Loading...
HomeMy WebLinkAboutContract - INDOT - Traffic Signal Maintenance1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND_ INDIANA 46601-1830 OUTH gib' F ,2 U' C W PEACE _, a 1865 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS October 25, 2016 ATTN: Alan Holderread The Indiana Department of Transportation LaPorte District Office 315 E. Boyd Blvd. LaPorte, IN 46350 PHONE 5741235-9251 FAX 574/235-9171 RE: Signal Maintenance Contract for State Highways in and near the City of South Bend. Dear Mr. Holderread: The Board of Public Works, at its meeting held on October 25, 2016, approved the above referenced contract. Enclosed please find the original of the contract for INDOT's signature. Please obtain their signature and return a copy of the agreement to our office and retain a copy. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure c: Ed Gleckler, Manager, Traffic & Light Bureau GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU C O N T R A C T TRAFFIC SIGNAL MAINTENANCE FOR STATE HIGHWAYS IN AND NEAR THE CITY OF SOUTH BEND SAINT JOSEPH COUNTY, INDIANA EDS No. A249-17-S160014 THIS Contract by and between the STATE OF INDIANA, through the INDIANA DEPARTMENT OF TRANSPORTATION hereinafter referred to as INDOT, and the CITY OF SOUTH BEND hereinafter referred to as the CITY, for inspection, routine maintenance, and non -routine maintenance of traffic signals, noted in Exhibit "A", on INDOT maintained highways in the CITY and surrounding area. W I T N E S S E T H: WHEREAS, this Contract is entered into to provide for routine and emergency maintenance of the entire traffic signal system in the CITY and surrounding area and to facilitate the movement of traffic therein, and; WHEREAS, the Exhibits attached and made a part of this Contract may be revised from time to time by mutual written consent of the parties to this Contract or as otherwise provided in the Contract, and; WHEREAS, subject to INDOT approval, the CITY shall determine the adjustment and timing of all traffic signals on State roads in the City of South Bend and surrounding areas, and; WHEREAS, the CITY shall be allowed to modernize signalized intersections on State roads upon written request and approval by INDOT, and; WHEREAS, all equipment installed at intersections with State roads, except as specified in "Special Signal Systems" shall become the property of INDOT after installation, and; WHEREAS, the CITY shall have a staff of technicians or a Contract with an INDOT pre -qualified signal Contractor capable of properly and adequately maintaining and inspecting the traffic signals on State roads, which are covered by this Contract, and; WHEREAS, the parties to this document agree that this Contract will be in the best interest of safety and convenience for the public, and therefore to the mutual benefit of both parties; IT IS THEREFORE AGREED BY AND BETWEEN INDOT and the CITY that the CITY agrees to perform or have performed the work described herein and INDOT agrees to compensate the CITY in accordance with the terms and conditions as follows: Page I of 53 Pages 1. TERM OF CONTRACT a. Effective date: This Contract shall take effect on January 1, 2017. If the Contract has not been approved by the Attorney General by that time, then the Contract shall take effect on the first day of the month that is at least thirty (30) days after the Contract is approved by the Attorney General, or an authorized representative. b. Termination date is the earliest of: 1. This Contract shall terminate on the date a lack of funding determination is made by the State Budget Director as provided in Section 19 of this Contract. 2. If the State determines there has been an ethics violation, this Contract shall terminate on the date notice is given to the CITY as provided in Section 16 of this Contract. 3. This Contract for maintenance of traffic signals shall be for a term of four (4) years. If renegotiations of a new Contract are not completed by the expiration date of the Contract, this Contract may continue in force at the current rates, by mutual written consent of both parties until a new Contract is signed and approved. 4. This Contract may be terminated by either party on the one (1), two (2), or three (3) year anniversary of the Effective date described in Section l.a., provided that the party seeking to terminate gives at least forty-five (45) days notice. 2. PRE -CONSTRUCTION MEETING Prior to the first work performed under terms of this Contract, the CITY shall schedule a Pre -construction Meeting at a time and place convenient to the INDOT La Porte District Traffic Engineer (the DTE) . If the CITY intends to utilize a Contractor for portions of the work, representatives of the Contractor shall attend the meeting. INDOT will provide the CITY with the names and telephone numbers (or other electronic means of contact) of INDOT personnel that may be contacted. At the pre - construction meeting the CITY shall submit to the Engineer, as follows: a. Schedule of operations for review and approval. This schedule shall consist of the hours of work for a normal work day. b. The method or handling, transportation, and storage of the INDOT materials. C. List of the traffic signal technicians with copies of Level II Traffic Signal Technician certificates and resumes detailing the work histories of the technicians. This list shall also indicate if the technician Page 2 of 53 Pages will be responding to emergency calls or performing work inside controller cabinets and can perform the requirements of a Traffic Signal Technician as defined by this Contract (see EMERGENCY RESPONSE MAINTENANCE). d. Contact person - This shall be a local person with whom the DTE will discuss and route all work. This person is expected to understand all aspects of traffic signals. e. Phone numbers for the CITY office (business, emergency, and other electronic means of contact), answering service, technicians, and supervisor responsible for the work included in this Contract. f. List of all Subcontractor(s) with names, phone numbers, and job duties of the people that may be performing work on this Contract (Loop cutting, anchor bolt welding, fiber optic work, etc.). 3. MAINTENANCE OF TRAFFIC a. Maintenance of traffic shall be in accordance with Section 801 of the IIVD0T Standard Specifications and INDOT's Work Zone Traffic Control Guidelines: Construction, Traffic, Maintenance and Utility Operations 2013. b. If unusual working conditions occur, the CITY shall provide the DTE a proposal for the traffic control measures to be used, subject to approval. If the CITY finds it necessary to temporarily occupy part of a shoulder or the traveled width of pavement and restrict traffic, the CITY shall provide, at its own expense, all cones, barrels, arrow boards, barricades, lights, flaggers, signs, and other traffic control devices as specified, and as deemed necessary by the DTE. c. Construction warning lights shall be in accordance with the applicable requirement of 801.11, except the plastic drums or construction warning signs used only for maintaining traffic during daylight hours will not require a Type A low intensity flashing warning light. d. When aerial work is being performed, traffic shall not be permitted to pass beneath personnel working overhead. When aerial work is being performed which occupies a portion of the traveled way, a minimum of one flagger will be required. All equipment which is used on or near a traveled way shall be equipped with revolving amber warning lights. These warning lights shall be a minimum of 8 inches in diameter. Such lights shall be clearly visible to approaching vehicles through all phases of the equipment operation for a minimum distance of 500 feet. Strobe warning lights may be used provided that they have and output of Page 3 of 53 Pages 2,000,000 candlepower (2,000, 000 cd) during daylight hours and 1, 000, 000 candlepower (1, 000, 000 cd) during other hours. e. Identification placards shall be affixed to all equipment. 4. SCHEDULE OF OPERATIONS a. The work day shall consist of any S consecutive hours between 6:OOAM and 5:30PM. A work week shall consist of 40 hours on Monday through Friday. All scheduled and non -emergency activities shall occur during normal work days, unless otherwise approved. work outside of these hours or days will only be permitted with written request specifying where, when, and what work is to be done as described in Exhibit "H", which is attached and made a part of this Contract. Such request shall be submitted two work days in advance and must be approved by the Engineer prior to any work. If the Engineer does not approve this request, the work shall be rescheduled to a time approved by the Engineer. Each day outside the work week that is requested and approved for work shall also be considered a work day. b. All visits by the CITY to any intersection shall be recorded on the maintenance card located in the controller cabinet. INDOT will provide additional blank maintenance cards to the CITY to supplement existing full maintenance cards or to replace those maintenance cards that have been destroyed or become lost. The traffic signal maintenance card found in each cabinet shall be signed by the technician in charge of the lamp replacement, aerial inspection, or loop sealing operation. This record shall include the date, military time, initials and one of the following notations: Relamp, Loop Replacement, Aerial Inspection, or other description to indicate the work performed. The Relamp and Aerial Inspection report shall also be used to document the work performed. 5. SPECIAL SIGNAL SYSTEMS a. Wherever the CITY has installed signal systems utilizing combination traffic signal/streetlight poles or specialized controller equipment on State Highways, and where or when the system is controlled and operated by the CITY, all specialized materials, controllers, conduit, cabling, and hardware uncommon to INDOT shall be furnished, maintained, controlled and operated by the CITY. All unique material furnished by the CITY shall remain the property of the CITY. The CITY shall maintain an adequate supply of all unique materials to properly maintain said signal systems on State Highways. Page 4 of 53 Pages b. As long as a highway remains under the jurisdiction of INDOT, if the control, operation, or maintenance of a traffic signal on a special signal system is not satisfactory to INDOT, said signal will be removed from the special signal system by the CITY and placed on a separate system controlled by INDOT. 6. DEFINITIONS a. CITY Holiday: 1. the days annually approved by the South Bend Board of public works as holidays for CITY employees. 2. shall be defined in Exhibit "F" attached and made a part of this Contract. 3. updated annual lists shall be provided without affecting status of this Contract. 4. is prescribed as beginning at 6:00 a.m. of the normal work day it replaces and ending at 6:00 a.m. the next day. Holiday rates apply only during this time frame. S. CITY holidays are overtime pay. b. Saw Slot for Roadway Loop and Sealer: Includes, cutting the saw slot, installing loop wire, supplying and installing the cord and sealer, and splices to existing cable. c. Signal Bulb Wattage Table: For traffic signal bulb change -out purposes (routine or non -routine) the table in Exhibit "G" gives the proper lamp/wattage for various types of indications. Light emitting diode (LED) lamps shall replace incandescent bulbs when this is feasible. d. Skilled Labor: Electrician, Foreman, Equipment Operator e. System Retiming: INDOT will perform a coordination timing analysis in conjunction with a 4 year schedule. INDOT will provide the CITY with updated timing sheets showing the implemented changes. f. Traffic Signal Technicians: 1. must hold a Level II Traffic Signal Electrician certificate which. has been granted by the International Municipal Signal Association (IMSA). All electrical wiring terminations and splices; controller and cabinet set-up; and testing, review, and turn -on of all operational apparatus at each location shall be done by or in the presence of and under the responsible charge of an employee of the CITY who holds a Level II certificate. Supervision of non- electrical, traffic signal related construction work and traffic control shall be done by a person holding a Level I Work Zone Page 5 of 53 Pages Traffic Safety Specialist certification which has been granted by the IMSA, or an equivalent certification approved by INDOT. The CITY shall have a minimum of two (2) Traffic Signal Technicians each with fully equipped vehicles (see Exhibit "N") available at all times to satisfy the emergency response maintenance requirement. Each vehicle shall also be equipped with the proper material, tools, and meters to perform all emergency maintenance activities. 