF CHANGE ORDER NO. 31 Sheet 1 of 3 Project No. 116-001 Change Order No. 31 — 1013/16 L� CITY OF SOUTH BEND a - a'l Y xas PROJECT NAME: One -Way to Two -Way Street Conversion —Division B PROJECT NUMBER: 116-001 Division A: Item No. Description Quantity Unit Unit Price Total Amount 472 ISAW CUT BIKE PATH JOINTS 2,000 LFT $2.00 $4,000.06 OWNER: City of South Bend CONTRACTOR: Rieth-Riley Construction Signature Date "ULG $_4,000.00_ Sheet 2 of 3 Mr. Myron Cohagan Lochmueller Group 130 South Main St. Suite 300 South Bend, IN 46601 RE: Division B, EWA 027: Sawed Joints for Bike Path Dear Mr. Cohagan, September 15, 2016 Per your request, the following is Rieth-Riley's pricing to Saw Cut the joints on the remaining bike path concrete. The quantity below is only an estimate. It is our understanding that the actual quantity will be field measured and paid accordingly. Item # Qty Unit Description Unit Price Total EWA 1000 LIFT Saw Cut Bike Path Joints $2.00 $2,000.00 TOTAL $2,000.00 Please let me know if you have any questions or require any additional information. Respectfully, Scott Kip-k,�att-i,ck. Scott Kirkpatrick Estimator/Project Manager Rieth-Riley Construction 25200 S.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (574) 288-8321 • FAX: (574) 233-3464 Change Order No. 26 One- Way to Two -Way Street Conversion Division B Project No. 116-001 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. Patrick K. Wooden, P.E. Professional Engineer No. 10504741 CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion, Division B Project No. 116-001 SUBJECT: Parking Revision on Michigan North of LaSalle ISSUE DATE: October 3, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Revised parking along the east side of Michigan Street north of LaSalle Avenue requested on Division B of Contract 116-001. Work to be performed according to INDOT Standard Specifications. This results in a $4,046.55 cost increase for Division B. The following sections of the Contract Documents are revised as a result of the above changes: 1. Bid/Proposal Form: Division B: Project 114-035: Remove 67 SYS from Line Item 18: SIDEWALK, CONCRETE, REMOVE, -67 SYS @ $4.75/SYS for a total subtraction of ($318.25). Remove 55 SYS from Line Item 83: SIDEWALK, CONCRETE, 5", 55 SYS @ $37.00/SYS for a total subtraction of ($2,035.00). Add 7 SYS to Line Item 87: CURB RAMP, CONCRETE, A, 7 SYS @ $140.00/SYS for a total addition of $980.00. Remove 100 SYS from Line Item 114: SODDING, NURSERY AND TOPSOIL, -100 Sheet 1 of 4 Change Order No. 26 One- Way to Two -Way Street Conversion Division B Project No. 116-001 SYS @ $4.30/SYS for a total subtraction of ($430.00) Add 88 SYS to Line Item 116: BRICK, DECORATIVE, 88 SYS @ $113.00/SYS for a total addition of $9,944.00. Add 10 LFT to Line Item 160: PIPE, TYPE 2, CIRCULAR, 12 IN, 10 LFT @ $24.00/LFT for a total addition of $240.00. Add 20 LFT to Line Item 527: HEADER, CONCRETE, 20 LFT @ $30.98/LFT for a total addition of $619.60. Project 115-019: Remove 60 LFT from Line Item 15: CURB, CONCRETE, REMOVE, -60 LFT @ $3.40/LFT for a total subtraction of ($204.00). Remove 88 SYS from Line Item 18: SIDEWALK, CONCRETE, REMOVE, -88 SYS @ $4.75/SYS for a total subtraction