Loading...
HomeMy WebLinkAboutChange Order No. 5 - Rieth Riley - SB One Way to Two Way Conversion1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS September 27, 2016 Mr. John A. Yadon Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 PHONE 574/235-9251 FAX 574/235-9171 RE: Change Order No. 5 - South Bend One -Way to Two -Way Conversion, Div. A Project No. 116-001 Dear Mr. Yadon: The Board of Public Works, at its meeting held on September 27, 2016, approved the above referenced Change Order for an increase of $83,286.98, bringing the current contract amount to $3,435,946.47. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, l Linda M. Martin, Clerk Enclosure c: Toy Villa, Engineering GARY A. GILOT DAVID P. RELOS ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU CITY OF SOUTH BEND, INDIANA!. ��SoTA Btry. DEPARTMENT OF PUBLIC WORKS`f �°''�a PROJECT CHANGE ORDER esg DATE: 9/10/2016 0:00:00 PROJECT NO: 116-001 DIVA PROJECT NAME: 116-001 South Bend One-way to Two-way Conversion CONTRACT DATE: 2/26/2016 CHANGE ORDER NO: 5 SUBJECT OF CHANGE ORDER: PCR #5-Signal Controller & Cabinet Upgrades (Change Order 19) The original contract sum $ 3,228,358,03 Net change by previously authorized change orders $ 124,301.46 The contract sum prior to this change order $ 3,352,659.49 By this Change Order, the project amount is Increased Decreased $ 83,286.98 The new contract sum including this change order $ 3,435,946.47 This Change Order represents a total change of 2.48 % Total change for entire project 6.43 % Original contracted completion date/time 6/1/2017 Extension of date/time by previous change orders 0 days Date/time extension by this change order 0 days New completion date/time 6/1/2017 CONTRACTOR o tr ctor Si ature Pnnte Name T7t Rieth-Riley Construction CO., INC. Company Name 25200 State Road 23 Address South Bend, Indiana, 46614 City, State, Zip RECOMMENDED FOR APPROVAL CON UCTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: 17 of Gary A. Gilot, President David P. Rel�os, M dmber "k Elizabeth A Maradik, Member Therese J. DorM, fKember Jam,e""s A. Mueller, Member Project No, 116-001 Change Order No. 19 - 107/22/16 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. C. Ryan Huebschman, P.E., PTOE Professional Engineer No. 11400171 CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Street Conversion Project No. 116-001 SUBJECT: Signal Controller & Cabinet Upgrades ISSUE DATE: August 29, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Add thermal imaging detection equipment at the following intersections: PA Intersection Division Lafayette Boulevard & LaSalle Avenue B Michigan Street & Monroe Street B St Joseph Street & Western Avenue B Replace signal cabinets and traffic signal controllers at the intersections listed below for modernization purposes and/or to accept thermal imaging detection equipment: Intersection Division Main Street & Indiana Ave B Main Street & Calvert St B Main Street & Ewing Ave A St Joseph Street & LaSalle Avenue B St Joseph Street & Washington Street B St Joseph Street & Jefferson Boulevard B St Joseph Street & Western Avenue B Michigan Street & South Street B _.Michigan St & Indiana Ave B Michigan St & Calvert St B Michi an St wing Ave A Michi an St & Donmo er Ave A 3. Adjust the existing signal controllers and modify existing controller cabinet wiring of the intersections below to accept both pedestrian and vehicular detection and/or to accommodate 5- section signal heads: Intersection Division Main Street & Colfax Avenue B Main Street & Washington Street 13 Project No. 116-001 Main Street & Jefferson Boulevard B Main Street & Wayne Street B Main Street & Western Avenue B Main Street & Monroe Street B Main Street & South Street B Main Street & Bronson Street B Main Street & Sample Street B Michigan Street & Sample Street B Note: This work is not detailed in the plans. Change Order No.19 - 107/22/16 The following sections of the Contract Documents are revised as a result of the above changes: 1. Bid/Proposal Form: Division A: Revise EWA Line Item No. 139: `TRAFFIC SIGNAL EQUIPMENT, REMOVE", from 4 EACH @ $1,653.00/EACH to 7 EACH @ $1,653.00/EACH for a Total Increase of $4,959.00. Revise EWA Line Item No, 155: "THERMAL DETECTION CAMERA'; from 2 EACH @ $4, 676.50/EACH to 4 EACH @ $4, 676.50 for a total increase of $9, 353.00 Add EWA Line Item No. 246 "Controller and Cabinet, P1", 3 EACH @ $22,991.66/EACH for a Total Increase of $68,974,98, For a total Increase of Division A of $83,286.98 AR . c31 Revise EWA Line Item No. 21: `TRAFFIC SIGNAL EQUIPMENT, REMOVE", from 217 EACH @ $120/EACH to 226 EACH @ $120/EACH for a Total Increase of $1,080.00. Revise EWA Line Item No. 239: "TESCO CABINET W/SINGLE SERVICE, FOUNDATION, WIRING, ETC.' from 22 EACH @ $6,250.00/EACH to 23 EACH @ $6,250.00/EACH for a Total Increase of $6,250.00. Revise EWA Line Item No. 276: "THERMAL DETECTION CAMERA" from 12 EACH @ $4, 680.00/EACH to 22 EACH @ $4, 680.00/EACH for a Total Increase of $46, 800.00. Revise EWA Line Item No. 277: "THERMAL DETECTION SYSTEM", from 4 EACH @ $11, 800.00/EACH to 7 EACH @ $11, 800.00/EACH for a Total Increase of $35,400.00. Add EWA Line Item No. 467: "Controller Rewire", 10 EACH @ $2,231.77 /EACH for a Total Increase of $22,317.70. Add EWA Line Item No. 468: "Controller and Cabinet, P1", 9 EACH @ $23,899.97/EACH for a Total Increase of $215,099.73. Add EWA Line Item No. 469: "Ped Isolation Cards" 40 EACH @ $_561.71/EACH for a Total Project No. 116-001 Change Order No. 19 - 107/22/16 Increase of $ 22,468.40. Total Increase for Division B of $349,415.83 The following special provisions have been amended or added to the Contract Documents and are issued as a part of this Change Order: CLX70(111- CONTROLLER AND CABINET A. Prevailing Specification: 2016, INDOT Standard Specifications Sections 805 and 922 B. Additions: 1. New ACS/3-1000 or greater controllers are to be installed of the existing controllers at each of the following intersections: Division A a) Main Street & Ewing Ave b) Michigan St & Ewing Ave c) Michigan St & Donmoyer Ave Division B a) Main Street & Calvert St b) Main Street & Indiana Ave c) St Joseph Street & LaSalle Avenue d) St Joseph Street & Washington Street e) St Joseph Street & Jefferson Street f) St Joseph Street & Western Avenue g) Michigan Street & South Street h) Michigan St & Calvert St i) Michigan St & Indiana Ave Existing cabinets and controllers at these locations shall be removed and delivered to the City of South Bend at the salvage location specified in this document. CLXXXIII. CONTROLLER, REWIRE A. Prevailing Specification: 2016, INDOT Standard Specifications Sections 805 and 922 B. Additions: 1. Rewiring of the existing controller to accommodate detection and/or additional signal phases is required at the following intersections: a) Main Street & Colfax Avenue b) Main Street & Washington Street c) Main Street & Jefferson Boulevard d) Main Street & Wayne Street e) Main Street & Western Avenue f) Main Street & Monroe Ave g) Main Street & South Street h) Main St & Bronson St i) Main Street & Sample Street j) Michigan Street & Sample Street The following sheets have been revised or issued as new sheets. Division A Revision 5 Project No. 116-001 Sheet 2 — Revision Note No 5 Added Sheet 14 - Replaced Cabinet & Controller Sheet 15 - Replaced Cabinet & Controller Sheet 16 - Replaced Cabinet & Controller Division B Revision 14 Sheet 2 — Revision Note No 14 Added Sheet 143 - Replaced Cabinet & Controller Sheet 144 - Replaced Cabinet & Controller Sheet 156 - Replaced Cabinet & Controller Sheet 157 - Replaced Cabinet & Controller Sheet 163-A Replaced Cabinet & Controller Sheet 164-A — Replaced Sheet, Added Thermal Detection Sheet 165-A — Replaced Sheet, Added Thermal Detection, Cabinet Sheet 167-A — Replaced Cabinet & Controller Sheet 168-A — Replaced Cabinet & Controller Sheet 170-A — Replaced Cabinet & Controller Sheet 175-B — Replaced Sheet. Added Thermal Detection END OF CHANGE ORDER NO. 21 OWNER: City of South Bend Signature Date Change Order No. 19 - 107I22116 Replaced Cabinet & Controller, Added TESCO CONTRACTOR: Rieth-Riley Construction Signature Date //7-/(3 /NTH `MILEY Mr. Myron Cohagan Lochmueller Group 130 South Main St. Suite 300 South Bend, IN 46601 RE: Division A, EWA 008: New Signal Cabinets Dear Mr. Cohagan, September 6, 2016 Per your request, the following is Rieth-Riley's pricing for the three new traffic signal cabinets and controllers as required in Change Order #21 of Division A. Please understand that the current lead time for these cabinets is eight to ten weeks after approval of this pricing. As a result, additional contract time may be required to perform this work. Upon approval of this change order we will release these materials for manufacturing at which time we can discuss the timeline for this additional work. Item # Qty Unit Description Unit Price Total 139 3 EA Traffic Signal Equipment, Remove $1,653.00 $4,959.00 155 2 EA Thermal Detection Camera $4,676.50 $9,353.00 EWA 3 EA Controller & Cabinet, PI $22,991.66 $68,974.98 TOTAL $83,286.98 I have attached all the documentation which supports this pricing. Please let me know if you have any questions or require any additional information. Respectfully, Sc -H- Ki,s-k,>wh-i,r k, Scott Kirkpatrick Estimator/Project Manager Rieth-Riley Construction 25200 5.