2. Each technician shall be able to diagnose and repair malfunctions with the equipment listed below: i. TRAFFIC CONTROLLERS Eagle Models EPAC 300 Econolite Models ASC - 8000 ASC/2M - 1000 ASC/2(S) - 1000 ASC/2(S) - 2100 ASC/3 - 1000 ASC/3 - 2100 Peek Models 3000E M3000 ATC - 1000 TCT Models LMD 8000 MDM 100 ii. CONFLICT MONITORS EDI Models NSM-12L SSM-12L MMU-16 MMU-16LE MMU-16E / MMU-16Eip (Ethernet Capable) Peek Models 12ELRB DD 831B TCT Models LSM 12 LNM 12 Reno A&E Models MMU-1600 MMU-1600D MMU-1600GE iii. TIME CLOCKS Eltec Models TC 12 TC 14 NTC - 17E - IAC 3. INDOT may install other brands and models of equipment.. The CITY will be issued manuals for such new equipment. 4. TRAFFIC SIGNAL TECHNICIAN shall understand: i. How to install timing values into controllers by hand and via laptop. ii. How time based coordinators regulate actuated controllers with background cycles within a coordinated signal system. iii. Detector input routing and switching throughout the cabinet. Page 6 of 53 Pages iv. Common aspects of signal phasing including but not limited to split phasing and lead -lag phasing. v. Volume Density settings. 5. Field repairs of solid state equipment will be limited to replacement of faulty equipment and returning such equipment to the INDOT in exchange for replacement equipment. g. Trucks: 1. Pick-up truck used by unskilled labor or as parts truck. 2. Aerial truck- vehicle used and charged for as "Base Vehicle" tech (skilled labor) dispatches; equipment that is capable of lifting one or more workers and material for the purpose of overhead work. 3. Boom/Auger Truck: Truck mounted equipment capable of lifting and setting poles or mast arms, and drilling holes. h. Unskilled Labor: Common Laborer, Escort Service, Flag Person 7. INVENTORY REPORTING a. INDOT will provide to the CITY a "Stock Transfer Report" listing materials and equipment provided to the CITY. A list of the items that the department shall furnish to the CITY is listed in Exhibit "L" INDOT Provided Materials. A received slip shall be verified and signed by a delegated representative of the CITY and given to INDOT. INDOT will provide to the CITY a "Stock Transfer Report" listing materials and equipment returned by the CITY. A returned slip will be verified and signed by a representative of INDOT and given to the CITY. b. The CITY shall supply an itemized report of all material supplied by INDOT that is in the following status: 1. Stock on hand at beginning of period. 2. Stock obtained during the period. 3. Stock used during the period. 4. Stock on hand at the end of the period. 5. Stock returned to Indiana Department of Transportation. c. Such report shall reflect the date and where INDOT materials were used, received, or transferred. Reports shall be submitted within 14 days following the let day of the months April, July, October, and January for all material reflecting activity for that three month period. At the end of the Contract, reports for all material shall be submitted. d. In addition, the CITY will be required to supply the locations where the materials are used, by type of material. The format of this report shall be determined prior to the effective starting date of this Page 7 of 53 Pages Contract. Reports shall be submitted within 14 days following the 1st day of the months April, July, October, and January for all material reflecting activity for that three month period. e. The CITY shall attach a green tag on all damaged or defective traffic signal equipment returned to INDOT. This green tag shall be completely filled out including the location where the equipment was in operation and a description of the equipment's problem. INDOT will provide green tags to the CITY. 8. SCHEDULED ROUTINE MAINTENANCE a. "Routine Maintenance" shall be performed by the CITY (or its Contractor) upon all existing traffic signals as listed in Exhibit "A" and any others which may be installed or taken over by INDOT during the effective period of this Contract. b. "Routine Maintenance" shall include the repair or change -out of the following traffic signal equipment, due to any reported Operation Malfunction during the hours of a normal work day, from the daily start time up to, and including one (1) hour before the end of a normal work day: 1. Traffic Signal Controller 2. Detector Amplifiers and Receivers 3. Replacement of burned -out signal bulbs 4. Load relays or switches 5. Conflict Monitors or malfunction management unit, Preempts, Coordinators, etc. 6. Power Outages 7. All equipment comprising interconnect systems 6. optically Programmable Signal indications c. "Routine Maintenance" of all types of installations shall also include: 1. Respond to all calls of reported malfunctioning traffic signals within two (2) hours. 2. Remove all malfunctioning parts and replace same with new or reconditioned parts to restore proper functioning, except for emergency vehicle preemption equipment. Emergency vehicle preemption equipment, causing the traffic signal to malfunction, shall be disconnected from the controller only. d. The CITY shall have available a portable two (2) through eight (8) phase NEMA Digital Controller Tester with harness for the field testing of all digital traffic signal controllers manufactured in compliance Page 8 of 53 Pages with NEMA Standard TS-1-1976 dated November 6, 1975 including any subsequent revisions. The CITY shall also have available a portable two (2) through eight (8) phase NEMA Digital Controller Tester with harness for the field testing of all digital traffic signal controllers manufactured in compliance with NEMA Standard TS-2-1998 including any subsequent revisions. e. The CITY shall keep and provide records of all work performed in making routine repairs. The CITY shall submit a "Signal Work Activity Report" (Exhibit "C" attached and made a part of this Contract) for each intersection where work was performed, attached to a properly executed monthly invoice voucher. f. The CITY shall complete the form shown in Exhibit "D" attached and made a part of this Contract in case of conflict monitor or malfunction management unit flash. Reports shall be submitted with the monthly invoice. 9. SCHEDULED MAINTENANCE The CITY shall schedule periodic visits to each intersection shown in Exhibit "A" at a frequency determined by the time periods designated on the Preventive Maintenance Check List, shown as Exhibit "B" attached and made a part of this Contract. The CITY shall perform all work as noted on the Preventive Maintenance Check List for each intersection. The work shall be done by or in the presence of and under the responsible charge of an employee of the CITY who holds a Level II Traffic Signal Electrician certificate which has been granted by the IMSA. a. Loop Testing. This is for testing and recording all results of each loop detector lead-in cable. This shall include all labor, equipment, materials, and traffic control required to accomplish this work. This work shall be performed by a Traffic Signal Technician and completed between February 1st and May 315z. This work shall include testing each Lead-in and recording the results for meg-ohm, voltage, resistance, and micro -henry values and tag each lead-in cable whose tag is missing, not securely attached or not easily read as needed (see Exhibit "I" Detector Loop Tagging Table Procedure). If there are any known loops cut out of the loop system for that lead-in, the `CUTOUT' box shall be marked. If the loop is operating regardless of loops cut out, the `WORKS' box shall be marked. Loops that test poorly but still operate should be left working. All values shall be entered on the Loop Page 9 of 53 Pages Testing Table in Exhibit "J". If loop systems are found defective and will not operate, the associated phase may need to be placed on recall and timings adjusted as directed by the Engineer. The Contractor shall inform INDOT of non-functional loops verbally and submit the Loop Testing Table reports with the monthly updates. b. Annual Signal Bulb Change -out, Lens Cleaning and Aerial Inspection. 1. This includes cleaning all lenses, replacement of all signal and cabinet bulbs, cabinet filter, and inspection of aerial installations. This work shall consist of replacing traffic signal lamps, aerial inspection, and making minor repairs to traffic signals and flashers at the locations shown in the Exhibit "A". Minor work shall include aligning signal heads and signs. The CITY shall replace all signal bulbs with new signal bulbs and also clean the lenses and reflectors in conjunction with the annual signal bulb change -out. A Signal Bulb Replacement and Aerial Inspection sheet needs to be filled out for each location where work was completed (refer to Exhibit "0"). 2. Signalized intersections included in other Contracts and agreements will not be included in the lamp replacement and inspections portion of this work. A listing of the locations which will require lamp replacement and aerial inspection is shown in Exhibit "A". This work shall be performed between April and September of each year that this Contract is effective. 3. The CITY shall provide all lamps necessary to complete this work. All 150 Watt bulbs shall be P25 or A23 size and shape. Lenses for each type of signal indication shall be washed on both the inside and outside with an approved cleaning solution. The reflector shall be washed with the same solution. Both lens and reflector shall be wiped dry with no smears or residue remaining on the surfaces. Lamps shall be installed such that the filament of the lamp appears to be in the shape of a U. This adjustment shall be made by means of rotating the socket. Lenses which are semi -opaque, cracked, or include holes shall be replaced. Visors or louvers which are missing or damaged shall be replaced. The District Traffic Engineer shall be contacted for availability of replacement visors. No additional payment will be made for repairs of this nature. 4. If INDOT has installed light emitting diode (LED) indications in place of the bulb/reflector/refractor assembly, the CITY shall clean Page 10 of 53 Pages the lens surface of the LED indication. 5. Signal head mounting hardware (i.e. weather head, balance adjuster, mid -mast assembly, disconnect hanger, horizontal pipe arm and clamps) found to be worn or damaged shall be noted by the CITY and the same reported in writing to INDOT. Wires shall not be closed in doors. Sockets shall not be tightened into terminal strips. Lamps shall not be overtightened or undertightened. Aligning of signal heads will not be permitted unless the appropriate set screw, nut, bolt, or screw is also tightened. A tool appropriate for tightening shall be used for aligning signal heads, replacing lenses, replacing visors, or making adjustments. The repairs shall be made as ordered by INDOT as non -routine maintenance and charged as non -routine maintenance. 6. Signal bulbs for optically programmable signal indications shall not be changed -out annually. They shall only be changed -out in case of a burned out or destroyed bulb. In the case of burned out bulbs for optically programmable signals, all costs shall be included in "Routine Maintenance" unit rates. c. Red Arrow Signal Indications In accordance with the 2011 Indiana MUTCD, red arrow signal indications shall be installed at three -section head protected left -turn signals as follows: 1. When it is feasible to replace a circular red incandescent signal indication with an LED indication, the circular red shall be replaced with a red arrow indication. 2. When it is necessary to replace a circular red LED signal indication, the circular red shall be replaced with a red arrow indication. Any existing "LEFT ON ARROW ONLY" signs shall be removed at the time a circular red indication is replaced with a red arrow indication. A standard "LEFT ON GREEN ARROW ONLY" (R10-5) sign is not required but may remain in place. d. Conflict Monitor Change -out Testing The CITY shall test all conflict monitors or malfunction management units installed on traffic signals listed in Exhibit "A" annually. The following information shall be supplied by the CITY to INDOT upon completion: 1. CITY warrants to INDOT that each monitor tested by CITY Personnel Page 11 of 53 Pages still meets or exceeds the recommended values the test equipment manufacturer (NEMA) recommends. 2. CITY provides INDOT with a copy of the annual certification of CITY's testing equipment. 3. CITY provides INDOT with test results for each State conflict monitor or malfunction management unit tested along with the date tested and the name of the person conducting the test. e. CITY provides INDOT with copy of the date and name of person who removed each conflict monitor or malfunction management unit from cabinet. 5. CITY provides INDOT with copy of the date and name of person who installed each conflict monitor or malfunction management unit in cabinet. A schedule for testing shall be supplied to the CITY by INDOT and shall be accomplished during the month of January. The monitor change out shall be done from July through the end of September. Refer to the Conflict Monitor Change Out Procedure in Exhibit "M". 