of ($418.00). Remove 4 SYS from Line Item 35: SUBGRADE TREATMENT, TYPE IV, -4 SYS @ $31.30/SYS for a total subtraction of ($125.20). Remove 2 TON from Line Item 43: WIDENING WITH HMA, TYPE D, -2 TON @ $110.00/TON for a total subtraction of ($220.00). Remove 4 SYS from Line Item 44: MILLING, ASPHALT, 1 Y IN, -4 SYS @ $1.75/SYS for a total subtraction of ($7.00). Remove 1 TON from Line Item 51: QC/QA-HMA, 4, 76, SURFACE, 9.5 mm, -1 TON @ $77.00/TON for a total subtraction of ($77.00). Add 2 SYS to Line Item 69: PCCP, 4 IN., 2 SYS @ $40.50/SYS for a total addition of $81.00 Remove 45 SYS to Line Item 82: SIDEWALK, CONCRETE, 4", -45 SYS @ $34.00/SYS for a total subtraction of ($1,530.00). Add 3 SYS to Line Item 84: SIDEWALK, CONCRETE, 6", 3 SYS @ $43.00/SYS for a total addition of $129.00. Remove 23 SYS to Line Item 87: CURB RAMP, CONCRETE, A, -23 SYS @ $140.00/SYS for a total subtraction of ($3,220.00). Add 1 LFT to Line Item 100: CURB, CONCRETE, 1 LFT @ $19.00/LFT for a total addition of $19,00. Add 1 LFT to Line Item 104: CURB AND GUTTER, B, CONCRETE, 1 LFT @ $22.00/LFT for a total addition of $22.00. Sheet 2 of 4 Change Order No. 26 One- Way to Two -Way Street Conversion Division B Project No. 116-001 Remove 42 SYS from Line Item 114: SODDING, NURSERY AND TOPSOIL, -42 SYS @ $4.30/SYS for a total subtraction of ($180.60). Add 4 SYS to Line Item 116: BRICK, DECORATIVE, 4 SYS @ $113.00/SYS for a total addition of $452.00. Remove 1 EACH from Line Item 257: SIGNAL PEDESTAL FOUNDATION, A, -1 EACH @ $585.00/EACH for a total subtraction of ($585.00). Add 23 LFT to Line Item 261: CONDUIT, PVC, 2 IN, SCHEDULE 80, 23 LFT @ $5.20/LFT for a total addition of $119.60. Add 58 LFT to Line Item 263: CONDUIT, HDPE, 2 IN, SCHEDULE 80, 58 LFT @ $11.30/LFT for a total addition of $655.40. Add 54 LFT to Line Item 312: NO, 4 WIRE, COPPER, 4 1/C, 54 LFT @ $1.40/LFT for a total addition of $75.60. Add 54 LFT to Line Item 313: NO. 6 WIRE, COPPER, 4 1/C, 54 LFT @ $1.10/LFT for a total addition of $59.40. SPECIFICATIONS: NO CHANGE REQUIRED DRAWINGS: Project Number 114-035: SHEET 9 : Revised Sheet; Revised Detail SHEETS 31, 38, 44, 94, & 95: Revised Sheets; Revised Parking Spaces, Deleted Sidewalk SHEET 56: Revised Sheet; Revised Pavement Markings Project Number 115-019: SHEETS 13, 49-A, 58, 60, 85, 116, 118, 170-A, 183, 204-A, 220: Deleted Sheets SHEETS 13-A, 49-B, 58-A, 60-A, 85-A, 116-A, 118-A, 170-B, 183-A, 204-B, 220-A: Replaced Sheets; Modified Curb Line, Curb Ramp, & Markings END OF CHANGE ORDER NO. 26 Sheet 3 of 4 Project No. 116-001 Change Order No. 26 - 9/30116 OYyOV TO 94;1 CITY OF SOUTH BEND, w a` R PROJECT NAME: One -Way to Two -Way Street Conversion -Division B 1865 PROJECT NUMBER: 116-001 114-035: Item No. Description Quantity I Unit Unit Price ITotal Amount 18 SIDEWALK, CONCRETE, REMOVE -67 SYS $4.75 (-$318.25) 83 SIDEWALK, CONCRETE, 5" -55 SYS $37.00 (-$2,035.00) 87 CURB RAMP, CONCRETE, A 7 SYS 1 $140.001 $980.00 114 SODDING, NURSERY AND TOPSOIL -100 SYS $4.30 1 $-430.00) 116 BRICK, DECORATIVE 88 SYS $113.001 $9,944.00 160 PIPE, TYPE 2, CIRCULAR, 12 IN 10 LFT $24.00 $240.00 527 HEADER, CONCRETE 20 LFT $30.98 $619.60 115-019: Item No. Description Quantity Unit