Loading...
HomeMy WebLinkAboutChange Order No. 2 - 2016 Curb & Sidewalk - Premium Concrete1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS November 8, 2016 Jeremy Jankoviak Premium Concrete 712 Richmond St. Elkhart, IN 46516 RE: Change Order No. 2 — 2016 Curb and Sidewalk Construction Project No. 116-029 Dear Mr. Jankoviak: PHoNE 574/235-9251 FAX 5741235-9171 The Board of Public Works, at its meeting held on November 8, 2016, approved the above referenced Change Order for an increase of $13,104.50, bringing the current contract amount to $419,726.70. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure c: Toy Villa, Engineering Terri Swift, Streets GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: CITY OF SOUTH BEND, INDIANA SourHeE� DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER ` 1b65 10/4/2016 116-029 2016 Curb and Sidewalk Construction SUBJECT OF CHANGE ORDER: Sod for Back Side of Walk ,Removal, Tree 24"-36" The contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project $ 46,872.20 $ 406,622.20 QX Increased Decreased $ 13,104.50 $ 419,726.70 3.22 % 16.67 % Original contracted completion date/time 10/13/2016 Extension of date/time by previous change orders 7 days Date/time extension by this change order 0 days New completion date/time 10/20/2016 CONTRACTOR orCtrac or Signature Printed Name and Title Premium Concrete Company Name 712 Richmond St Address Elkhart, IN 46516 City, State, Zip RECOMMEND D FOR APPROVAL vff CONST TION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: ; / jw , %/ L 'L n Gary Q. Gilot, President M. Elizabeth A Maradik, Member Therese J. Do au, ember James A. Mueller, Member City of South Bend Project No. 116-029 OWNER: City of South Bend ENGINEER: City of South Bend Engineering Roger T. Nawrot, P.E. Professional Engineer No. 60016991 CONTRACTOR: Premium Concrete PROJECT: 2016 Curb & Sidewalk Construction Project No. 116-029 Change Order No. 2 - 10/24/16 SUBJECT: Clarifications and Revisions to Contract Documents ISSUE DATE: October 24, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Extra removal of curb and sidewalk. The following sections of the Contract Documents are revised as a result of the above changes: SPECIFICATIONS XXIV. Concrete Sidewalk, 4-inch B. Additions.: "Additional sidewalk replacement. XXVIII. Concrete Curb B. Additions.: "Additional curb replacement. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 10/29/16 Name Toy Villa tip% Department Engineering BPW Date 11/08/16 Phone Extension 5920 Required Prior to Submittal to Board Legal ❑ Attorney Name Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type —Required for All Submissions ❑ ❑ Agreement Professional Services ❑ Contract ❑ l Pro osa p El Addendum ❑ Resolution ❑ ❑ Bid Opening Quote Opening ❑ Bid Award ❑ Quote Award ❑ Req. to Advertise Title Sheet ® Change Order No. 2 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control ❑ Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Required Information Concrete No If No ❑ Yes Name of 2016 Curb and Sidewalk 116-029 iwvri 202.0619.431.31.06 Amount $ Terms of Contract Purpose/Description ❑ Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) Required For Change Orders Oniv Amount of 29 Increase ❑ Decrease Previous Amount $ 4C Current Percent of Change: 3.22 New Amount $ 41 Total Percent of Change: 16.6 Copy Original ® ❑ ® ❑ Terri Swift Toy Villa 13.1 uispersal Atter Approval