Loading...
HomeMy WebLinkAboutPSA - Lawson-Fisher - Prepare Bid Docs for Emergency Repair of Ireland Rd E of Ironwood1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS September 13, 2016 Mr. Michael J. Guzik, P. E. Lawson -Fisher Associates, P.C. 525 West Washington Avenue South Bend, IN 46601 PHONE 574/235-9251 FAX 574/235-9171 RE: Professional Services Agreement — Prepare Bid Documents for Emergency Repair of Ireland Road East of Ironwood Road Dear Mr. Guzik: The Board of Public Works, at its meeting held on September 13, 2016, approved the above referenced agreement in the amount not to exceed $9,000.00. Enclosed please find a copy of the agreement for your records. If you have any farther questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT DAVID P. RELOS ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date September 6, 2016 Name Roger Nawrot Department Engineering BPW Date September 13, 2016 Phone Extension 5932 L Required Prior to Submittal to Board Legal ® Attorney Name Michael Schmidt Controller ® Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ® George King Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑Contract ❑ Proposal ❑ Addendum ® Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Change Order No. ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control n Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Amount of U Increase ❑ Decrease Previous Amount Current Percent of Change: New Amount Total Percent of Chance: Copy Original ® ❑ Fisher Associates P.C. No [ ] WBE Yes Name of Compa cy Repair of Ireland Ro 11 Major Moves 412.0602.431.42.03 Qo nnn nn Road Not to Exceed To prepare bid documents to repair the pavement and shoulder washout out caused by the August storm.. ❑ Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) ired For Change Orders Roger Nawrot DCI — Jitin Kain Lawson — Fisher P.C. EJCDC= ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES THIS IS AN AGREEMENT effective as of September 13, 2016 ("Effective Date") between Board of Public Works City of South Bend Indiana ("Owner") and Lawson -Fisher Associates P.C., 525 West Washington Avenue South Bend Indiana 46601 ("Engineer"). Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as follows: Emergency Repair of Ireland Road Pavement Undermining ("Project"). Engineer's Services under this Agreement are generally identified as follows: As requested by the City of South Bend Indiana develop construction documents in quote form for repairs to the existing pavement alone the south edge of Ireland Road between Growing Kids and the Irish Hills Apartments. Owner and Engineer further agree as follows: 1.01 Basic Agreement and Period of Service A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If authorized by Owner, or if required because of changes in the Project, Engineer shall furnish services in addition to those set forth above. Owner shall pay Engineer for its services as set forth in Paragraphs 7.01 and 7.02. B. Engineer shall complete its services within a reasonable time, or within the following specific time period: Project Schedule is located in Appendix 2. C. If the Project includes construction -related professional services, then Engineer's time for completion of services is conditioned on the time for Owner and its contractors to complete construction not exceeding N/A months. If the actual time to complete construction exceeds the number of months indicated, then Engineer's period of service and its total compensation shall be appropriately adjusted. EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright C 2008 National society of Professional Engineers for EJCDC. All rights reserved. 2.01 Payment Procedures A. Invoices: Engineer shall prepare invoices in accordance with its standard invoicing practices and submit the invoices to Owner on a monthly basis. Invoices are due and payable within M 35 days of receipt —If 1 01 per - - 1- the rare of ipAerest « fmitted by !a% e if less) 40M said ♦hiFti_th day. In addition, Engineer may, after giving seven days written notice to Owner, suspend services under this Agreement until Engineer has been paid in full all amounts due for services, expenses, and other related charges. Owner waives any and all non -disputed claims against Engineer for any such suspension. 