Unit Price Total Amount 15 CURB, CONCRETE, REMOVE -60 LFT $3.40 ($204.00) 18 SIDEWALK, CONCRETE, REMOVE -88 SYS $4.75 ($418.00) 35 SUBGRADE TEATMENT, TYPE IV -4 SYS $31.30 (-$125.20) 43 WIDENING WITH HMA, TYPE D -2 TON $110.00 (-$220.00) 44 MILLING, ASPHALT, 1 1/2 IN -4 SYS $1.75 (-$7.00) 51 QC/QA-HMA, 4, 76, SURFACE, 9.5 mm -1 TON $77.00 (-$77.00) 69 PCCP, 4 IN. 2 SYS $40.50 $81.00 82 SIDEWALK, CONCRETE, 4" -45 SYS $34.00 (-1,530.00) 84 SIDEWALK, CONCRETE, 6" 3 SYS $43.00 $129.00 87 CURB RAMP, CONCRETE, A -23 SYS $140.00 (-3,220.00) 100 CURB, CONCRETE 1 LFT $19.00 $19.00 104 CURB AND GUTTER, B, CONCRETE 1 LFT $22.00 $22.00 114 SODDING, NURSERY AND TOPSOIL -42 SYS $4.30 ($-180.60) 116 BRICK, DECORATIVE 4 SYS $113.00 $452.00 257 SIGNAL PEDESTAL FOUNDATION, A -1 EA $585.00 ($585.00) 261 CONDUIT, PVC, 2 IN, SCHEDULE 80 23 LFT $5.20 $119.60 263 CONDUIT, HDPE, 2 IN, SCHEDULE 80 58 LFT $11.30 $655.40 Sheet 4 of 4 Project No. 116-001 Change Order No. 26 — 9/30/16 312 NO. 4 WIRE, COPPER, 4 1/C 54 LFT $1.40 $75.60 313 INO. 6 WIRE, COPPER, 4 1/C 54 LFT $1.10 $59.40 OWNER: City of South Bend Signature Date CONTRACTOR: Rieth-Riley Construction Date $4,046.55 Sheet 5 of 4 Change Order No. 27 One- Way to Two -Way Street Conversion Division B Project No. 116-001 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. Patrick K. Wooden, P.E. Professional Engineer No. 10504741 CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion Division B Project No. 116-001 SUBJECT: Light Pole Foundations ISSUE DATE: October 3, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: Several light pole foundations along the west side of Main Street between Western Avenue and LaSalle Avenue have been identified as being in conflict with an existing AEP duct bank. A spread footer design has been developed to remedy such conflicts. This footer is to be utilized on an as needed basis in lieu of the drilled shaft specified in the original construction documents. The details of this spread footer are provided in Division B Part 1 of 3 Revision 16. The following sections of the Contract Documents are revised as a result of the above changes: 1. Bid/Proposal Form: Division B: New EWA Line Item No.471: LIGHT POLE FOUNDATION SPREAD FOOTER, 30 EA @ $ 1,928.39/EA for a total addition of $57,851.70. Subtract 30 EACH to Line Item No. 296 LIGHT STANDARD FOUNDATION, 2FT DIAMETER X 6FT, -30 EACH @ $560.00/EACH for a total deduction of (-$16,800.00) Sheet 1 of 3 Change Order No. 27 One- Way to Two -Way Street Conversion Division B Project No. 116-001 SPECIFICATIONS: The following special provision of the Contract Documents has been revised and is issued as a part of this Change Order: C)OO(1X. LIGHT POLE FOUNDATION A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 807 Additions: 1. Each Street Light and Drive light will be mounted on a concrete foundation, as shown on the plans. 2. The contractor is advised to order lighting materials as soon as possible due to the project schedule limits. 3. The cost of the Light Pole Foundation shall include the anchor bolts, reinforcing steel, grounding, concrete, materials, labor, equipment and appurtenances required to construct the foundation complete and in place. 