10. NON -ROUTINE MAINTENANCE a. "Non -Routine Maintenance" shall be work performed on INDOT owned traffic signal equipment, other than the "Routine Maintenance" items, at anytime as a result of traffic accident, vandalism, storm or further damage prescribed as an act of God. This work often consists of work as directed by the Project Supervisor/Engineer through WORK ORDERS. If the traffic signal installation has emergency vehicle preemption that is the cause of the reported malfunctioning or damaged traffic signal, preemption repairs are not covered under this Contract. In lieu of repair to the preemption equipment, disconnection of the preemption equipment from the controller is appropriate. If there has been a knock down of traffic signal apparatus that contains emergency vehicle preemption equipment, an attempt should be made, using normal diligence, to salvage the preemption equipment for re -use. b. Additionally, "Non -Routine Maintenance" shall be the proper response to reported damaged traffic signal installations. In the event of extreme emergency problems, it may be necessary to solicit the immediate assistance of local law enforcement agencies until such time that emergency repairs can be accomplished. c. Damaged, inoperative traffic signals shall not be left unattended. A Page 12 of 53 Pages signal may be placed in a flashing mode while repairs are being completed. In the performance of Non -Routine Maintenance under terms of this Contract, the CITY shall: 1. Keep and provide records of all work performed in making Non - Routine repairs. 2. Submit a "Signal Work Activity Report (Exhibit "C" attached and made a part of this Contract) for each intersection where work was performed, attached to a properly executed monthly claim voucher. 3. Make no alterations of existing installations unless authorized in writing by INDOT except in cases of emergency when a traffic signal is out of operation and no one from INDOT can be reached to authorize the repairs in which case, the CITY shall make the necessary repairs and submit damaged equipment to INDOT as evidence of material used to keep the signal in operation. 4. Provide a copy of the Police Department Accident or Officers Report in reference to damage to traffic signal installations that INDOT may attempt recovery of damages. 5. Respond to all calls of reported malfunctioning traffic signals within two (2) hours. d. INDOT shall inspect all work performed in making Non -Routine Maintenance repairs, and recommend full, partial or no payment. INDOT will not pay for travel time to and from any intersection. 11. TIME BASED AND INTERCONNECT SYSTEMS The CITY shall check that all interconnected and time based systems are functioning correctly on a biannual basis in conjunction with the periodic "Preventive Maintenance" for Actuated Signal Controllers. One system timing pattern shall be checked per visit on an alternating basis. If a system timing pattern that is not currently in operation is desired to be checked, the timing pattern may be changed to the desired timing pattern, however, this change must occur between the hours of 10:00 a.m. and 2:00 p.m. At each visit, the CITY shall check each local intersection controller to ascertain that the controller is maintaining the correct time. If the time check is negative, the CITY shall enter the correct time in the controller. Additionally, for each system timing pattern checked at the visit, the CITY will check that the local intersection controller is receiving the transfer command from the master control unit and is responding to that command. If it is Page 13 of 53 Pages determined that the communication between the master and secondary is not functioning properly, the CITY shall determine the cause of the communication error. Major repair or replacement of interconnect cable shall be performed during normal working hours only. Splice repair will be paid on the basis of labor and equipment used, (straight time only). Refer to the Fiber Optic Specifications in Exhibit "K". 12. MATERIALS a.INDOT shall furnish all standard major signal equipment and materials used in making repairs or replacements, and in the performance of all maintenance on INDOT owned and controlled signals. Such materials shall include, but will not be limited to the following: signal heads or faces (including component parts), signal cable, slip fitters, pipe arm assemblies, span wire hanger assemblies, controllers, including flashers, detectors, conduit and fittings, signal metal poles and/or mast arms, pedestal pipe, cast iron or aluminum base (with anchor bolts, if required). b.The CITY shall stock and furnish all necessary specialized materials., controllers, conduit, cabling, coordinating equipment, combination traffic signal -street light poles, and hardware uncommon to INDOT to adequately maintain the specialized traffic control equipment installed on INDOT highways at intersections listed in Exhibit "A". c.Any minor material parts not furnished by INDOT (such as electrical or friction tape, Sta-Kons, clips, wire, small nuts and bolts, screws and washers), shall be furnished by the CITY at no extra cost to INDOT. d. The CITY shall be accountable and responsible for any materials and equipment furnished by INDOT that are not considered expendable items (controllers, controller cabinets, poles, detectors, modules, etc.). e.All damaged equipment removed from signal installations covered in this Contract shall be stored by the CITY at its facilities for pick- up by INDOT. f. Exhibit H through Exhibit 0. These forms shall be utilized as needed. 13. ADDITIONS OR DELETIONS OF WORK LOCATIONS a. INDOT shall notify the CITY in writing of any addition or deletion of traffic signal installations to Exhibit "A", and the effective date of the addition or deletion. b. Within the City of South Bend and surrounding areas, all new traffic Page 14 of 53 Pages signals which are to be installed by private owners on state .roads by agreement with INDOT shall be submitted to the CITY for their information prior to INDOT granting permission for such installation. c. INDOT shall coordinate the design of new signals or the modernization of existing signals on State roads with the CITY to insure that they are compatible with the CITY'S Traffic Control System. d. The CITY shall be allowed to attend the final inspection of newly installed or modernized traffic signals for which the CITY shall provide maintenance under this Contract. e. The CITY shall accept a new signal installation for maintenance after INDOT has furnished the CITY a copy of its Form I.C. 63GA (Completion Report) for installation and a copy of the executed Form T-38a (Change Order for Signal Maintenance Contract) indicating that the new signal is installed in accordance with the current INDOT Standard Specifications and is approved as an addition to this Contract. Said additions to the Contract must be approved by the "CITY's Board of Public Works", prior to acceptance. 14. RIGHTS AND RESERVATIONS a. INDOT reserves the right to enter at anytime onto any signalized intersection covered under this Contract listed in Exhibit "A" or into any controller cabinet for inspection, alteration or change to affect emergency repairs, modifications or to correct malfunctions. b. No change, which will alter its design, phasing or functional operations, will be madeto any traffic signal without authorization from INDOT La Porte District Traffic Engineer. c. In the event that INDOT awards a separate Contract to modernize, modify, rebuild or remove any signal installation covered under this Contract, INDOT reserves the right to determine whether its Contractor or the CITY will be responsible for the maintenance of the existing and/or temporary signal installation during the term of the modernization or modification Contract.. d. INDOT reserves the right to inspect stockpiled INDOT furnished signal equipment being stored by the CITY (or its Contractor) with two (2) days written notice supplied to the CITY by INDOT. e. The CITY shall maintain existing signalized intersection(s) and equipment as long as they are in service, unless otherwise directed. The CITY shall assume maintenance of new signalized intersections(s) and equipment when notified by INDOT. These additions and deletions Page 15 of 53 Pages may be communicated verbally by INDOT. INDOT, within five (5) working days of the verbal order, will provide a follow up letter by fax, email or mail. 15. INSURANCE a. The CITY and/or its Contractor shall carry protective liability insurance coverage for all work covered under this Traffic Signal Maintenance Contract. The insurer shall be a company holding a certificate of authority issued by the Indiana state Insurance Commissioner to do business in the State. Prior to commencing work under this Contract, the CITY or its Contractor shall file with INDOT a certificate of insurance on an acceptable form, which shall serve as evidence that the CITY or its Contractor has obtained insurance in accordance with the following requirements and minimum limits of coverage. i. A limit of not less than $100,000.00 for all damages arising out of bodily injury or death in any one occurrence. ii. A limit of not less than $100,000.00 for all damages, arising out of an injury to or destruction of property in an occurrence, an aggregate limit of not less than $300,000.00 for all damages arising out of injury or destruction of property during thepolicy period. b. such insurance shall hold harmless and indemnify INDOT from, for and against any claim of any person in tort, Contract, or otherwise arising out of the acts or omissions of the CITY in the execution and implementation of the traffic signal maintenance (routine and/or emergency) in compliance with the stipulations of this Contract. c. If the CITY is self -insured under the provisions of Indiana law, the CITY shall provide protection for public liability and physical damage arising from the performance of its obligations under this Contract in amounts not less than those stated in A. and B. above. In order to hold harmless and indemnify INDOT, the CITY will at its sole cost and expense keep such self-insurance in full force and effect during the term of this Contract or will, at its option, provide equivalent insurance with a responsible carrier as stated above. d. Unless otherwise directed by INDOT, it shall be the responsibility of the CITY to maintain the old signals and its related equipment as long as they remain in service and to assume maintenance of the new Page 16 of 53 Pages signal equipment after it has been accepted by INDOT and after it is so directed by INDOT. In the event the CITY is requested by INDOT to respond to a reported malfunctioning traffic signal that is being temporarily maintained by others, the CITY shall be reimbursed for all calls at non -routine rates. 16. CITY RESPONSIBILITIES The CITY responsibilities shall include but are not limited to: a. Wherever in this Contract any obligation or responsibility is assumed by the CITY, same shall bedeemed an obligation of said CITY. b. The CITY shall perform all work permitted under this Contract to INDOT's reasonable satisfaction, as determined at the discretion of INDOT and in accordance with all applicable federal, state, local laws, ordinances, rules, and regulations. c. Compliance With Laws 1. The CITY shall comply with all applicable federal, state and local laws, rules, regulations and ordinances, and all provisions required thereby to be included herein are hereby incorporated by reference. The enactment of any state or federal statute or the promulgation of rules or regulations thereunder after execution of this Contract shall be reviewed by INDOT and the CITY to determine whether the provisions of this Contract require formal modification. 2. The CITY and its agents shall abide by all ethical requirements that apply to persons who have a business relationship with INDOT as set forth in IC § 4-2-6 et seg., IC § 4-2-7, et. seg., the regulations promulgated thereunder. If the CITY has knowledge, or would have acquired knowledge with reasonable inquiry, that a state officer, employee, or special state appointee, as those terms are defined in IC 4-2-6-1, has a financial interest in the Contract, the CITY shall ensure compliance with the disclosure requirements in IC 4-2-6-10.5 prior to the execution of this contract. If the CITY is not familiar with these ethical requirements, the CITY should refer any questions to the Indiana State Ethics Commission, or visit the Inspector General's website at http://www.in.gov/ig/. If the CITY or its agents violate any applicable ethical standards, INDOT may, in its sole discretion, terminate this Contract immediately upon notice to the CITY. In Page 17 of 53 Pages addition, the CITY may be subject to penalties under IC §§ 4-2-6, 4-2-7, 35-44.1-1-4, and under any other applicable laws. 3. The CITY certifies by entering into this Contract that neither it nor its principal(s) is presently in arrears in payment of taxes, permit fees or other statutory, regulatory or judicially required payments to INDOT. The CITY agrees that any payments currently due to INDOT may be withheld from payments due to the CITY. Additionally, further work or payments may be withheld, delayed, or denied and/or this Contract suspended until the CITY is current in its payments and has submitted proof of such payment to INDOT. 