3.01 Termination A. The obligation to continue performance under this Agreement may be terminated: 1. For cause, a. By either parry upon 30 days written notice in the event of substantial failure by the other parry to perform in accordance with the Agreement's terms through no fault of the terminating parry. Failure to pay Engineer for its services is a substantial failure to perform and a basis for termination. b. By Engineer: 1) upon seven days written notice if Owner demands that Engineer furnish or perform services contrary to Engineer's responsibilities as a licensed professional; or 2) upon seven days written notice if the Engineer's services for the Project are delayed for more than 90 days for reasons beyond Engineer's control. Engineer shall have no liability to Owner on account of a termination by Engineer under Paragraph 3.0l .A.l .b. c. Notwithstanding the foregoing, this Agreement will not terminate as a result of a substantial failure under Paragraph 3.0I I.A. La if the party receiving such notice begins, within seven days of receipt of such notice, to correct its substantial failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of notice; provided, however, that if and to the extent such substantial failure cannot be reasonably cured within such 30 day period, and if such parry has diligently attempted to cure the same and thereafter continues diligently to cure the same, then the cure period provided for herein shall extend up to, but in no case more than, 60 days after the date of receipt of the notice. 2. For convenience, by Owner effective upon Engineer's receipt of written notice from Owner. B. The terminating parry under Paragraph 3.01.A may set the effective date of termination at a time up to 30 days later than otherwise provided to allow Engineer to complete tasks whose value would otherwise be lost, to prepare notes as to the status of completed and uncompleted tasks, and to assemble Project materials in orderly files. EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. C. In the event of any termination under Paragraph 3.01, Engineer will be entitled to invoice Owner and to receive full payment for all non -disputed services performed or furnished in accordance with this Agreement and all reimbursable expenses incurred through the effective date of termination. 4.01 Successors, Assigns, and Beneficiaries A. Owner and Engineer are hereby bound and the successors, executors, administrators, and legal representatives of Owner and Engineer (and to the extent permitted by Paragraph 4.01.B the assigns of Owner and Engineer) are hereby bound to the other party to this Agreement and to the successors, executors, administrators, and legal representatives (and said assigns) of such other parry, in respect of all covenants, agreements, and obligations of this Agreement. B. Neither Owner nor Engineer may assign, sublet, or transfer any rights under or interest (including, but without limitation, moneys that are due or may become due) in this Agreement without the written consent of the other, except to the extent that any assignment, subletting, or transfer is mandated or restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. C. Unless expressly provided otherwise, nothing in this Agreement shall be construed to create, impose, or give rise to any duty owed by Owner or Engineer to any contractor, subcontractor, supplier, other individual or entity, or to any surety for or employee of any of them. All duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of Owner and Engineer and not for the benefit of any other party. 5.01 General Considerations A. The standard of care for all professional engineering and related services performed or furnished by Engineer under this Agreement will be the care and skill ordinarily used by members of the subject profession practicing under similar circumstances at the same time and in the same locality. Engineer makes no warranties, express or implied, under this Agreement or otherwise, in connection with Engineer's services. Subject to the foregoing standard of care, Engineer and its consultants may use or rely upon design elements and information ordinarily or customarily furnished by others, including, but not limited to, specialty contractors, manufacturers, suppliers, and the publishers of technical standards. B. Engineer shall not at any time supervise, direct, control, or have authority over any contractor's work, nor shall Engineer have authority over or be responsible for the means, methods, techniques, sequences, or procedures of construction selected or used by any contractor, or the safety precautions and programs incident thereto, for security or safety at the Project site, nor for any failure of a contractor to comply with laws and regulations applicable to such contractor's furnishing and performing of its work. C. This Agreement is to be governed by the law of the state or jurisdiction in which the Project is located. D. Engineer neither guarantees the performance of any contractor nor assumes responsibility for any contractor's failure to furnish and perform its work in accordance with the contract between Owner