4. Light Pole FoURdation will be paid f9F at the GentraGt �nit price faF "Light Pole N "pvsal w�^car 4. Standard drilled shaft foundations will be paid for at the contract unit price for "Light Pole Standard Foundation, 2FT diameter X 6FT diameter... EACH" as indicated on the itemized proposal sheet. 5. Spread footer foundations will be paid for at the contract unit price for "Light Pole Foundation, Spread Footer... EACH" as indicated on the itemized proposal sheet. DRAWINGS: The following sheets have been revised or issued as new sheets. Division B Revision 16 Sheet 183-1 —Added Sheet END OF CHANGE ORDER NO. 27 Sheet 2 of 3 Project No. 116-001 Change Order No. 28—10/3/16 'Ol Cry g� OY �O CITY OF SOUTH BEND 9 r r - - PROJECT NAME: One -Way to Two-Wav Street Conversion —Division B IxR> PROJECT NUMBER: 116-001 Division A: Item No. Description Quantity Unit Unit Price Total Amount 471 LIGHT POLE FOUNDATION, SPREAD FOOTER 30 EA $1,928.3 $57,851.70 296 LIGHT STANDARD FOUNDATION, 2FT DIAMETER X 6FT 30 EA $560.00 $16,800.00 OWNER: City of South Bend CONTRACTOR: Rieth-Riley Construction Signature Date Date $41, 051.70 Sheet 3 of 3 Mr. Myron Cohagan Lochmueller Group 130 South Main St. Suite 300 South Bend, IN 46601 RE: Division B, EWA 028: Spread Lighting Foundation Dear Mr. Cohagan, September 21, 2016 Per your request, the following is Rieth-Riley's pricing for the installation of a Spread Lighting Foundation based on the detail provided on 9/16/16, It is our understanding that these will be used in areas where the proposed drilled shaft foundations is in conflict with existing utilities. Upon approval of this pricing Pemberton Davis will begin installation. Item # Qty I Unit Description Unit Price Total EWA 1 EA Spread Lighting Foundation $1,928.39 $1,928.39 TOTAL $1,928.39 I have attached all the documentation which supports this pricing. Please let me know if you have any questions or require any additional information. Respectfully, Sc&H- Kirk q--rick. Scott Kirkpatrick Estimator/Project Manager Rieth-Riley Construction 25200 S.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: 1574) 288-8321 • FAX: (574) 233-3464 ICA EXTRA WORK AGREEMENT DATE: 9/20/16 CONTRACT: 116-001 PROJECT: DiyisionB Two-Wav Street FORCE ACCOUNT/EXTRA WORK FOR: EWA 028 Spread Foundation LABOR 109.04 (a) WEEK ENDING: September 20, 2016 EMPLOYEE Regular Ovedime DOuble6me TOTAL RATE EXTENSION ENGINEER 0.00 $35,00 $0.00 FINISHER, CRAFT FOREMAN ELKHART/ST JOE 0.00 $32.17 $0.00 FINISHER, CRAFT FOREMAN LAPORTE 0.00 $0.00 FINISHER JOURNEYMAN ELKHARTIST JOE 0.00 $29.92 $0.00 FINISHER, JOURNEYMAN LAPORTE 0.00 $0.00 FOREMAN, ELKHARTI ST. JOSEPH 0.60 $24.15 $0.00 FOREMAN, ESOP 0.00 $40.00 $0.00 FOREMAN, FINISHER, ELKHARTIST. JOSEPH 0.00 $32.82 $0.00 FOREMAN, FINISHER, LAPORTE OAO $0.00 FOREMAN, LAPORTE 0.00 $0.00 LABORER, ELKHARTI ST. JOSEPH 0.00 $22.621 $0.00 LABORER, LAPORTE 0.00 $23.621 $0.00 MECHANIC 1 0.00 1 $35,6011 $0.00 OPERATOR ELKHART 0.00 $29.15 $0.00 OPERATOR LAPORTE! ST. JOSEPH 0,00 $39.85 $0.00 CA TECH 0.00 $30.00 $0.00 PROJECT SUPERINTENDENT 0.00 $50.00 $0.00 TEAMSTER 0.00 1 $27.911 $0.00 TOTAL LABOR $0.00 (1) FICA 7.66 % x LINE (1) $0.00 (2) FRINGES HOURS RATE