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (574) 288-8321 • FAX: (574) 2333464 ICA EXTRA WORK AGREEMENT CONTRACT: 116-001 PROJECT' Division A, Two -Way Streets FORCE ACCOUNDEXTRA WORK FOR: EWA 008 Traffic Signal Conctmllers LABOR 109.04 (a) WEEK ENDING: September 6 2016 EMPLOYEE Regular OVMima Doubletime I TOTAL j RATE I EXTENSION INEER 0.00 $36.00 $0.00 SHER, CRAFT FOREMAN ELKHARTIST JOE 0.00 $32.17 $0.00 HER, CRAFT FOREMAN LAPORTE 0.00 $0.00 SHER, JOURNEYMAN ELKHARTIST JOE 0.00 $29.92 $0.00 FINISHER, LAPORTE 0.00 $0.00 EMAN, ELKHART/ ST. JOSEPH 0.00 $24.15 $0.00 EMAN, ESOP 0.00 $40.00 $0.00 EMAN, FINISHER ELKHART I ST, JOSEPH o.00 $32.82 EMAN, FINISHER, LAPORTE 0.00 $0.00 EMAN, LAPORTE j 0.00 $0.00 RER, ELKHARTI ST. JOSEPH 0.00 $22.62 $0.00 RER LAPORTE 0.00 $Y3.62 $0.00 HANIC 0.00 $35AD $0.00 RATOR ELKHART 0.00 $29.15 $0.00 ATOR LAPORTE I ST. JOSEPH 0.00 $39.85 $0.00 ECH 0,00 $30.00 $0.00 ECT SUPERINTENDENT 4,00 4.00 $50.00 $200.00 STER 0.00 $27.91 $0.00 TOTAL LABOR $200.00 (1) FICA 7.65 % x UNE(1) $15,30 (2) FRINGES EMPLOYEE HOURS I I RATE I EXTENSION ENGINEER _ 0.00 x $12,50 = $0.00 _ FINISHER, CRAFT FOREMAN ELKHART _ -_ 0.00 x -- $13.44 I-____ _ $0.00 FINISHER, CRAFT FOREMAN LAPORTE p.00___X $13.44 _ $0.00 _ FINISHER_JOURNEYMAN ELKHART _ _ _ 0.00 % $13_44 = _ _ $0.00 ER.. JOURNEYMAN IAPORTE 0.00 % $13.44 _ MIRE FOREMAN ELKHARTIST. JOSEPH 000 x_' $17.001 _ __$0.00 I $0.00 FOREMAN ESOP _ OAO x �_ $150111 $0.00 _ FOREMAN FINISHER, ELKHARTIST JOSEPH _- 0.00 %_j _ $1344 = $0.00 FOREMAN FINISHER, LAPORTE 0.00 X. r $73 44 $0.00 FOREMAN LAPORTE 0,00 x ( $1700 - $0.00 LABORER, ELKHART/ ST. JOSEPH 0,00 % $12.96 - _4_-�.- $0.00 LABORER,LAPORTE MECHANIC 6.00 _ X 1 $13.96 000 _ x $16_68 = = $0.00 $0.00 OPERATOR ELKHART 0.00 x ! $22.77 - $0.00 OPERATOR LAPORTE /ST. JOSEPH 0.00 = 8.15 = $0.00 CA TECH 0600 _-x T- $12.50 $0.00 PROJECT SUPERINTENDENT Aa0 _ $12.50 = $50.00 TEAMSTER Goo x $13.44 = $0.00 TOTAL FRINGES _ $50.00 (3) WORKERS COMPENSATION 19.60 % x LINE (1) $39.20 (4) BODILY INJURY INSURANCE 2.10 % x LINE (1) $4.20 (5) PROPERTY DAMAGE INSURANCE 0.00 % x LINE (1) $0.00 (6) STATE UNEMPLOYMENT 4.30 % x LINE (1) $8.60 (7) FEDERAL UNEMPLOYMENT 0.80 % x LINE (1) $1.60 (8) TRAVEL ALLOWANCE OR SUBSISTENCE(NOTE a3) $0.00 (9) TOTAL LINES 1, 2, 3, 4, 5, 6, 7, 6 8 9 $318.90 (10) 2()%xLINE(10) $63.78 (11) GRAND TOTAL LABOR LINES (10) + (11) $382.68 (12) Page 1 of 3 INSURANCE. TAXES 109.04 WEEKENDING: September6 2016 INSURANCE TAXES MATERIAL 109.04 (c) ma TOTAL: LINE (13)+(14) $0.00 (15) 10 % x LINE (15) $0.00 (16) GRAND TOTAL FOR INSURANCE, TAXES: UNE (15) + (16) $0.00 (17) WEEKENDING: September6 2016 MATERIALS PURCHASED: $0.00 (18) MATERIALS MANUFACTURED $0.00 (19) TOTAL: LINE(18)+(19) $0.00(20) 12 %x LINE (20) $0.00 (21) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) $0.00(22) EQUIPMENT 109.04 !d) WEEK. ENDING: September6 2016 CONTRACTOR OWNED EQUIPMENT BLUE BOOK FlOJUSi 6 molm'HnanTei ne as BLUE BOOKOPERATIBE RATE r HR 81-H BOOKTOTPL coET PER HOUR HOURS EXTENSION PICK-UP TRUCK 3/4 TON $8.751 $12.481 $21.23 4.001 $84.92 PICK-UP TRUCK TON $9.891 $13.781 $23.67 1 $0.00 FLATRACK TRUCK $16.66 $16.851 $33.51 $0.00 LOWBOY $47.63 $43.251 $90.88 $0.00 TILT TOP TRAILER $5.50 $2.851 $9,35 $0.00 TRI-AXLE DUMP TRUCK $38.12 $41.101 $79.22 $0.00 QUAD -AXLE DUMP TRUCK $40.59 $42.501 $83.09 $0.00 