Page 3 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. and such contractor. Engineer is not responsible for variations between actual construction bids or costs and Engineer's opinions or estimates regarding construction costs. E. Engineer shall not be responsible for the acts or omissions of any contractor, subcontractor, or supplier, or of any of their agents or employees or of any other persons (except Engineer's own employees) at the Project site or otherwise furnishing or performing any construction work; or for any decision made regarding the construction contract requirements, or any application, interpretation, or clarification of the construction contract other than those made by Engineer. F. The general conditions for any construction contract documents prepared hereunder are to be the "Standard General Conditions of the Construction Contract" as prepared by the Engineers Joint Contract Documents Committee (EJCDC C-700, 2007 Edition) unless the parties agree otherwise. G. All documents prepared or furnished by Engineer are instruments of service, and Engineer retains an ownership and property interest (including the copyright and the right of reuse) in such documents, whether or not the Project is completed. Owner shall have a limited license to use the documents on the Project, extensions of the Project, and for related uses of the Owner, subject to receipt by Engineer of full payment for all services relating to preparation of the documents and subject to the following limitations: (1) Owner acknowledges that such documents are not intended or represented to be suitable for use on the Project unless completed by Engineer, or for use or reuse by Owner or others on extensions of the Project, on any other project, or for any other use or purpose, without written verification or adaptation by Engineer; (2) any such use or reuse, or any modification of the documents, without written verification, completion, or adaptation by Engineer, as appropriate for the specific purpose intended, will be at Owner's sole risk and without liability or legal exposure to Engineer or to its officers, directors, members, partners, agents, employees, and consultants; (3) Owner shall indemnify and hold harmless Engineer and its officers, directors, members, partners, agents, employees, and consultants from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from any use, reuse, or modification of the documents without written verification, completion, or adaptation by Engineer; and (4) such limited license to Owner shall not create any rights in third parties. H. To the fullest extent permitted by law, Owner and Engineer (1) waive against each other, and the other's employees, officers, directors, agents, insurers, partners, and consultants, any and all claims for or entitlement to special, incidental, indirect, or consequential damages arising out of, resulting from, or in any way related to the Project, and (2) agree that Engineer's total liability to Owner under this Agreement shall be limited to $50,000 or the total amount of compensation received by Engineer, whichever is greater. I. The parties acknowledge that Engineer's scope of services does not include any services related to a Hazardous Environmental Condition (the presence of asbestos, PCBs, petroleum, hazardous substances or waste as defined by the Comprehensive Environmental Response, Compensation and Liability Act, 42 U.S.C. §§9601 et seq., or radioactive materials). If Engineer or any other party encounters a Hazardous Environmental Condition, Engineer may, at its option and without liability for consequential or any other damages, suspend performance of services on the portion of the Project affected thereby until Owner: (1) retains appropriate specialist consultants or contractors to identify and, as appropriate, abate, remediate, or remove the Hazardous Environmental Condition; and (2) warrants that the Site is in full compliance with applicable Laws and Regulations. Page 4 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. J. Owner and Engineer agree to negotiate each dispute between them in good faith during the 30 days after notice of dispute. If negotiations are unsuccessful in resolving the dispute, then the dispute shall be mediated. If mediation is unsuccessful, then the parties may exercise their rights at law. 6.01 Total Agreement A. This Agreement (including any expressly incorporated attachments), constitutes the entire agreement between Owner and Engineer and supersedes all prior written or oral understandings. This Agreement may only be amended, supplemented, modified, or canceled by a duly executed written instrument. 