EXTENSION p.DO % $12.50 = $0.00 AFT FOREMAN ELKHART 0.00 x r $13.44 - $0.00 rEMPLOYEE RAFT FOREMAN LAPORTE o,m ,__$13.44 - $0.00 URNEYMAN ELKHART _ __ _X 0.00 X (_ $13.44 $0.00 URNEYMAN LAPORTE _ __ 000 % _ $13.4t = $0.0LKHART/ST. JOSEPH 0100 X 1 $17.00 = $0.00 _ , ESOP _ _ 07 0 X $15_00 = $0.00 , FINISHER_ ELKHART I ST. JOSEPH _ 0.00 X $13.44 = $0.00 , FINISHER, LAPORTE O.00 - % $13.44 $0.00 _ , LAPORTE _ O.oO $0.00 , ELKHART/ST. JOSEPH r _ _ _X _$17_00 a00 X $12.96 = Koo $0.00 LAPORTE 0.00 X 060 XI 000 % 0_00 X D.Go x _I. 000 _ % O.00 X 1 $1396 $1668$0.00R ELKHART LAPORTE/ST. JOGEPH 1 $2271_$0.00R $28, 15 = $0.00 Q TEDH $12.50 __ _ $0.00 PROJECT SUPERINTENDENT ._ $12.50 = TEAMSTER $13.44 = _$0.00 $0.00 TOTAL FRINGES $0.00 (3) WORKERS COMPENSATION 19_60 % X LINE (1) $0.00 (4) BODILY INJURY INSURANCE 2.10 % X LINE (1) $0.00 (5) PROPERTY DAMAGE INSURANCE 0.00 % X LINE (1) $0.00 (a) STATE UNEMPLOYMENT 4.30 % X LINE (1) $0.00 (7) FEDERAL UNEMPLOYMENT 0.80 % X LINE (1) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 1.2, 3, 4, 5, 6, 7, B a 9 $0.00 (10) 20 %x LINE (10) $0.00 (11) GRAND TOTAL LABOR LINES (10) +(11) $0.00 (12) Pagel of 3 INSURANCE. TAXES 109.04 WEEKENDING: September 20 2016 INSURANCE TAXES MATERIAL 109.04(c) (13) TOTAL: LINE (13) + (14) $0.00 (15) 10 %x LINE (15) $0.00 (16) GRAND TOTAL FOR INSURANCE, TAXES: LINE (15)+ (16) $0.00 (17) WEEKENDING: September 20 2016 MATERIALS PURCHASED: MATERIALS MANUFACTURED TOTAL: LINE(18)+(19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) WEEKENDING: September 20 2016 $0.00 (18) $0.00 (19) $0.00 (20) $0,00 (21) $0.00 (22) CONTRACTOR OWNED EQUIPMENT BLUE BOOK ADJUSTED MONTHLY RAreins HRS BLUE BOOK OPERATING RATE I H R BLUEBOOKTOTPL ...TPERHOUR HOURS EXTENSION PICK-UP TRUCK 3/4 TON $8.761 $12.48 $21.231 $0.00 PICK-UP TRUCK 1 TON $9.891 $13.781 $23.671 $0.00 FLATRACK TRUCK $16.661 $16.85 $33.511 $0.00 LOWBOY $47.631 $43.251 $90.881 $0.00 TILT TOP TRAILER $6.501 $2.851 $9.35 $0.00 TRI-AXLE DUMP TRUCK $38.121 $41.101 $79.221 $0.00 QUAD -AXLE DUMP TRUCK 1 $40.591 $42.501 $83.09 $0.00 CX75 EXCAVATOR $45.541 $16.95 $62.491 $0.00 CX210 EXCAVATOR $73.261 $36.101 $109.36 $0.001 CX330 EXCAVATOR $113.851 $59.30 $173.151 $0.00 850 DOZER $53.891 $26.301 $80.191 $0.00 SKIDSTEER $26.601 $15.20 $41,80 $0.00 CAST 938 LOADER $42.661 $23.65 $66.21 $0.00 CAT 950 LOADER $56.95 $28.00 $84,95 $0.00 MAINTAINER $41.371 $20.15 $61.621 $0.00 GRADER 12 $55.03 $27.30 $82.33 $0.00 GRADER 140 $61.31 $36.e0 $92.11 $0.00 Dirt Roller $34.95 $22.75 $57.70 $0.00 Asphalt Pave $268.08 $88.45 $356.53 $0.00 Asphalt Distributor $34.70 $8.70 $43.40 $0.00 ROLLER 3-5 TON $78.59 $27.10 $105.69 $0.00 ROLLER B-12 TON $93.44 $29.10 $122.54 $0.00 AIR COMPERSSOR $19.20 $8.12 $27.32 $0.00 TOTAL CONTRACTOR OWNED EQUIPMENT $0.00 (23) RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES) $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $0.00 (26) 12 % x LINE (26) $0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 (28) Page 2 of 3 SUBCONTRACTORS 109.04 M WEEK ENDING: September 20, 2016 DESCRIPTION AMOUNT Pemberton Davis Electric $1,732.12 TOTAL SUBCONTRACT WEEK ENDING $1,732.12 (29) 10 % x LINE (30) $3,000.00 OR LESS $173.21 (31) 7 %x