4. The CITY warrants that it has no current, pending or outstanding criminal, civil, or enforcement actions initiated by INDOT, and agrees that it will immediately notify INDOT of any such actions. During the term of such actions, the CITY agrees that INDOT may delay, withhold, or deny work under any supplement, amendment, change order or other Contractual device issued pursuant to this Contract. 5. If a valid dispute exists as to the CITY's liability or guilt in any action initiated by INDOT or its agencies, and INDOT decides to delay, withhold, or deny work to the CITY, the CITY may request that it be allowed to continue, or receive work, without delay. The CITY must submit, in writing, a request for review to the Indiana Department of Administration MOM following the procedures for disputes outlined herein. A determination by IDOA shall be binding on the parties. 6. Any payments that INDOT may delay, withhold, deny, or apply under this section shall not be subject to penalty or interest under IC § 5-17-5. 7. The CITY warrants that the CITY and its subcontractors, if any, shall obtain and maintain all required permits, licenses, registrations, and approvals, as well as comply with all health, safety, and environmental statutes, rules, or regulations in the performance of work activities for INDOT. Failure to do so may be deemed a material breach of this Contract and grounds for immediate termination and denial of further work with INDOT. Page 18 of 53 Pages M e 8. The CITY affirms that, if it is an entity described in IC Title 23, it is properly registered and owes no outstanding reports to the Indiana Secretary of State. 9. As required by IC 5-22-3-7: i. the CITY and any principals of the CITY certify that (A) the CITY, except for de minimis and nonsystematic violations, has not violated the terms of (i) IC 24-4.7 [Telephone Solicitation Of consumers], (ii) IC 24-5-12 [Telephone Solicitations] I or (iii) IC 24-5-14 [Regulation of Automatic Dialing Machines] in the previous three hundred sixty-five (365) days, even if IC 24-4.7 is preempted by federal law; and (B) the CITY will not violate the terms of IC 24-4.7 for the duration of the Contract, even if IC 24-4.7 is preempted by federal law. ii. The Contractor and any principals of the Contractor certify that an affiliate or principal of the Contractor and any agent acting on behalf of the Contractor or on behalf of an affiliate or principal of the Contractor (A) except for de minimis and nonsystematic violations, has not violated the terms of IC 24-4.7 in the previous three hundred sixty-five (365) days, even if IC 24-4.7 is preempted by federal law; and (B) will not violate the terms of IC 24-4.7 for the duration of the Contract, even if IC 24-4.7 is preempted by federal law. Indemnification - The CITY agrees to indemnify, defend, and hold harmless INDOT, its agents, officers, and employees from all claims and suits including court costs, attorney's fees, and other expenses caused by any act or omission of the CITY and/or its Contractors and subcontractors, if any, in the performance of this Contract. The State shall not provide such indemnification to the CITY. Drug -Free Workplace Certification - The CITY hereby covenants and agrees to make a good faith effort to provide and maintain a drug - free workplace. The CITY will give written notice to INDOT within ten (10) days after receiving actual notice that the CITY or an employee of the CITY in the State of Indiana has been convicted of a criminal drug violation occurring in the workplace. False certification or violation of this certification may result in sanctions including, but not limited to, suspension of Contract Page 19 of 53 Pages payments, termination of this Contract and/or debarment of Contracting opportunities with INDOT for up to three (3) years. In addition to the provisions of the above paragraphs, if the total Contract amount set forth in this Contract is in excess of $25,000.00, the CITY hereby further agrees that this Contract is expressly subject to the terms, conditions, and representations of the following certification: This certification is required by Executive Order No. 90-5, April 12, 1990, issued by the Governor of Indiana. No award of a Contract shall be made, and no Contract, purchase order or agreement, the total amount of which exceeds $25,000.00, shall be valid, unless and until this certification has been fully executed by the CITY and made a part of the Contract or agreement as part of the Contract documents. The CITY certifies and agrees that it will provide a drug -free workplace by: 1. Publishing and providing to all of its employees a statement notifying them that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the CITY's workplace, and specifying the actions that will be taken against employees for violations of such prohibition; 2. Establishing a drug -free awareness program to inform its employees of (1) the dangers of drug abuse in the workplace; (2) the CITY's policy of maintaining a drug -free workplace; (3) any available drug counseling, rehabilitation and employee assistance programs; and (4) the penalties that may be imposed upon an employee for drug abuse violations occurring in the workplace; 3. Notifying all employees in the statement required by subparagraph (A) above that as a condition of continued employment, the employee will (1) abide by the terms of the statement; and (2) notify the CITY of any criminal drug statute conviction for a violation occurring in the workplace no later than five (5) days after such conviction; Page 20 of 53 Pages 4. Notifying INDOT in writing within ten (10) days after receiving notice from an employee under subdivision (C)(2) above, or otherwise receiving actual notice of such conviction; 5. Within thirty (30) days after receiving notice under subdivision (C)(2) above of a conviction, imposing the following sanctions or remedial measures on any employee who is convicted of drug abuse violations occurring in the workplace: (1) taking appropriate personnel action against the employee, up to and including termination; or (2) requiring such employee to satisfactorily participate in a drug abuse assistance or rehabilitation program approved for such purposes by a federal, state or local health, law enforcement, or other appropriate agency; and 6. Making a good faith effort to maintain a drug -free workplace through the implementation of subparagraphs (A) through (E) above. f. Non -Discrimination - Pursuant to the Indiana Civil Rights Law, specifically including IC § 22-9-1-10, and in keeping with the purposes of the federal Civil Rights Act of 1964, the Age Discrimination in Employment Act, and the Americans with Disabilities Act, the CITY, its agents, contractors and subcontractors, shall not discriminate against any employee or applicant for employment relating to this Contract with respect to hire, tenure, terms, conditions or privileges of employment or any matter directly or indirectly related to employment, because of the employee's or applicant's race, color, national origin, religion, sex, age, disability, ancestry, status as a veteran, or any other characteristic protected by federal, state, or local law ("Protected Characteristics"). The CITY certifies compliance with applicable federal laws, regulations, and executive orders prohibiting discrimination based on the Protected Characteristics in the provision of services. Breach of this paragraph may be regarded as a material breach of the Contract, but nothing in this paragraph shall be construed to imply or establish an employment relationship between the State and any applicant or employee of the CITY. The State is a recipient of federal funds, and therefore, where applicable, the CITY and any contractors or subcontractors shall comply with requisite affirmative action requirements, including Page 21 of 53 Pages reporting, pursuant to 41 CFR Chapter 60, as amended, and Section 202 of Executive Order 11246. g. Status of Claims - The CITY shall be responsible for keeping INDOT currently advised as to the status of any claims made for damages against the CITY resulting from work performed under this Contract. The CITY shall send notice of claims related to work under this Contract to: Chief Counsel Indiana Department of Transportation 100 North Senate Avenue, Room N758 Indianapolis, IN 46204-2249 17. NOTICE a. Wherever in or under this Contract notice must or may be given by INDOT to the CITY, such notice shall be deemed given when addressed to the CITY at 227 W Jefferson Blvd Suite 1300 N, South Bend, IN 46601 and deposited postage paid in the U.S. Mail system of collection. b. Wherever in or under this Contract notice must or may be given by INDOT to the Project Engineer, such notice shall be deemed given when INDOT transmits the notice verbally or in writing including electronic communications to the Project Engineer in person or to the contact numbers or addresses presented at the preconstruction conference. c. Wherever in or under this Contract notice must or may be given by INDOT to the CITY's Contractor or sub -Contractor, such notice shall be deemed given when INDOT transmits the notice verbally or in writing including electronic communications to the Contractor or sub -Contractor in person or to the contact numbers or addresses presented at the preconstruction conference. d. Wherever in or under this Contract notice must or may be given by the CITY to INDOT, such notice shall be deemed given when received by the DTE at the LaPorte District Office., 315 East Boyd Blvd, LaPorte, IN 46350. 18. PAYMENTS All payments by INDOT shall be made in arrears in conformance with State fiscal policies and procedures and, as required by IC 4-13-2- 14.8, by electronic funds transfer to the financial institution designated by the ACADEMY in writing unless a specific waiver has been Page 22 of 53 Pages obtained from the Indiana Auditor of State. No payments will be made in advance of receipt of the goods or services that are the subject of this Contract except as permitted by IC 4-13-2-20. For forms and additional information, the Contractor may visit the Auditor of State's website at www.in.gov/auditor/forms. In its normal course of business INDOT will provide payment for: a. "Routine Maintenance" shall be paid for by INDOT at the flat unit rate per month for each intersection as listed in Exhibit "A". The flat rate per -month for each inspection shall include all labor, vehicles, and equipment used in carrying out "Routine Maintenance, - and shall be at the unit rates shown in Exhibit "E" attached and made a part of this Contract. b. INDOT shall pay the CITY under "Non -Routine Maintenance" for labor, equipment, and/or material used in making said "Non -Routine" repairs at the unit rates, shown in Exhibit "E". c. "Periodic Preventive Maintenance" shall be paid by INDOT at a flat unit rate per intersection per scheduled visit by type of control unit as listed in Exhibit "A". The flat unit rate per intersection shall include all labor, vehicles, and equipment used in carrying out "Periodic Preventive Maintenance" and shall be at unit rates shown in Exhibit "E". d. Annual Activities: i. "Annual Signal Bulb Change -Out" shall be paid for by INDOT at a flat rate per intersection. The flat rate per intersection shall include all labor, vehicles, and equipment used in carrying out the "Annual Signal Bulb Change -Out", and shall be at the unit rate shown in Exhibit "E". ii. "Annual Conflict Monitor or Malfunction Management Unit Testing", shall be paid for by INDOT at a flat rate per intersection. The flat rate per intersection shall include all labor, vehicles, and equipment used in carrying out the "Annual Conflict Monitor or Malfunction Management Unit Testing", and shall be at the unit rate shown in Exhibit "E". e. The annual monetary limitations shall begin when this Contract takes effect. The annual monetary limitations shall be as follows: First Year $210,364.06 Second Year $216,674.98 Third Year $223,175.23 Fourth Year $229,870.49 Page 23 of 53 Pages f. If this Contract is terminated or expires, then the current year's rates will apply during the timeframe that a new contract is being negotiated. 19. GENERAL PROVISIONS a. Attorney General Approval - This Contract shall not be effective unless and until approved by the Attorney General of Indiana, or an authorized representative, as to form and legality. b. Assignment - The Contractor binds its successors and assignees to all the terms and conditions of this Contract. The Contractor shall not assign or subcontract the whole or any part of this Contract without INDOT's prior written consent. c. Debarment and Suspension - 1. The Contractor certifies by entering into this Contract that neither it nor its principals nor any of its subcontractors are presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from entering into this Contract by any federal agency or by any department, agency or political subdivision of INDOT. The term "principal" for purposes of this Contract means an officer, director, owner, partner, key employee or other person with primary management or supervisory responsibilities, or a person who has a critical influence on or substantive control over the operations of the Contractor. 