HomeMy WebLinkAboutChange Order No. 2 - Century Center Electrical Distribution Upgrades Proj No. 116-0071316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS September 27, 2016 Mr. Robert Romine Days Electrical 55169 CR3 Elkhart, IN 46514 RE: Change Order No. 2 - Century Center Electrical Distribution Upgrades Project No. 116-007 Dear Mr. Romine: PHONE 574;235-9251 FAX 574/235-9171 The Board of Public Works, at its meeting held on September 27, 2016, approved the above referenced Change Order for an increase of $1,376.00, bringing the current contract amount to $$89,877.08. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure c: Richard Estes, Engineering Toy Villa, Engineering GARY A. GILOT DAVID P. RELOS ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU CITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: 9-16-2016 PROJECT NO: 116-007 PROJECT NAME: Century Center Electrical Distribution Upgrades CONTRACT DATE: 05/19/2016 CHANGE ORDER NO. 2 SUBJECT OF CHANGE ORDER: Emer_gencv repair of damaged eauioment All items completed substantially as planned overruns and The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time $ 76,069.00 $ 12,432.08 $ 88,501.08 ® Increased ❑ Decreased $ 1,376.0 $ 89,877.08 16 / J4�11 \ ,14�7 CONTRACTOR Project Manager C�onttr ctoor Signature / Printed Name and Title( Days Electric Company name 55169 C.R. 3 Address Elkhart, IN 46514 City, State, Zip 1.80 % 18.15 % CITY OF SOUTH BEND BOARD OF PUBLIC WORKS ApprovAd,Date: _, -";,� , �- ' avid�P. Relos^ mber Therese J. Dorau, MefnbW James A. Mueller, Member INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Richard Estes, Engineer I SUBJECT: Change Order #2 for Century Center Electrical Distribution Upgrades Project No. 116-007 DATE: September 16, 2016 Herewith is an explanation for the Change Order being submitted. The reason(s) for the Change Order request are as follows: Replaced the damaged fused switch feeding AHU-3 and AHU-4. During repair of fused switch located in the main switchgear for an issue that was found during thermal scan of equipment is was discovered that the switch was damaged beyond repair. Parts for the existing switchgear are no longer available so the existing fused switch was replaced with a new remote mounted 200 amp fused safety switch. Items 1 is an emergency repair that was required when it was found that the existing fused switch had failed. The cost for the work will be $1,376.00. This brings the total increase to 18.15% for the overall project cost. This includes previously approved changes of $12,432.08 in change order #1. Please call me with your questions (5896). Change Order No.2 Century Center Electrical Distribution Upgrades Project No. 116-007 OWNER: City of South Bend ENGINEER: M/E Design Services CONTRACTOR: Days Electrical PROJECT: Century Center Electrical Distribution Upgrades SUBJECT: Clarifications and Revisions to Contract Documents ISSUE DATE: September 16, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: Replaced the damaged fused switch feeding AHU-3 and AHU-4. During repair of fused switch located in the main switchgear for an issue that was found during thermal scan of equipment is was discovered that the switch was damaged beyond repair. Parts for the existing switchgear are no longer available so the existing fused switch was replaced with a new remote mounted 200 amp fused safety switch. This was an emergency repair that was required to keep the AHU's operational at the facility. SHEET 1 OF 2 Change Order No.2 Century Center Electrical Distribution Upgrades Project No. 116-007 The following sections of the Contract Documents are revised as a result of the above changes: BID/PROPOSAL: Replace damaged 200 Amp/3 pole fused safety switch, Lump Sum of $1,376.00 SHEET 2 OF 2 Date Name BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM 9/20/2016 Department Public Works Richard Estes Division/Bureau Engineering BPW Date 9/27/2016 Phone Extension 5896 Required Prior to Submittal to Board Legal ® Attorney Name: Michael Schmidt Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ® George King Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ® Change Order No. 2 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control: ❑ Other: Company or Vendor Name Days Electric New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description ❑ Yes ® No ❑ If Yes, Approved by Hotel -Motel Tax 7304-42010-0000-0099 Cost increase to cover emergency repair of A/C controller for the Convention Halls. ❑ Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) Required For Change Orders Only Amount of ® Increase $ 1,376.00 ❑ Decrease $ Previous Amount $ 88,501.08 Current Percent of Change: 1.80% New Amount $ 89,877.08 Total Percent of Change: 18.15% Copy Original ® ❑ Scott Herczeg — Century Center ® ❑ Leanna Belew — Century Center ® ❑ Brandon Gerlach — Century Cen