LINE (30) OVER $3,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $1.905.33 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) 1 1 % OF BOND RATE BASED UPON LINE (34) 10 % x LINE (35) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $1,905.33 (34) $20.96 (35) $2.10 (36) $1,928.39 (37) Page 3 of 3 Spread FODter Lighting PAGE OF Pemberton Davis Electric DATE: 9121116 CONTRACT 162704 PROJECT: Two -Way Street Converelon FORCE ACCOUNT / EXTRA WORK - Description Spread Fouler Foundation (Lighting) ' LABOR: 109.05(a) WEEKENDING: EMPLOYEE REGULAR I OVERTIME DOUBLETIME PAY HOURS RATE TOTAL ELECTRICIAN FOREMAN 35,00 ELECTRICIAN1 2S85 GROUNDMAN f OPERATOR 1 33.95 GROUNDMAN / TRUCKORIVER 23.80 OPERATOR, CLASS 1 6 7.5 42.86 $321.45 OPERATOR, CLASS 4 24.60 LABORER FOREMAN 5 7.5 23A2 $177.15 LABORER 20.12 LABORER 20.12 20.12 TOTAL LABOR $498.60 (1 ) FICA 7.65% X LINE 11) $3844 (2 ) FRINGES: ELECTRICIAN FOREMAN HAS X $14.17 v ELECTRICIAN HRS X $11.51 GROUNDMAN / OPERATOR HRS X $15.20 = GROUNDMAN / TRUCKDRN HRS X $9.21 OPERATOR, CLASS 6 HRS X $26.60 = $133.DO . OPERATOR, CLASS 4 HRS X $9.66 = LABORER FOREMAN 6 .HRS X $12.46 = $62.30 LABORER HRS X $12.46 = LABORER HRS X $12AS " HRS X TOTAL FRINGES $195.30 (3). WORKMEN'S COMPENSATION 7.10% X UNE(1) $35.40 (4) BODILY INJURY INSURANCE 2.10% X UNE(1) $10.47 (5) - - _ _...ER PROPERTY DAMAGE INSURANCE _0.42%---_ _ --�X LINE(Y) _-_--- -�-� �""$2.10 -'(6)"'""_ ._. _...._.....; ___... STATE UNEMPLOYMENT 5.60% X UNE(1) $27.92 (7) FEDERAL UNEMPLOYMENT 0.00% X LINE (1) $3.90 (8) . . TRAVEL ALLOWANCE OR SUBSISTENCE (9) TOTAL: LINES(1)+(2)+(3)+(4)+(5)+(6)+(7)+(8)+(9) $811.92 (10) 20%X LINE (10) $182.36 (11) GRAND TOTAL LABOR: LINES (10) + (11) $074.30 (12 ) - - Spread Footer Lighting " INSURANCE, TAXES : 109.06(b) INSURANCE: L 1.80 % X LINES (12) + (20) + (28) ] TAXES TOTAL: LINES (13) + (14 ) 10% X LINE (15 ) GRAND TOTAL FOR INSURANCE, TAXES: LINES (15) + (16 ) MATERIALS : 109.06 ( c ) TOTAL MATERIALS 12% X LINE (10 ) GRAND TOTAL MATERIALS: LINES (18) + (19 ) EQUIPMENT : 109.061 d) $30.57 (13) (14) $30.57 (15) $3.06 (16) $33.83 (17 ) $518.70 (18 ) $62.2,4 (19 ) $580.94 (20 ) CONTRACTOR OWNED EQUIPMENT: MACHINERY OR SPECIAL EQUIPMENT BLUE BOOK ADJ. MO. RATE ! 178 HRS. BLUE BOOK OPERATING RATE / HR BLUE BOOK TOTAL COST PER HOUR NO. OF HOURS EXTENSION SERVICE TRUCK 1 1 $9.13 $25.08 $34.19 BUCKET TRUCK' 2 1 $24.14 $25.21 $49.36 LINE TRUCK 3 543.81 $37.86 $81.67 DUMP TRUCK 4 1 $12.02 523.24 $35.25 SIGN TRUCK 5 $56.10 111.10 $114.00 LOOP TRUCK LESS SAW 6 $21.88 553.47 $75.35 PICK - UP TRUCK 7 $4.39 $12.13 $16.52 TRUCK CRANE-15 TON 65 FT., 6X4, DSL 8 1 $43.50 $42.42 $06.92 SACKHOE - CASE # 580 L, 90 HP, 1.03 CYO,1 9 1 $15,05 $17.09 $32.74 TRENCHER-DIVd#6510, W/SACKHOE 10 1 $17.64 $14.34 531.98 4 $127.90 . TRENCHER-DAN#4010 /4500, W/BACKHO 11 $14.80 511.48 $26.36 TRENCHER-DNV#3610l3700 72 59,94 58.14 $18.08 BORING MACHINE -VERMEER# D24MM W 13 587.67 $162.01 $249.88 FIBER OPTIC CABLE VAN WITH O,T.O.R. 14 $12.42 523.27 $35.69 FIBER OPTIC Fl1610N SPLICER LESB VEF 15 58.33 $7.22 $15.55 HYDRAULIC EXCAVATOR-GRADALL G3-R 18 $37.BB $37.71 576.40 HYDRAULIC EXCAVATOR -CAT E 1201312 C 17 526.83 $23.0 . $50.79 LOADER -SKID STEER B/C#773-T 