2. The Contractor certifies that it has verified the state and federal suspension and debarment status for all subcontractors receiving funds under this Contract and shall be solely responsible for any recoupment, penalties or costs that might arise from use of a suspended or debarred subcontractor. The Contractor shall immediately notify INDOT if any subcontractor becomes debarred or suspended, and shall, at INDOT's request, take all steps required by INDOT to terminate its Contractual relationship with the subcontractor for work to be performed under this Contract. d. Delay of work. No delay or failure by either party to exercise any right hereunder, and no partial or single exercise of any such Page 24 of 53 Pages right, shall constitute a waiver of that or any other right, unless otherwise expressly provided herein. e. Force Majeure, Suspension and Termination - In the event that either party is unable to perform any of its obligations under this Contract or to enjoy any of its benefits because. of natural disaster or decrees of governmental bodies not the fault of the affected party (hereinafter referred to as a "Force Majeure Event"), the party who has been so affected shall immediately give notice to the other party and shall do everything possible to resume performance. Upon receipt of such notice, all obligations under this Contract shall be immediately suspended. If the period of nonperformance exceeds thirty (30) days from the receipt of notice of the Force Majeure Event, the party whose ability to perform has not been so affected may, by giving written notice, terminate this Contract. f. Funding Cancellation. When the Director of the State Budget Agency makes a written determination that funds are not appropriated or otherwise available to support continuation of this Contract, the Contract shall be canceled. A determination by the Budget Director that funds are not appropriated or otherwise available to support continuation of performance shall be final and conclusive. g. Governing Laws. This Contract shall be governed, construed, and enforced in accordance with the laws of the State of Indiana without regard to its conflict of laws rules. Suit, if any, must be brought in the State of Indiana. h. Merger & Modification. This Contract constitutes the entire agreement between the parties. No understandings, agreements, or representations, oral or written, not specified within this Contract will be valid provisions of this Contract. This Contract may not be modified, supplemented, or amended, except by written agreement signed by all necessary parties. Except, elements of the traffic signal maintenance activities and record keeping may be added, deleted or modified in the normal course of business without submittal to the Attorney General for approval. i. Non -Waiver. No delay or failure by either party to exercise any right hereunder, and no partial or single exercise of any such right, shall constitute a waiver of that or any other right, unless otherwise expressly provided herein. Page 25 of 53 Pages j. Order of Precedence. Any inconsistency or ambiguity in this Contract shall be resolved by giving precedence in the following order: (1) This Contract, (2) Attachments prepared by INDOT, (3) Attachments prepared by the Contractor. All of the foregoing are incorporated fully by reference. k. Severability. Wherever possible, each provision of this Contract shall be interpreted in such manner as to be effective and valid under applicable law, but if any provision of this Contract shall be prohibited by or invalid under applicable law, such provision shall be ineffective only to the extent of such prohibition or invalidity, without invalidating the remainder of such provision or the remaining provisions of this Contract. 1. Subsequent Acts. The parties agree that they will, at any time and from time to time, from and after the execution of this Contract, upon request, perform or cause to be performed such acts, and execute, acknowledge and deliver or cause to be executed, acknowledged and delivered, such documents as may be reasonably required for the performance by the parties of any of their obligations under this Contract. m. Substantial Performance. This Contract shall be deemed to have been substantially performed only when fully performed according to its terms and conditions and any modification thereof. n. Taxes. The State is exempt from most state and local taxes and many federal taxes. The State will not be responsible for any taxes levied on the CITY as a result of this Contract. o. Previous Contracts Superseded or Revoked. This Contract supersedes and revokes any previous Contract between said parties hereto pertaining to traffic signal maintenance. p. Authorizations. Any person executing this Contract in a representative capacity hereby warrants that he/she has been duly authorized by his/her principal to execute this Contract on such principal's behalf. REMAINDER OF PAGE INTENTIONALLY LEFT BLANK Page 26 of 53 Pages Non -collusion and Acceptance. The undersigned attests, subject to the penalties for perjury, that the undersigned is the contracting party, or that the undersigned is the properly authorized representative, agent, member or officer of the contracting party. Further, to the undersigned's knowledge, neither the undersigned nor any other member, employee, representative, agent or officer of the contracting party, directly or indirectly, has entered into or been offered any sum of money or other consideration for the execution of this contract other than that which appears upon the face hereof. Furthermore, if the undersigned has knowledge that a state officer, employee, or special state appointee, as those terms are defined in IC 4-2-6-1, has a financial interest in the Contract, the CITY attests to compliance with the disclosure requirements in IC 4-2-6-10.5. IN WITNESS WHEREOF, the State of Indiana, through INDOT, and the CITY, through their duly authorized representatives, have entered into this Contract. The parties, having read and understood the foregoing terms of this Contract, do by their respective signatures dated below agree to the terms thereof. CITY OF SOUTH BEND STATE OF INDIANA BOARD OF PUBLIC WORTS INDIANA DEPARTMENT OF TRANSPORTATION Gary A. Gilot, P.E. Rick Powers President, Board/of Public Works INDOT La Porte District Deputy Commissioner Date {o I.OS �;,w 1 („ Date: Approved: Suzann'=y! Fritzberg Department of Administration Member, Board of Public Works (FOR) Jessica Robertson, Commissioner Jam s A. Mueller Member, Board of Public Works Date: Lthin I V L__ Approved: Elizabeth A. Maradik State Budget Agency Member, B.9ard of Public Works f� (FOR) L� ,{�( Brian E. Bailey, Director Therese J. Dorms Member, Board of Public Works Date: A7''ST: Li�ida M. Margin Clerk, Board of Public Works Approved as to Form and Legality Gregory F. Zoeller Attorney General of Indiana Date: (FOR) Page 27 of 53 Pages Exhibit "A" SOUTH BEND TRAFFIC SIGNALS Comm. No Location Type CITY_ 01-071-178 1 US 20(Bypass) @Ironwood TA -South Bend j �01-071-179 --- US 20L ass�o SR 331 South Ramp - TA - - I South Bend 1 01-071-204 l SR 23(Liberty Hwy) @ Mayflower Rd TAB South Bend 01-071-163 SR 23(Praihe Ave) @ Olive _&_Locust _ —TA � South Bent 01-071-036 SR 23(Prairie Ave) @ Oliver St. & Dubail St TA South Bend 01 071 037 SR 23(Prairie Ave_) @ Indiana Ave TA South Bend 01 071 098 SR 23(Sample�& SR 23(Prairie) and Chapin St TA South Bend 01 071-108 SR 23(Sample St) @ Lafayette Blvd_ TA - - South Bend 01 071-109 SR 23(Sample St) @ SR 933 (Main St) TA South Bend 01-071-050 1 SR 23(Sample St) @ SR 933(Michigan) TA South Bend I_01-071-110 SR 23(Sample St) @ Fellows St TA South Bend 01 071-070 1 SR 23(Sample St) @ SR 933(Lincoln Way E_L_ TA] South Bend 01-071-111 , SR 23(Eddy St) @ Jefferson Blvd TA 1 South Bend 01 071-029 L SR 23(Eddy St) @ Colfax Ave_ _ _ _ _ TA South Bend 01 071-112 SR 23(Eddy St) @ LaSalle Ave TA _ South Bend 01 071All 3 SR 23(Eddy St)-@ Cedar St TA South Bend 01-071-207 SR 23(Eddy St) @_Campeau St - - TA South Bend 01-071-208 - -- _ SR 23(Eddy St/South Bend Ave) _@ Howard St/Corby St I TA South Bend 01-071-209 SR 23(South Bend Ave) @ Twyckenham Drive TA South Bend 01-071-096 SR 23(South Bend Ave @_Edison Rd TA South Bend 01-071-092 SR 23(Edwardsburg Hwy) @ Ironwood Dr TA 1 South Bend 01 071-156 '_SR Z3(Edwardsburg Hwy) @ Douglas Rd TA _Mishawaka 01.071-166 SR 23(Edwardsburg Hwy) @ Univ. Park Mall S Entrance TA Mishawaka 01-071-148 SR 23(Edwardsburg Hwy) @ SR 23/Cleveland Rd I_ TA 01 1-1 149 - - _ SR 23 Cleveland R_ d Grape Rd. I— TA _Mishawaka_j Mishawaka 01071 172 _ - SR 23 Cleveland Rd Guwood Rd. — ) @- —m-- — - TA Mishawaka i j 01-071-189 SR 23�Edwardsburg Hwy @Cleveland R_ d (East Junction) TA Rural 01-071-170 _ SR 23(Edwardsburg Hwy) _@ Fir Road_ _ TA_ -I Rural f 01-071-175 SR23(EdwardsburgHwy)@SIR 331(Capital)&Clover TA _ Granger 01 071-197 1 SR 23(Edwardsburg Hwy) a@ Brick Rd — TA, Granger 01 071 205 , SR 23 Edwardsburg H�@ Elm Rd TA _ Granger 01-071.176 SR 23(Edwardsburg_Hwy) @ Adams Road _ _— _ TA - Granger 01 071 201 SR_23 @ Princess Way TA Granger _ I 01-071-154 . SR 23(Edwardsburg Hwy) @Bittersweet Rd _ TA Granger 01 071 210 US 31 @Kern Rd Rams TA Rural �I 01 071 199 US 31 @ Brick Rd _ _ TA . South Bend 01 071 193 ' SR 331(Elm Rd) @_12th _ — TA Mishawaka 01-071-198 SR 331(Elm Rd) @ Dragoon Trail TA Mishawaka Page 28 of 53 Pages 01-071-194 1 SR 331(CapitaJefferson 01-071-203 - SR331(Capitaj1@McKinley Ave_ 01-071 202 SR 331(Capital) @Day Rd 01 071-200 1 SR 331(Capital) @ Douglas Rd 01-071 195 ; SR 331 (Capital)@ Cleveland _ TA Mishawaka TA _L Mishawaka l TA 1 Mishawaka 1 TA Mishawaka TA Mishawaka 01-071-206 i SR 331(Capital)_@ 1-80/90 (Toll Road Ramp) I TA J.._Mishawaka 01 071-124 01 071-116 SR 933(Lincoln Way Ems@ Ash Rd SR 933(Lincoln Ways @Beech Rd TA TA Osceola --- Osceola 01 071-177 SR 933(Lincoln Way E) @ Bittersweet Rd TA I Mishawaka 01-071-147� SR 933(Lincoln Way E) @ Ballard Ave TA Mishawaka Mishawaka Mishawaka Mishawaka 01-071-155 1 - -- 071-0- SR 933(Lincoln Way E) @ Capital Ave TA - - - - SR 933(Lmcoln Way E)@ Beiger St TA 01 071-083 SR 933(Lincoln Way E) @ Byrkit St TA 01-071-081 SR 933(Lincoln WayE) @ Merrifield Ave _ 01 071-080 SRSR 9 3(Lincoln Way E @ Cedar St __, 01 071-079 SR 933(Lincoln Way E)�aChurch St _ TA A �TA Mishawaka Mishawaka Mishawaka 01-071-078 SR 933(Lincoln Way E) @ Main St TA I Mishawaka 01 071-076 SR 933(Lincoln Way_E)�a Spring St TA Mishawaka 01-071-075 SR 933(Lincoln Way Ems@ West St TA _ Mishawaka 01 071 160 SR 933(Lincoln Wenter St f 100 Center'_^ TA Mishawaka 01 071-074 SR 933 Lincoln Ways@ Logan St — 01-071-105 SR 933(Lincoln Ways @Russell Ave - TA TA Mishawaka — Mishawaka 01-071-073 SR 933(Lincoln Way EL@ Ironwood Dr TA j South Bend 1 071 072 I SR 9 Lincoln Way Ea) TWyckenham Dr TA South Bend 01-071 071 SR 933 Lincoln Wa E Miami St @ TA� South Bend 01-071-060 -- 6 SR 933 Michi an St Navarre St - �-- -g —� ---- - TA South Bend 01-071-061 SR 933 Michigan Sq North Shore Dr TA i South Bend 01-071-062 i 933(Michigan St) @ Angela Blvd - SR TA South Bend r01-071_024 SR_ 933 Main St _@ LaSalle Ave - _ South Bend 01-071-025_ SR 933(Main St) @ Colfax Ave _ _TA South Bend 01-071-144 _ _ " SR 933(Main St @Washington St _TA, TA I South Bend, 01-071-143 i SR 933(Main St Jefferson Blvd TA I South Bend 01-071-142 1 SR 933(Main St)_@ Wayne St TA South Bend 01-071-014 SR 933(Main St) @ Western Ave _ TA South Bend 01=071 141- SR 933 Main St Monroe St TA South Bend I 01-071 140 SR 933(Main St) @ South St _ TA j South Bend 01-071-139 SR 933(Main St Bronson St TA ,South Bend 01-071-191 SR 933(Dixie Hwy) @ Dorr Rd TA I Rural 01-071-063 SR 933 Dixie Hwy@ St. Mary's Entrance I_Rural — _01-071-168 rSIR 933(Dixie Hwy)_@ OIt Mary's Entrance -TA _TARural 01-071-188 SR 933(Dixie Hwy) @ 180/90(Toll Road Ramp/Douglas Rd_ _. _ -- _ -- - 01-071 TA — Rural — -I 064 SR 933Dixie Hwy) @ Pendle St TA Roseland" 01-071 065 j SR 933 Dixie Hwy Willow Dr -_-T� Roseland Page 29 of 53 Pages 01-071-066 j SR 933(Dixie Hwy) a� Cleveland Rd Roselar 01-071-067 _ _SR 933(Dixie Hw_� Darde_n Rd_ _ Rural 01-071-120 1 SR_933�ixie Hwy @ Auten Rd _Rural AIF 01-071-192 i SR 2(Western Ave)@ Quince Rd _ Rural 02-071-040 _ 1 US 31(Bvoass) kil Brick Rd(West Ramp) South Be 02-071-035 SR 2 @ Pine Rd 02-071-003 US 20 @ Quince Rd 02-071-039 1 SR 23(Prairie Ave) Ewing Ave 02-071-031 SR 331 @ Kern Rd_ _ 02-071-038 SR 933(Dixie H_w��@ 700' South of St. Ma's Entrance 02-071-037 SR 933(Dixie Ham) @ 700' North_of St. Mars Entrance 85 TRAFFIC SIGNALS 5 INTERSECTION FLASHERS 2 SCHOOL FLASHERS TOTALS: 92 LOCATIONS FL FL FL SF SF Intersections that are UNDER CONSTRUCTION are being maintained by others. South Bend Rural Rural Rural Page 30 of 53 Pages EXHIBIT "B" PREVENTIVE MAINTENANCE CHECK LIST 1. Signal Indications: to be performed on the periodic scheduled visits biannually. A. All lights operating B. In proper sequence C. No lenses broken or cracked 2. Signal Heads: to be checked in conjunction with the `annual signal bulb change -out, lens cleaning and aerial inspection' scheduled visit. A. Proper height (visual check) B. Proper Alignment: Horizontal, vertical, and rotation of all types of heads including a check of the aiming of programmable heads. Aligning of signal heads will not be permitted unless the appropriate set screw, nut, bolt, or screw is also tightened. A tool appropriate for tightening shall be used for aligning signal heads, replacing lenses, replacing visors, or making adjustments. C. No visors missing. Visors or louvers which are missing or damaged shall be replaced. The District Traffic Engineer shall be contacted for availability of replacement visors. D. No pinnacles missing E. Annual check of eye bolt, weatherhead, and balance adjuster- to be done with annual bulb change/ inspection/ cleaning F. Terminal block connections snug (in disconnect hangers, if present) to be done with annual bulb change/inspection/cleaning G. Check for snugness of all mechanical connections - annual H. Wires shall not be closed in doors. Sockets shall not be tightened into terminal strips. Lamps shall not be over tightened or under tightened. 