CX75 EXCAVATOR $45.54 $16.951 $62.49 $0.00 CX210 EXCAVATOR $73.26 $36.101 $109.36 $0.00 CX330 EXCAVATOR $113.85 $59.301 $173.151 $0.00 850 DOZER $53.89 $26.301 $80.191 $0,00 SKIDSTEER $26.601 $15.201 $41.801 $0.00 CAST 938 LOADER $42.56 $23.651 $66.211 $0.00 CAT 950 LOADER $56.951 $28.001 $84.951 $0.00 MAINTAINER $41.371 $20.151 $61.521 $0.00 GRADER 12 $55.03 $27.301 $82.331 $0.00 GRADER 140 $61.31 $30.801 $92.11 $0.00 Dirt Roller $34.95 $22.75 $57.70 $0.00 Asphalt Pave $268.08 $88A5 $356.53 $0.00 Asphalt Distributor $34.70 $8.70 $43.40 $0.00 ROLLER 3-5 TON $78.59 $27.10 $105.69 $0.00 ROLLER 8-12 TON $93.44 $29.10 $122.54 $0.00 AIR COMPERSSOR $19.20 $8.12 $27.32 $0.00 TOTAL CONTRACTOR OWNED EQUIPMENT $84.92 (23) RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES) MOO (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $84.92 (26) 12 %x LINE (26) $10.19 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26)+ (27) $95.11 (28) Page 2 of 3 SUBCONTRACTORS 109.04 (f) WEEK ENDING: September 6, 2016 DESCRIPTION TOTAL SUBCONTRACT WEEK ENDING $20,700.00 (29) 10 %x LINE (30) $3,000.00 OR LESS $300.00 (31) 7 % x LINE (30) OVER $3,000.00 $1,239.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $22,239.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) 1.1 % OF BOND RATE BASED UPON LINE (34) 10 % x LINE (35) TOTAL EXTRA WORK LINES: (34) + (35) + (36) Page 3 of 3 $22,716.79 (34) $249.88 (35) $24.99 (36) $22,991.66 (37) MARTELL QUOTE No.: MA R TEL L 01-0216 RE: Rieth-Riley CONTRAG'TCJRS 6 ENGINEERS TO: 4601 Cleveland Road South Bend, IN 46628 PHONE: (574) 271-5000 FAX: (574) 271-5400 DATE: 8/10/16 ITEM NO_ QTY UNIT DESCRIPTION UNIT COST TOTAL COST i 3 EA NEW P1 CABINETS AND CONTROLLERS 20,700.00 62,100.00 NOTES: 1 THIS QUOTE INCLUDES REVISIONS/ADDENDA 1 ,2 AND 3. 2 THIS QUOTE DOES NOT INCLUDE ELECTRICAL UTILITY CHARGES OF ANY TYPE. 3 THIS QUOTE I5 BASED ON STRAIGHT TIME LABOR RATES UNLESS OTHERWISE DEFINED IN SPECIFICATIONS 4 THIS QUOTE IS CONTINGENT UPON MARTELL ELECTRIC GETTING ADEQUATE TIME TO COMPLETE OUR WORK. 5 THE ABOVE ITEMS ARE QUOTED AS A COMPLETE PACKAGE. NO ITEM MAY BE DELETED WITHOUT PRIOR APPROVAL. TOTAL 62,100.00 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 09/20/16 Name Toy Villa Department Engineering BPW Date 09/27/16 Phone Extension 5920 Required Prior to Submittal to Board Legal ® Attorney Name Michael Schmidt Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑ Contract ❑Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ® Change Order No. 5 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control Fl Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Required Information Reith Riley Construction Co., Inc. Yes No ❑ If Yes, Ap ❑ MBE Fl WBE No ❑ Yes Name of South Bend One Way to Two Way Conversion — Division A 116-001 SSDA TIF 430.1050.460.31.36 Approval of Change Order #5 ❑ Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination. Non -Debarment_ F-Verifv Iran Mi I Required For Chance Orders Only I Amount of Previous Amount Current Percent of Change: New Amount Total Percent of Change: Copy Original ® ❑ ® ❑ 2.46ulo $ 3,435,946.47 6.43% Dispersal After Michael Divita Leonard, Judv Love