18 $10.77 $11.58 322.33 LOADER -SKID STEER B/C#883 10 $12.00 $13.93 $28.02 LOADER -SKID STEER B/C#664 20 $13.83 $13.20 $26S3 ROCK BREAKER.Z.98, FOR SKID STEER 21 $4.32 $2.10 $5.42 TRACTOR ON HIGHWAY-6X4, 310 HP, DSI 22 $17.53 $31.39 $49.22 TRAILER, EQUIPMENT, - 3 AXLE, 20 FT., 7C 23 $9.52 57.15 $16.67 TRAILER, GOOSENECK, - 2 AXLE, 18 FT., 3 24 $6.93 $5.55 $12A6 TRAILER, EQUIPMENT, - 2 AXLE 6 TON 26 $1.38 $1.45 $2.83 -AIR COMPRESSOR -ROTARY SCREW, 185.1....26....... _$3.85 .._.. _.....$10.40 _.. $14.25 PAVEMENT BREAKER - 90 LB. 27 W.53 $0.45 $0.98 ROCK DRILL / CORING MACHINE 28 $0.97 $0.55 $1.62 CHIPPING HAMMER 29 $1.35 SC46 $1.80 '-- SMALL GENERATOR - 6 KW MAX. 30 1 SUS6 $3.66 $4.52 VIBRATORY PLATE COMPACTOR. MANUAL ( 31 1 54.30 $3.71 58,01 CUT-OFF SAW 32 $1,48 $17.32 $18.80 MAGNETIC DRILL (LESS BITS 33 51.05 $0,70 $1.75 CONCRETE SAW -35 HE 34 $5.87 1 $13.35 1 $19.22 TRAFFIC LINE REMOVER 35 $2.79 $3,21 $5.00 ARROW BOARD -DIESEL 36 $2.18 81.80 ARROW BOARD -SOLAR 37 $1.74 $0,50. 5224 CRASH ATTENUATOR FOR TRUCK MOUNT] 38 $3.97 $0.60 $4.57 HYDRAULIC BENDER 39 $10.39 $4.30 614.69 TRASH PUMP W/HOSE 6 GENERATOR 40 $5.10 $6.07 $11.17 -- TOTAL CONTRACTOR OWNED EQUIPMENT RENTED EQUIPMENT FUEL, LUBRICANTS, S TRANSPORTATION COSTS TOTAL: LINES (21) + (22) + (23 ) 12%X LINE (24) GRAND TOTAL EQUIPMENT : LINES (24) + (25) $127.90 (21) (22) (23) $127.90 (24) $15.35 (25) 6143.26 (26 ) PAGE 2 OF 3 Spread Footer Lighting PAGE.3 OF 3 SUBCONTRACTS : 109.06 M SUBCONTRACTS WEEK ENDING TOTAL SUBCONTRACTS WEEK ENDING (27) . .. .. .. TOTAL, SUBCONTRACTS TO DATE. (28) , _. 10%X LINE(2B), FOR FIRST $3,000.00 (29) 7% X BALANCE OF LINE (28); IF LINE (28) IS OVER $3,000 (30) GRAND TOTAL SUBCONTRACTS: LINES (28') + (29) A (30) (31) TOTAL: LINES (12). (17), (20). (26), & (31) $1,732.12 (32) . 1.1%BOND RATE BASED UPON LINE (32) (33) 10%X LINE (33) (3<) TOTAL EXTRA WORK : LINES (32) + (33 ) + (34) $1,732.12 (35 ) NOTES: I I ATTACH COPIES OF DAILY THE SHEETS SYOWINC IAEDR AND CONTHACTOPAWHED EQUIPMENT. y M ECONTRAOTOR8 USE PAGES I AND 3 AND PRIME CONTRACTORS ATSAOH TO PAGE ] 3) ATTACH BREAKDOWN FOR FACH WDMDVAL (THIS FORM MAY 11 PHOTOCOPIED OR REPRINTED AS NECEC6NY) Spread Footer Lighting Description MATERIALS gy Unit Description Unit Cost Total Cost 1 Lsum Misc. FormingMaterial $75.00 $75.00 1 Lsum Reber $68.00 $68.00 2.7 ds Concrete $130.00 $351.00 .... ........ 1 ---- - ------ .............. LSM ------- ---- ... =--=--------------- ------------------------------------ ------ Total Above Misc. Materials ( 5 %) -_------- ----------- ..----- ------------------------------------ Total Materials ---------------- ---------------- :----------------- ------------------ $494.00 $24.70. $518.70. Change Order No. 29 One- Way to Two -Way Street Conversion Division A & B Project No. 116-001 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. Patrick K. Wooden, P.E. Professional Engineer No. 10504741 CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion Division A & B Project No. 116-001 SUBJECT: Signing Changes ISSUE DATE: October 12, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Revise posted speed limits south of Bronson Street from 25mph to 30mph 2. Add NO RIGHT TURN ON RED signing