3. Overhead Cables: to be checked in conjunction with the "annual signal bulb change -out, lens cleaning and aerial inspection" scheduled visit. A. Correct drip loops: loops should not allow water to flow into signal heads or disconnect hangers. B. No improper splices and visual inspection of splices, repair, or damaged splices. C. Right number of cable clamps - annually D. Proper spacing of cable rings - annually E. No sagging or loose cables or "A" wires. F. Down guys tight G. Pole eye bolts in good condition - annually H. Check for worn wires at weatherhead, to be done at annual bulb change/inspection/cleaning 4. Service Disconnect Box: to be checked in conjunction with the "annual signal bulb change -out, lens cleaning and aerial inspection" scheduled visit. A. Box and conduit mounted securely B. All connections snug C. Ground wire secured to pole D. Ground rod clamp snug - if possible E. Proper voltage - annually and summer months only F. Door closes securely Page 31 of 53 Pages G. Lock on securely, lubricate lock H. Annual cleaning, note if painting is necessary I. Annual check for waterproof 5. Actuated Signal Controllers: to be performed on the periodic scheduled visits biannually. A. Proper operation of front panel displays B. Detectors picking up vehicle (or pedestrians) on all approaches. Look for condition indicative of upcoming failure. C. Detector putting calls into proper controller phase D. Controller timing operation correctly including all red, yellow, passage, minimum initial, and pedestrian clearance E. Switches in correct position as per timing sheet F. Load switches secure and set properly G. Conflict Monitor or Malfunction Management Unit checking and/or replacement in conjunction with Logistic Support change out program H. Accessory equipment functioning properly 6. Signal Controller Cabinet - to be performed on the periodic scheduled visits biannually. A. Mounted securely to pedestal, pole, or foundation B. External conduit mounted securely, if present C. Oil door hinges D. Proper size fuse of breaker E. Check to see if convenience bulb works F. Clocks: check programming and time (including day of week) G. Properly size interconnect fuses H. Check flasher contacts I. Ground wire connection snug J. Maintenance card present, add additional card, if necessary K. Sign, put time and date on maintenance card L. Clean cabinet (vacuuming & cleaning shelves/walls), change filters - every twelve (12) months M. Check cabinet to be waterproof - every six (6) months N. Check cabinet condition - note if painting is necessary - every six (6) months 7. Signal support structures - to be performed annually. A. Plumb or slightly raked B. Good physical condition C. Check for need of painting D. External conduit mounted securely, if present 8. Guardrail condition -check condition and, if necessary, note need for replacement Check at periodic scheduled biannual visit. 9. Signal related signs - check to see if all required signs are in proper position and in satisfactory condition. Check at periodic scheduled biannually visit. 10. Check condition of existing special markings - note if replacement is necessary. Check at periodic scheduled biannual visit. Page 32 of 53 Pages EXHIBIT "C" SIGNAL WORK ACTIVITY REPORT REPORT COMM NO. WORK ORDER NO. LOCA CITY DATE RECV REPORTED BY DATE RESP TIME DATE ARRV / / TIME ACTIVITY E S DATE COMP / / TIME ACCIDENT Y N DATE IN / / TIME PROB REP PROB PD ACTION LABOR MATERIAL EQUIPMENT Page 33 of 53 Pages Continued EXHIBIT "C" WORK ACTIVITY REPORT FIELD DESCRIPTION A WORK ACTIVITY REPORT is to be completed for all work performed on traffic signals. Procedure for completing "Work Activity Report" form. 1. REPORT NO: Activity report number. Format -month year-DataID-report number: 0102-3098-001 (Office Use only) 2. WORK ORDER NO.- If work being done is for a Work Order then enter the work order number. 3. COMM NO.- Commission number given on the intersection list. This number is on the cards in the cabinet, prints and timing sheets as well as listed in the intersection list. 4. LOCATION- Intersection name. This should always include the State, US or Interstate. 5. CITY- The CITY where work is being done. 6. REPORTED BY- Who reported the trouble call and their agency (if applicable) 7. ACTIVITY- This designates whether this work is E: Emergency or S: (Non -Routine, Work order or Scheduled work) 8. ACCIDENT- Indicate if an accident occurred at any time while at the intersection. 9. TIME RECV- The time this problem was reported in military time. 10. DATE RECV- The date the problem was reported. 11. TIME ARRV- Time arrived at the problem location in military time 12. DATE ARRV- The date arrived at location. 13. TIME COMP- Time completed in military time. 14. DATE COMP- The date completed. 15. PROB REP 1 & 2- The malfunction reported and the appropriate code from the "Reported Problem" code list. Up to 2 (two) problems can be reported. 16. PROB FD 1, 2, 3, & 4- The observed problem again from the "Reported Problem" code list. Up to 4 (FOUR) malfunctions can be recorded. 17. ACTION 1, 2, 3, 4, 5 and 6- Results of the job and the appropriate code number from "TROUBLE CALL REPAIR CODES". Up to 6 (SIX) actions. 18. COMMENTS- Each specific item (loop, head, span, junction box, pole, detector housing, ...) on which work was performed shall be identified as to location and work performed in the comment section of The Work Activity Report. 19. LABOR - A. EMPLOYEE ID- All personnel involved with doing work for this report. First four letters of last name and first letter of first name. B. HOURS- Number of hours each employee worked on this report. 20. MATERIAL - A. TRANSFER TYPE- Install, Remove, Receive, Return of material. B. INVENTORY NO: Department number, assigned to specific material. C. MODEL NO.- Specific model number of material. (Control Equipment) D. SERIAL NO.- Serial number of material (Control Equipment) E. QUANTITY- Number of each INVENTORY NO. transferred. 21. EQUIPMENT - A. EQUIPMENT- All equipment used on this report. B. HOURS- Number of hours that equipment was used on this report. Page 34 of 53 Pages Continued EXHIBIT "C" WORK ACTIVITY REPORT CODE LISTING Work activity report codes, all consist of six (6) characters, two (2) letters and four (4) numbers. 1. The two letters are the specific activity being performed. For Problem Reported and Problem Found codes, use letters from the TROUBLE REPORTED/FOUND or MISCELLANEOUS lists. For Action Taken, use letters from the ACTION TAKEN list. 2. The first two numbers is the specific item. Any of the numbered codes may be used for these two numbers except'00'. The '00' code may only be used for the last two numbers. 3. The last two numbers also come from the numbered code list. These two numbers provide more detail about the specific item. Examples: Signal blacked out TA0100 Bulb out, signal TA1001 AE1001 Bulb out, flasher TA1002 AE1002 Bulb out, Fed TA1003 AE1003 Adjust timings, controller AD2720 Reset timings, controller AC2720 Adjust programming, loop amp AD2725 Breaker tripped, Service TE6100 AC3361 Breaker Tripped, Cabinet TE6100 AC3330 T TROUBLE REPORTEDNOUND TA OUT/BLACKOUT TB FLASHING TC STUCK TD DAMAGED/KNOCK DOWN TE FAILURE/MALFUNCTION TF TURNED TG LOW/LOOSE TH HIGH/TIGHT TI OPEN TK WORN TM CHECK/ WORKING ON ARRIVAL M MISCELLANEOUS MA ROUTINE MAINTAINENCE MB NON -ROUTINE MAINTAINENCE MC WORK ORDER MD LOCATE ME ASSIST MF INSPECT ContractOR A ACTION TAKEN AA INSTALL/RE-CONNECT AB REMOVE/DISCONNECT AC RESET/REPAIR/ALIGN/TIGHTEN/CLOSE BULB; SIGNAL; PROGRESSION... SIGNAL FLASHING NOT OR SLOWLY CHANGING CABINET; POLE; HEAD; CONDUIT.. LOADSWITCH; CONT.; GENERAL... ALIGNMENT HEAD, ARM... SPANS; HEAD... SPANS; HEAD... DOOR; HAND HOLE COVER... WORN CHECK OPERATION MONITOR; ROUTINE; REBULB; LOOP OTHER ACTIVITIES WRITTEN WORK ORDERS ONLY CONDUIT; LOOPS... ContractOR; STATE TECH ANY ContractOR NEW TO LOC./RE-CONNECT AMP... FROM LOC./DISCONNECT AMP... CHANGE BACK TO INTENDED OPERATION Page 35 of 53 Pages Continued EXHIBIT "C" WORK ACTIVITY REPORT FIELD DESCRIPTION A ACTION TAKEN OPERATION AD ADJUST/MODIFY/MOVE CHANGE AWAY FROM INTENDED OPER AE REPLACE AF CHECK/TEST/SECURE/INSPECT AG COVER/UNCOVER FOUNDATION AH LOCATE Al FURTHER ATTENTION NEEDED AY ASSIST AZ ADVISE COMMENTS 0 GENERAL 00 NO CODE 01 SIGNAL 02 FLASH/FLASHER 03 PEDESTRIAN 04 SIGN 1 HEAD AND PARTS 10 BULB / LED 11 LENS 12 VISOR 13 HEAD 14 AERIAL INSPECTION/ REBULB 2 CONTROL EOUIPMENT OPERATION EXISTING WITH SAME TYPE INSURE OPERATION; MAKE SAFE BAG/ UNBAG HEADS; COVER CONDUIT; LOOPS;... SAFE BUT NEEDS FURTHER ATTENTION ContractOR; STATE TECH;... RADIO RM; STATE TECH CODE DESCRIPTION LAST 2 DIGITS ONLY VEH. INDICATIONS; IN GENERAL VEH. INDICATIONS; IN GENERAL PED. INDICATIONS; IN GENERAL SIGNAL; PEDESTRIAN SIGNAL; PEDESTRIAN SIGNAL; PEDESTRIAN SIGNAL; PEDESTRIAN SIGNAL; PEDESTRIAN ANNUAL INSPECTION/ REBULB 20 CONTROLLER CONTROLS INTERSECTION 21 MASTER (SYSTEM) ASC2M-1000; MDM-100... 22 CONFLICT MONITOR CONFLICT MONITOR 23 LOADSWITCH SIGNAL; PEDESTRIAN 24 TIME CLOCK/IMS/DCU INTERNAL OR EXTERNAL 25 DETECTION/AMPLIFIER/PRE-EMPT/VIDEO INSIDECABINET 26 MODEM PHONE MODEM OR COMM. MODEM 27 PROGRAM/TIMING CONTROLLER; AMPLIFIER; CLOCK.. 28 PROGRESSION/INTER/COMM TO DO WITH COORDINATION 29 BUS INTERFACE UNIT (BIU) SIGNAL, PED, DETECTOR,... 3 CABINET AND PARTS 30 CABINET 31 PANEL SIGNAL; FLASHER CABINET; LOOP; PRE-EMPT... Page 36 of 53 Pages 32 HARNESS CONTROLLER; MONITOR; AMP... 33 FUSE/BREAKER SERVICE; CONT; PRE-EMPT... 34 RELAY/SWITCH FLASH; POWER; PRE-EMPT... 35 SURGE PROTECTOR/LINE FILTER CABINET PROTECTOR/ FILTER 36 POWER SUPPLY CABINET, DETECTOR RACK,... 4 SPAN/POLE/ARM 40 SPAN/CATENARY/TETHER SET OR SEPARATE 41 EYEBOLT/DOWNGUY/ANCHOR SET OR SEPARATE 42 POLE SIGNAL, FLASHER 43 PEDESTAL/BASE SET OR SEPARATE; SIGNAL; PED 44 JUNCTION BOX/QUICK-DISCONNECT SPAN MOUNT JUNCTION BOX 45 ARM SIGNAL, FLASHER 5 IN/UNDER GROUND 50 DETECTOR HOUSING COMPLETE/EXTENSION 51 FOUNDATION/ANCHOR CABINET; PEDESTAL; POLE... 52 HAND HOLE CABLE HAND HOLE 53 CONDUIT UNDERGROUND; ABOVE GROUND 6 WIRE AND SERVICE 60 WIRE/CABLE ANY TYPE; MULTI/SINGLE COND. 61 SERVICE (LINE IN) DISCONNECT; RISER 62 LOOP/PED-BUTTON/LEAD-IN/SPLICE/CAMERA OUTSIDE OF CABINET 9 PEOPLE 90 STATE PERSONNEL 91 RADIO ROOM OPERATOR 92 ContractOR 93 OTHER AGENCY EXCEPT RADIO OPERATOR ONLY ANY ContractOR OUTSIDE OF INDOT Page 37 of 53 Pages EXHIBIT "D" CONFLICT MONITOR REPORT CONTROLLER CONFLICT MONITOR -circle active indication CH IND. MAKE MODEL_ 1 RYGW MAKE MODEL Date/Time CORRECT Y N 2 RYGW RING 1 RING 2 3 RYGW Date/Time CORRECT Y N 4 RYGW PHASE T PHASE T 5 RYGW CVM 24v I 24v II 6 RYGW INT INT 7 RYGW CONF RED FAIL BND FAIL 8 RYGW TIME TIME 9 RYGW PROGRAM CARD MIN CLEAR 10 RYGW 0 NEXT 0 NEXT 11 RYGW WATCH DOG DUAL IND. 12 RYGW SWITCH SETTINGS circle active switch settings MIN FLASH _MIN CLEAR WATCHDOG RED FAIL G, Y & R ONLY DUAL SEL-- A B CVM LATCH 24v LATCH G or W vs Y GY ENABLE WD ENABLE FAST FLASH FAULT RE-INIT. CVM LOG DISABLE WALK DISABLE BND DISABLE MONITOR FOR G, W or Y vs RED PER CH (TCT ENABLES -- EDI DISABLES) 1 2 3 4 5 6 7 8 9 10 11 12 VAC VDC BACKPANEL READINGS -circle active outputs CVM PHASE OUTPUT OVERLAP 01 02 03 04 05 06 07 08 A B C D R R R R R R R R R R R R Y Y Y Y Y Y Y Y Y Y Y Y G G G G G G G G G G G G W W W W W W W W DW DW DW DW DW DW DW DW indicate phasing LOAD SWITCH LED'S circle active inputs LS1 LS2 LS3 LS4 LS5 LS6 LS7 LS8 LS9 LS10 LS11 LS12 R R R R R R R R R R R R Y Y Y Y Y Y Y Y Y Y Y Y G G G G G G G G G G G G COMM. NO. / / TECH. DATE / / TIME LOCATION COMMENTS Page 38 of 53 Pages EXHIBIT "E" UNIT RATES 2016 2017 2018 2019 2020 101 B. Flashers 33.50/Mon 35.34/Mon 37.29/Mon 39.34/Mon II. Non -Routine Labor & Eauiument A. Skilled Labor - Straight Time: $ 62.27/Hr $ 64.45/Hr $ 66.71/Hr $ 69 04/Hr B. Skilled Labor - Over Time: $ 83.29/Hr $ 86.20/Hr $ 89.22/Hr $ 92.34/Hr C. Skilled Labor - Holiday: $117.21/Hr $121.32/Hr $125.56/Hr $ 12996/Hr D. Unskilled Labor - Straight Time $ 27.04/Hr $ 27.98/Hr $ 28.96/Hr $ 29 98/Hr E. Unskilled Labor - Over Time $ 36.64/Hr $ 37.92/Hr $ 39.25/Hr $ 40.62/Hr F. Unskilled Labor - Holiday $ 55.68/Hr $ 57.63/Hr $ 59.65/Hr $ 61 74/Hr G. Pickup Truck: $16.12/Hr $17.33/Hr $18.63/Hr $ 20.03/Hr H. Bucket Truck: $ 27.78/Hr $ 29.86/Hr $ 32.10/Hr $ 34.51/Hr I. Boom/Auger Truck Mounted: $ 50.32/Hr $ 54.09/Hr $ 58.15/Hr $ 62.51/Hr J. Backhoe and Front End Loader, Combination: $ 57.10/Hr $ 61.38/Hr $ 65.99/Hr $ 70.93/Hr K. Trencher: $ 48.00/Hr $ 51.61/Hr $ 55.48/Hr $ 59.64/Hr L. Pole Trailer $ 16.12/Ft $ 17.33/Ft $ 18.63/Ft $ 20.03/Ft L. Saw Slot for Roadway Loop and Sealer: $ 18.67/Ft $ 20.08/Ft $ 21.58/Ft $ 23.20/Ft M. Install Controller cabinet: $705.32/Ea $744.12/Ea $785.04/Ea $828.22/Ea N. Loop system / Camera check: $150.29/Ea $158.56/Ea $167.28/Ea $176.48/Ea O. Conflict monitor changeout: $153.39/Ea $161.82/Ea $170.72/Ea $180.11/Ea III. Periodic Preventive Maintenance A. Actuated Installation: $100.52/Int $106.05/Int $111.88/Int $118.03/Int B. Flasher Installation: $ 50.25/Int $ 53.02/Int $ 55.93/Int $ 59.01/Int IV. Annual LED Cleaning and Aerial Inspections: A. Actuated Installation: $191.52/Int $ 202.05/Int $ 213.16/Int $ 224.89/Int B. Flasher Installation: $ 95.76/Int $101.03/Int $ 106.59/Int $112.45/Int V. Annual Malfunction Monitor Unit Testing: $100.52/Int $106.05/Int $111.88/Int $118 03/Int Page 39 of 53 Pages EXHIBIT "F" HOLIDAYS For purposes of this Contract, holidays shall be defined as: Fixed Holidays: New Year's Day Martin Luther King Jr. Day Memorial Day Independence Day Labor Day Veteran's Day Thanksgiving Day Day after Thanksgiving Day Christmas Day For the holidays that are on a fixed calendar date and therefore may occur on a day other than a normal workday, a workday before or after the calendar date may be designated as the observed holiday. In addition to the nine designated holidays above, employees may choose one additional floating holiday subject to South Bend Municipal Code Sec. 2-121 (a) which can be any day of the employee's choosing subject to supervisor's pre -approval. This is a total of 10 holidays annually. Page 40 of 53 Pages EXHIBIT "G" SIGNAL BULB WATTAGE TABLE The following table shall be used as a guideline for proper lamp wattages. Light emitting diode (LED) lamps shall replace incandescent bulbs when this is feasible. 8 in. (200 mm) Green, 8 in. (200 mm) Yellow, 9 in. (230 mm) Walk/Dori t Walk.....................................................................67 W 8 in. (200 mm) Red, 8 in. (200 mm) Yellow Arrow, 8 in. (200 mm) Green Arrow............................................................................116 W 12 in. (300 mm) Energy Saving Grid Walk/Dori t Walk...............................67 W 12 in. (300 mm) Green, 12 in. (300 mm) Yellow, 18 in. (450 mm) Pedestrian Signal Walk/Dori t Walk ...........................116 W 12 in. (300 mm) Red, 12 in. (300 mm) Yellow Arrow, 12 in. (300 mm) Green Arrow..........................................................................150 W 12 in. (300 mm) Green LED, 12 in. (300 mm) Yellow LED, 18 in. (450 mm) Pedestrian Walk/Dori t Walk LED......................19 W 12 in. (300 mm) Red LED.............................................................11 W 12 in. (300 mm) Green Arrow LED, 12 in (300 mm) Yellow Arrow LED, 12 in (300 mm) Red Arrow LED...............................8 W Optically Programmable Bulbs, All Sizes, All Colors...................................150 W Cabinet Convenience lamp; G, M, or P-1 Cabinets...............................67 W Page 41 of 53 Pages Exhibit "H" Request to Work For use to request work outside of normal work hours. Date(s) Requesting to work: _/_/_ thru _/ / Hours Requesting to work: first day AM PM till _ AM PM Second day AM PM till AM PM Third day AM PM till AM PM Location (one location per form): Type of work to be performed: Requested By: Approved Denied By: Reason for Denial: Date _// Date // Page 42 of 53 Pages EXHIBIT "I" Detector Loop Tagging Table Procedure The Loop Tagging Table shall be completed from the signalized intersection plan, including properly identified loop numbers, vehicle directional movements with associated lane designations, phase assignments, individual loop numbers and count output numbers. Loop Number: The Loop Number shall be the detector rack channel number, for each additional rack added the channel numbers shall be increased by sixteen (ie: the third detector racks first loop would be 33). The loop numbers shall be assigned in two groups: Counting and non -counting channels. Each group shall follow the direction and lane designation convention. To minimize the number of detection channels required, counting loop channels shall be grouped first followed by non -counting channels. The order of the loops shall minimize the number of loop amplifiers and detector racks required for the operation. If micro -loops are used with Canoga amplifiers loops shall be numbered in three groups. Canoga amplifier channels shall follow non -counting channels Direction of Vehicle movement: The loop tagging table shall begin with highest priority route, either the northbound or eastbound movement containing phase 2. The corresponding first cardinal direction letter for each movement (N- north, S- south, E- east, W-west) shall be entered in the loop tagging table. The remaining movements shall be labeled and listed according to plan view, clockwise from the movement containing phase 2 (followed by the movement containing 4,6 and 8, skipping missing movements and corresponding phases). Phase designations may vary for specialized signal operations. Lane Designation: Loops shall be listed in the tagging table starting with the farthest left lane for each approach and continue to be listed sequentially to the right and shall be designated as follows: Left Turning Lanes: Exclusive Left turning lanes shall be designated by an "L" for left in the table. Multiple left turn lanes on a single approach shall be designated by an additional alpha character identifier so that "LA" represents the left most lane, followed by "LB" and "LC" respectively, and continuing for each subsequent left turn lane for that approach. Through Lanes: Through lanes or a shared through/right or shared through/left lane shall be designated with an "A" for the left most lane followed alphabetically for each subsequent through lane. Loops from different lanes shall not be connected together. Loop(s) placed in the right turn radius are to be designated in the through lane. A radius loop that is counting shall have an exclusive lead-in. Right Turning Lanes: Exclusive Right turning lanes shall be designated as "R" for right. Multiple right turning lanes on a single approach shall be designated by an additional alpha character identifier so that "RA" represents the left most right turn lane, followed by "RB" and "RC" respectively, and continuing for each subsequent right turn lane for that approach. Phase Number: The phase number shall be the controller phase number (1-16) assigned to each protected movement corresponding to each lane. Page 43 of 53 Pages Loops: On approaches with stop bar detection, loop number 1 will normally be at the stop bar for the lane. Loop number 2 shall be the next loop away from the stop bar in the same lane. The loop numbering shall continue in order, for the through portion of the lane, from the stop bar back. The next loop number shall be assigned to the adjacent right turn radius loop at the stop bar followed by the next radius loop away from the stop bar until all radius loops are numbered. The advanced loop(s) that may be in the same lane as stop bar loops shall be numbered in order following the right turn radius loops. All loops connected to one lead-in shall be listed in order separated by a comma. For micro -loops, these numbers shall have a 'M' directly in front of them with no space between the M and the numbers (ie: M1,2,3 or M4). Count Output M: Each lane shall have a count output. The Count Output (#) shall be labeled identically to controller detector channel that is assigned to log the count pulse. Count output of counting amplifiers is typically 2 channels higher than the corresponding Presence output, unless an auxiliary BIU is installed. Where logging the call output of a standard (non -counting) amplifier, the count output (#) shall be blank. No number shall be used more than once for combined loop and count output numbers. Page 44 of 53 Pages EXHIBIT "I" LOOP TESTING TABLE INTERSECTION COMMISSION NO. TEST PERFORMER- ContractOR ( C ) PAGE Contract NO, DATE TEST PERFORMER - STATE (S) DATE LOOP DESIGNATION Number of Turns READINGS AT DETECTOR HOUSING BEFORE SPLICED Inductance 80 to 800 <_ uH Resistance <_ 80 Voltage 30 Megohm (Loop) > M0 Megohm (Lead-in) > M0 READINGS AT CABINET AFTER SPLICED Inductance C 80 to 800 s uH S C Resistance <_80 S C Voltage <_ 30 S Megohm Wet C Splice 100M0 S C Vehicle Simulator S Page 45 of 53 Pages EXHIBIT "K" FIBER OPTICS SPECIFICATIONS GENERAL REQUIREMENTS Materials and Equipment: Materials and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products. All materials and equipment furnished shall be new of first quality, of the latest design and be completely free from defects in material and poor workmanship. All like pieces of equipment shall be of the same type and manufacturer to assure uniformity, interchangeability of components, single responsibility, and most satisfactory service. Contractor Qualifications: The fiber optic cable installation shall be supervised by trained and experienced personnel. The cable terminations shall be done by qualified technicians. Code Requirements: The Fiber Optic installation shall be in accordance with or exceed all minimal requirements of State codes, National codes, and manufacturer codes as applicable. Miscellaneous Equipment: The Contractor shall furnish and install all necessary miscellaneous equipment to make a complete and operating installation in accordance with the plans, standard sheets, standard specifications, special provisions, and accepted good practice of the industry. RECORDS Cable Records: All cable records shall be the responsibility of the Contractor. Detailed records shall be kept of fiber optic cable reference locations between termination points. The following is a brief example: Reference Distance Reference Description Connection to telemetry unit in controller at US 31 (Meridian Street) and North Street 8 Enter INDOT Handhole 26 Enter INDOT Handhole 123 Enter INDOT Handhole 140 Enter INDOT Handhole 213 Enter INDOT Handhole Page 46 of 53 Pages The reference points shall include: connection points in controllers, base and top of conduit risers, handholes, junctions with intermediate poles, centerlines of named streets and roads, and any other well defined points as directed. MATERIALS AND COMPONENTS Cable General: The fiber optic cable shall contain 6 stranded multimode, graded index, optical fibers with a minimum of one non-metallic central strength member. The cable shall be loose tube, all dielectric construction, suitable for outdoor use in conduit or on aerial supports. Each individual fiber shall be 62.5/125 micron diameter (core/clad), and each fiber shall be individually encased in its own gel -filled color -coded buffer. The fiber optic cable shall be constructed with Kevlar braid and outer polyethylene jackets as a minimum. IF an inner jacket is used it shall be PVC. Maximum attenuation of the cable shall be 4.0 dB/Km nominal, measured at room temperature at 850 nm. The bandwidth shall not be less that 160 MHz/Km also at 850 nm. Each fiber shall be continuous with no factory splices except for jointing standard length cables to form longer, continuous jacketed cable to fit installation requirements. The cable shall have standard nylon rip cords or distinctively different color Kevlar rip cords (like red). The cable shall meet the generic requirements for optical fiber and optical fiber cable per Bellcore Technical Reference TR-TSY-000020. The exterior of the polyethylene outer cable jacket shall be stenciled so that every 5w meter on each reel is marked with a number. The 5th meter of each reel shall be marked with a 5, the 10th meter marked with a 10, and so on until the end of the reel. The stencil shall be applied to the outer jacket using permanent ink and shall be permanently engraved into the jacket to provide long-lasting readability. Warning Tape: Plastic marking tape shall be acid and alkali resistant polyethylene film, 3 inches (77 mm) wide with minimum thickness of 0.004 of an inch (0.102 mm). The tape shall be of a type specifically manufactured for marking and locating underground utilities. Tape color shall be orange and shall bear a continuous printed inscription "CAUTION -FIBER OPTIC CABLE". Cleaving Tool: The cleaving device shall be a T&B Cleaving Tool - catalog no. 92208 or approved equal. Warning Tape: Where conduit is installed in an open trenched warning tape shall be installed directly above the conduit at a depth of twelve inches below finished grade unless otherwise