Loading...
HomeMy WebLinkAboutChange Order No. 7 - Rieth Riley - SB One Way to Two Way Conversion Div BF x;j I316COUNTY-CITY BUILDING �U� t71l PHONE $74/23$-92$1 227 W. JEFFERSON BOULEVARD iW rewcrt I> FAX $74/23$-9171 SOUTH BEND. INDIANA 46601-1830 �� _: �r a�J CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS September 27, 2016 Mr. John A. Yadon Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 RE: Change Order No. 7 - South Bend One -Way to Two -Way Conversion, Div. B Project No. 116-001 Dear Mr. Yadon: The Board of Public Works, at its meeting held on September 27, 2016, approved the above referenced Change Order for an increase of $293,073.61, bringing the current contract amount to $17,248,018.31. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk l Enclosure c: Toy Villa, Engineering GARY A. GILOT DAVID P. RELOs ELIZABETH A. MARADIK JAMEs A. MUELLER THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: 9/17/2016 PROJECT NO: 116-001 DIV B PROJECT NAME: 116-001 South Bend One-way to Two-way Conversion CONTRACT DATE: 2/26/2016 CHANGE ORDER NO: 7 SUBJECT OF CHANGE ORDER: PCR #7-Additional Pavement Milling & Resurfacing (see Change The original contract sum $ 16,131,908.36 Net change by previously authorized change orders $ 823,036.34 The contract sum prior to this change order $ 16,954,944.70 By this Change Order, the project amount is OX Increased Decreased $ 293,073.61 The new contract sum including this change order $ 17,248,018.31 This Change Order represents a total change of 1.73 % Total change for entire project 6.92 Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR Rieth-Riley Construction CO., INC. Company Name 25200 State Road 23 Address South Bend, Indiana, 46614 City, State, Zip 6/1 /2017 0 days 0 days 6/1/2017 RECOMMENDED FOR APPROVAL CONST?�5TION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: f �2 ,e 4 Gary A. Gl ot, P eesssiiident iakid P. Relos, mber Elizabeth A Maradik, Member ��� There J.Dorau, tuber '4 Ja7 A. Mueller, Member Change Order No. 24 One- Way to Two -Way Street Conversion Division B Project No. 116-001 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. Patrick K. Wooden, P.E. Professional Engineer No. 10504741 CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion, Division B Project No. 116-001 SUBJECT: Additional Pavement Milling & Resurfacing ISSUE DATE: September 16, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Add milling and HMA resurfacing on Division B, along Michigan Street between Ewing Street and Sample Street, as directed by the Owner. The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS: 1. Bid/Proposal Form: Division B: Add 32,125 SYS to Line Item 044: MILLING, ASPHALT, 1 1/2 INCH, 32,125 SYS @ $1.75/SYS for a total addition of $56,218.75 Add 2811 TON to Line Item 453: HMA SURFACE TYPE C, 9.5 MM, 2811 TON @ $84.26/TON for a total addition of $236,854.86 SPECIFICATIONS: NO CHANGE REQUIRED Sheet 1 of 3 DRAWINGS: Change Order No. 24 One- Way to Two -Way Street Conversion Division B Project No. 116-001 AS -BUILT CHANGES REQUIRED, AS DIRECTED BY OWNER END OF CHANGE ORDER NO. 24 Sheet 2 of 3 Project No. 116-001 Change Order No. 24 — 9/16116 pIIlg& CITY OF SOUTH BEND a ]NLS PROJECT NAME: One -Way to Two -Way Street Conversion — Division B PROJECT NUMBER: 116-001 Division A: Item No. Description Quantity Unit Unit Price otal Amount 044 MILLING, ASPHALT, 11/2INCH 32,125 SYS $1.75 $56,218.75 EWA HMA SURFACE TYPE C, 9.5 MM 2811 TON $84.26 $236,854.86 OWNER: City of South Bend CONTRACTOR: Rieth-Riley Construction Signature Date Date $293,073.61 Sheet 3 of 3 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 09/20/16 Name Toy Villa —21�7 Department Engineering BPW Date 09/27/16 Phone Extension 5920 Required Prior to Submittal to Board Legal ® Attorney Name Michael Schmidt Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Re to Advertise ❑ Quote Opening ❑ Quote Award q ❑Title Sheet ® Change Order No. 7 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control I-1 Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Required Inform, Reith Riley Construction Yes No t ❑ MBE ❑ WBE LJ No LJ Yes Name of Company South Bend One Way to Two Way Conversion — Division B 116-001 2015 TIF Approval of Change Order #7 ❑ Required Contractor's Certification Form Attached (Non - Amount of N Increase ❑ Decrease Previous Amount $ 16 Current Percent of Change: 1.73 New Amount $ 17 Total Percent of Change: 6.92 Copy Original ® ❑ Michael Divita am - ired For Change Orders Only 293,073.61 54,944.70 48,018.31 )ispersal After Approval Beth Leonard, Judy Love