along St Joseph Street The following sections of the Contract Documents are revised as a result of the above changes: 1. Bid/Proposal Form: Division A: Add 65 SF to Line Item No.131 SIGN, SHEET, WITH LEGEND 0.080 @ $14.00/SFT for a total addition of $910.00. Division B: Add 40 SIFT to Line Item No.232 SIGN, SHEET, WITH LEGEND 0.080 @ $12.50/SFT for a total addition of $500.00. Sheet 1 of 3 Change Order No. 29 One- Way to Two -Way Street Conversion Division A & B Project No. 116-001 No change required. The following sheets have been revised or issued as new sheets. Division A Part 2 of 2 Revision 6 Sheet 17 — Revised speed limit sign to 30mph Sheet 18 — Revised speed limit sign to 30mph Sheet 21 — Revised speed limit sign to 30mph Sheet 23 — Revised speed limit sign to 30mph Sheet 24 — Revised speed limit sign to 30mph Sheet 25 — Revised speed limit sign to 30mph Sheet 26 — Revised speed limit sign to 30mph Sheet 26-1 — Revised speed limit sign to 30mph Division B Part 1 of 3 Revision 17 Sheet 166 — Added "NTOR" Signs Sheet 167-A—Added "NTOR" Signs Sheet 168-A — Added "NTOR" Signs Sheet 169-A—Added "NTOR" Signs Sheet 170-A—Added "NTOR" Signs Sheet 185 — Changed Speed Limit Signs Sheet 186 — Changed Speed Limit Signs Sheet 187 — Changed Speed Limit Signs Sheet 188 — Changed Speed Limit Signs Sheet 189 — Changed Speed Limit Signs Sheet 190 — Changed Speed Limit Signs Sheet 191 — Changed Speed Limit Signs Sheet 195 — Changed Speed Limit Signs Sheet 196 — Changed Speed Limit Signs Sheet 197 — Changed Speed Limit Signs Sheet 198-A — Changed Speed Limit Signs Sheet 200 — Changed Speed Limit Signs Sheet 201 — Changed Speed Limit Signs Sheet 221-1 — Changed Speed Limit Signs Sheet 222 — Changed Speed Limit Signs END OF CHANGE ORDER NO. 29 Sheet 2 of 3 Project No. 116-001 Change Order No. 29— 10112116 �pV ik k- �7L CITY OF SOUTH BEND =' �y v - 1Se5 PROJECT NAME: One -Way to Two -Way Street Conversion —Division B PROJECT NUMBER: 116-001 Division A: Item No. Description Quantity Unit Unit Price Total Amount 232 SIGN, SHEET, WITH LEGEND 0.080 +40 +SFT $12.50 $500.00 OWNER: City of South Bend CONTRACTOR: Rieth-Riley Construction Signature Date Sign i� Date $500.00 Sheet 3 of 3 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/01/16 Name Toy Villa Department Engineering BPW Date 11/08/16 Phone Extension 5920 Required Prior to Submittal to Board Legal ® Attorney Name Michael Schmidt Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ® Change Order No. 8 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control ❑ Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Required Information Reith Riley Construction Co., Inc. —ETYes ® No If Yes Approved by Purchasing ❑ MBE ❑ WBE ❑ No ❑ Yes Name of Company South Bend One Way to Two Way Conversion — Division B 116-001 2015 TIF Bond Amount Terms of Contract Purpose/Description Approval of Change Order #8 ❑ Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verifv. Iran. etc Amount of N Increase $ 58,442.42 ❑ Decrease $ Previous Amount Current Percent of Change New Amount Total Percent of Change: Copy Original ® ❑ ® ❑ ® ❑ 17 0.34% $ 17,306,460.73 7.28% Dispersal After Approval Michael Divita I oy Villa Beth Leonard,