approved by the Engineer. Cable: The Fiber Optic cable shall be installed in continuous runs as indicated on the plans. Splices shall be allowed only in controller cabinets between the end of the fiber optic interconnect cable and a factory manufactured pigtail assembly. Cable Installed in Ducts and Conduits: A suitable cable feeder guide shall be used between the cable reel and the face of the duct and conduit to protect the cable and guide it into the duct off the reel. It shall be carefully inspected for jacket defects. If defects are noticed, the pulling operation shall be stopped immediately and the Engineer notified. Precautions shall be taken during installation to prevent the cable from being kinked or crushed. A pulling eye shall be attached to the cable and used to pull the cable through the duct and conduit system. A pulling swivel shall be used to eliminate Page 47 of 53 Pages twisting of the cable. As the cable is played off the reel into the cable feeder guide, it shall be sufficiently lubricated with a type of lubricant recommended by the cable manufacturer. A dynamometer or break away pulling swing shall be used to ensure that the pulling line tension does not exceed the installation tension value specified by the cable manufacturer. The mechanical stress placed on a cable during installation shall not be such that the cable is twisted or stretched. The pulling of cable shall be hand assisted at each controller cabinet. The cable shall not be crushed, kinked or forced around a sharp corner. If a lubricant is used it shall be of water based type and approved by the cable manufacturer. Sufficient slack shall be left at each end of the cable to allow proper cable termination. Also a small slack of cable shall be left in each handhole between intersections. At the cabinet controller shall be two (2) meters minimum storage at the handholes adjacent to the cabinet controller six (6) meters storage and at the top of each conduit riser six (6) meters after the support cable is stripped when figure 8 cable is used. For storage of additional slack cable adjacent to conduit riser the Contractor shall use Fiber Optic Strand Storage Unit to store and protect the fiber optics at the top of the risers. The support cable shall be terminated at the riser wood pole. Storage of additional slack cable in handholes shall be coiled. The slack coils shall be bound at a minimum of 3 points around the coil perimeter and supported in their static storage positions. Storage of additional slack cable adjacent to conduit risers and support poles shall be as detailed on the following page. At each controller cabinet and handhole the cable shall be visible marked/tagged as "CAUTION -FIBER OPTIC CABLE". Maximum length of cable pulling tensions shall not exceed the cable manufacturer's recommendations. At each handhole and cabinet, the fiber optic cable shall be painted for a length of 12 inches (305 mm) with 2 coats of long lasting and highly visible paint. The color shall be unique to each roadway as approved by the Engineer. For example, the cable for the major east -west street may be painted red, the cable for the major north -south street may be painted yellow, and the cable for the minor east - west street may be painted blue. Cable Installed on Aerial Spans: The fiber optic cable shall be figure 8 cable. All existing interconnect cable in risers, conduits, handholes, and controllers shall be removed. All existing interconnect cable not used to support the new fiber optic cable shall be removed. All existing state owned poles used exclusively for existing interconnect shall be removed if the new fiber optic cable does not utilize the pole. Existing conduit risers designated for re -use with fiber optic interconnect shall have the existing weatherhead removed. The lashing wire shall be either a dielectric or stainless steel lashing filament, and shall be securely tied off when terminated near each support pole. If the fiber optic cable is figure 8, the messenger cable portion shall be removed from the controller cabinet to the top of the nearest conduit riser. Removal of the messenger portion of the figure 8 fiber optic cable shall be performed with no additional payment. All fiber optic cable runs damaged as a result of the removal of the messenger shall be replaced, free of splices, with no additional payment. Placement of Cable into Conduit Risers: The Contractor shall provide conduit risers as indicated on the plans. Kellum grips and/or other hanger devices shall be used to support the vertical drop of cable and to prevent any possible kinking of the cable after installation. The top of risers shall have a hexnut type watertight service entrance connector with an oval shaped grommet. The grommet shall be either neoprene or rubber. The voids between the fiber optic cables(s) and the grommet shall be sealed with silicone. Page 48 of 53 Pages Minimum Bend Radius: For static storage, the cable shall not be bent at any location to less then ten times the diameter of the cable outside diameter or as recommended by the manufacturer. During installation, the cable shall not be bent at any location to less than twenty times the diameter of the cable outside diameter or as recommended by the manufacturer. Prior to the Fiber Optic Cable Installation: Prior to the installation of the cable, the manufacturer shall submit to the Contractor a factory -performed Optical Time Domain Reflectometer (OTDR) trace result for each reel of cable. The Contractor shall in turn submit the trace results to the Engineer for approval. The Engineer shall inspect the test results for any unacceptable results. Any unacceptable reels shall be replaced with no additional payment. After the Fiber Optic Cable Installation: Each section of the cable shall be tested for continuity and attenuations as a minimum. If the attenuation is found not to be within the acceptable nominal values, the Contractor shall use an Optical Time Domain Reflectometer (OTDR) to locate points of localized loss caused by bends or kinks and try to relax these bends or kinks. If this is not successful the Contractor shall replace the damaged section of the cable with no additional payment. Splices will not be allowed to repair the damaged section. The Contractor shall provide the Engineer with a written report showing all the values measured during these tests. Cable Termination: Terminations shall be made using the method recommended by the connector manufacturer. If breakout kits are used, they shall terminate each fiber in the controller cabinet using buffer tubing and jacketed material. If mechanical splices are used, they shall terminate each fiber in the controller cabinet using the splice tray. INTERCONNECT TRACE WIRE A 14 gauge copper trace wire shall be installed with all underground fiber optic interconnect cable. This wire shall be in accordance with 913.15 (f) 4. The trace wire shall be continuous from intersection to intersection, end in the controller cabinet at each end. Installing this cable will be paid under the item, "Fiber Optic Cable'. Page 49 of 53 Pages EXHIBIT "L" INDOT PROVIDED MATERIALS LIST Material Description Signal Control Cabinets Signal Control Equipment inside Control Cabinet Signal and Pedestrian Heads, Back -plates, Lenses, Visors, Reflectors Pedestrian Push Button Span Mount junction Box Padlocks Breaker, 50 AMP- for replacement only Ring & Cover, Heavy Duty- for replacement only Pedestal Base, Aluminum Pipe, Aluminum, 4" X 2' Pipe, Aluminum, 4" X 9' Cap, Aluminum, 4" Detector Housing, Aluminum Signal Poles Signal Arms Page 50 of 53 Pages EXHIBIT "M" CONFLICT MONITOR CHANGEOUT PROCEDURE Conflict Monitors use NEMA inputs and are interchangeable among manufacturers. TCT LSM12 or LNM12 series monitors must be installed at intersections in TCT closed loop systems for proper operation. TCT LNM12 series monitors must be installed at intersections equipped with PRE-EMPTION. These monitors should normally be reserved for such intersections due to their limited availability. Options on this series of monitor shall not be used unless directed by the Engineer or marked on the timing sheet. 1. MINIMUM FLASH TIME set to 10 seconds. The SERIAL and MODEL numbers shall be recorded on the Work Activity Report. 2. The intersection should be green for the phase(s) that would flash yellow. If the Technician does not know which Phases flash yellow, he can refer to the Preferentiality listing on the Intersection listing. 3. The 10 Amp breaker should be turned 'off. This puts the signal on flash and removes the power from the controller and the conflict monitor. 4. The old conflict monitor's MS connector(s) shall be loosened and removed. The conflict monitor program card must be removed and installed in the replacement monitor. 5. The new conflict monitor can then be installed in the cabinet and the MS connector(s) connected to the new monitor. 6. The 10 Amp breaker can then be turned back on. The controller should reinitialize in the preferential phase. The conflict monitor may have a preexisting "conflict" registered in it's memory and may require a "reset" to get the signal to go to signal. 7. If the conflict monitor reinitializes in minor phases, there are other problems not associated with the conflict monitor that should be checked out. S. Record the SERIAL and MODEL numbers of the removed monitor on the Work Activity Report, sign cabinet card showing the time, date and tech performing the conflict monitor exchange. 9. Routine Conflict Monitor change outs will be performed within the month listed in Exhibit "B". 10. The Annual Monitor Change -out will be performed during the months of October through the end of December. Failed monitors will be delivered to the La Porte District Traffic Office as designated by the Project Supervisor. Page 51 of 53 Pages EXHIBIT "N" EQUIPMENT FOR EMERGENCY ON -CALL VEHICLE The following is a list of minimum Traffic Signal control equipment which is required to be stored in each emergency on call vehicle in order to replace faulty control equipment in a timely manner: DESCRIPTION QUANTITY CONTROLLERS LMD8000 1 ASC2-2100 1 ASC2-1000 1 3000E 1 CONFLICT MONITORS NEMA 12 CHANNEL 1 MMU 16 1 LOOP AMPLIFIERS SINGLE CHANNEL 2 TWO CHANNEL MODULE (TS1) 2 TWO CHANNEL MODULE (TS2) 2 TWO CHANNEL MODULE (TS2) COUNTING 2 LOADSWITCH NEMA LOADSWITCH 4 NEMA FLASHER 2 Page 52 of 53 Pages EXHIBIT "O" SIGNAL BULB REPLACEMENT & AERIAL INSPECTION REPORT Comm. No. Location Technician Date: Number of Bulbs Changed (Filament "U" shaped):67 Watts 116 Watts 150 Watts Height of Lowest Head per Span: NB SB EB WB When Replacing Bulb did signal go to Flash? Direction Is 'Jones Plug" used in Quick Disconnect Hanger? Have all Overhead Signs been flipped back or realigned? Have all Heads been realigned? Is there evidence of moisture intrusion into the signal heads? Need Work Repaired OK Visors (damaged, deteriorated, missing) Louvers (damaged, deteriorated, missing) Lenses (cracked, holes, deteriorated) Reflectors (damaged, not reflective) Balance Adjusters (worn) Wiring (burned, loose connection, bad insulation) Drip Loops Missing Span & Catenary (loose, rusted) Tether (missing, damaged) Mast Arm (accident damage) Wood Poles (cracked, deteriorated) Pole Mount (loose, damaged) Pedestal (loose, damaged) Down Guys (loose, cover missing) Overhead Signs (damaged, deteriorated) Support Structure (indicate problem) COMMENTS: Page 53 of 53 Pages BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date October 17, 2016 Department Name Theresa E. Harrison, P.E., ENV SP Division/Bureau Public Works Engineering BPW Date October 25, 2016 Phone Extension 5933 Required Prior to Submittal to Board Legal ® Attorney Name: Michael Schmidt Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing El Check the Appropriate Item Type — Required for All Submissions ❑ ❑ Agreement Professional Services ® Contract ❑ Proposal ❑Addendum El Resolution ❑ ❑ Bid Opening Quote Opening ❑ Bid Award ❑ Req. to Advertise El Quote Award Title Sheet ❑ Change Order No. ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control: ❑ Other: Required Information Company or Vendor Name Indiana Department of Transportation ❑ Yes ❑ No ❑ If Yes, Approved by New Vendor Purchasing MBE/WBE Contractor 0 MBE WBE MBE/WBE Contractor Requested No ❑ Yes Name of Company Project Name South Bend Signal Maintenance Project Number Funding Source Account No. Amount $0 cost to City; City is paid by INDOT as outlined in Contract Terms of Contract Purpose/Description This is a contract between the City and INDOT for the City to _provide "first response" for INDOT owned traffic signals ❑ Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) Amount of Increase Decrease Previous Amount Current Percent of Change: New Amount Total Percent of Chanae: Py Original ® ❑ ® ❑ ired For Chanqe Orders Original, signed document to be returned to INDOT Ed Gleckler, Manager, Traffic & Lighting Bureau Scanned, signed copy to engineering folder: S:\Public •-"•^"�•• •""^aiui,�n�uvi -fill UI J� IraIIIc JI nai maintenance Contract\2016-10-17 Traffic Signal Maintenance Contract