7.01 Basis ofPayment—Hourly Rates Plus Reimbursable Expenses A. Using the procedures set forth in Paragraph 2.01, Owner shall pay Engineer as follows: 1. An amount equal to the cumulative hours charged to the Project by each class of Engineer's employees times standard hourly rates for each applicable billing class for all services performed on the Project, plus reimbursable expenses and Engineer's consultants' charges, if any. 2. Engineer's Standard Hourly Rates are attached as Appendix 1. 3. The total compensation for services and reimbursable expenses is not to exceed $9,000. 7.02 Additional Services: For additional services of Engineer's employees engaged directly on the Project, Owner shall pay Engineer an amount equal to the cumulative hours charged to the Project by each class of Engineer's employees times standard hourly rates for each applicable billing class; plus reimbursable expenses and Engineer's consultants' charges, if any. Engineer's standard hourly rates are attached as Appendix 1. Attachments: Appendix 1, Engineer's Standard Hourly Rates Appendix 2, Engineer's Detailed Scope of Work EJCDC E-500 Agreement Between Owner and Engineer for Professional services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. IN WITNESS WHEREOF, the parties hereto have executed this Agreement, the Effective Date of which is indicated on page 1. Owner: City of South Bend, Indiana Board of Public Works � Title: Gary A. Gilo�t; r)essiiddent By:�(ilY� Title: EXvjd A. Pelos,11Member By: 1�1 Title: _E E Izabeth A. Maradik, Member By: Title: James A. Mueller. Member By: /, / — Title: Jhda h re4U. Doran, M ber ` Attest: t rLA. fvvLc� Title: Martin. Clerk Date: 9 % / 3 /, Cs/G. Engineer: Lawson -Fisher Associates P.C. By: Title: Michael J. Guzik, P.E(.Mce Prtsident Date: Engineer License or Firm's Certificate No. 10001145 State of Indiana Address for giving notices: Address for giving notices: 227 West Jefferson Boulevard 525 West Washington Avenue South Bend, Indiana 46601 South Bend, Indiana 46601 Designated Representative (Paragraph 8.03.A): Designated epresentatiivve (Paragraph 8.03.A): Patrick Corbitt Kerr, Ph.D., P.E. Title: City Engineer Title: Michael J. Guzik, P.E., Vice President Phone Number: (574) 235-5931 Phone Number: (574) 234-3167 Facsimile Number: (574) 235-9171 Facsimile Number: (574) 236-1330 E-Mail Address: pckerr@southbendin.gov E-Mail Address: mguzik@lawson-fisheccom Page 6 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. EJCDC= ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE This is Appendix 1, Engineer's Standard Hourly Rates, referred to in and part of the Short Form of Agreement between Owner and Engineer for Professional Services dated August 25, 2016. Engineer's Standard Hourly Rates A. Standard Hourly Rates: 1. Standard Hourly Rates are set forth in this Appendix 1 and include salaries and wages paid to personnel in each billing class plus the cost of customary and statutory benefits, general and administrative overhead, non -project operating costs, and operating margin or profit. 2. The Standard Hourly Rates apply only as specified in Paragraphs 7.01 and 7.02, and are subject to annual review and adjustment. B. Schedule of Hourly Rates: Hourly rates for services performed on or after the Effective Date are: Principal $ 200.00/hour Engineer IV 175.00/hour Engineer 111 135.001hour Engineer ll 120.00/hour Engineer I 110.00/hour Engineer Intern 85.00/hour CAD Technician II 115.00/hour CAD Technician l 85.001hour Surveyor I 105.00/hour Construction Inspector 111 150.00/hour Project Information II 115.001hour Project Information 1 75.00/hour Appendix 1, Standard Hourly Rates Schedule EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. Copyright bo2009 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 1 APPENDIX SCOPE OF WORK Project Understandine The rain event that occurred overnight on Monday, August 15, 2016 overwhelmed existing ditches and culverts along Ireland Road east of Ironwood Road, flooding the roadway and causing scour underneath the existing pavement. Immediate concern to the City is the repair of damage to the roadway. Secondary concern is the reestablishment of viable drainage facilities. The City has requested that plans be developed to address the emergency repair of this area and to reestablish viable off -pavement drainage facilities and the engineered Swale located between the Growing Kids building and Ireland Road. Professional services provided will be two -fold. The first phase includes contract documents for securing quotes for the pavement and roadside restoration at the Ireland Road Crossing. The second phase will be a roadside grading and other long term improvements for providing a storm runoff watercourse for a long term solution. PARTI. SCOPE OF SERVICES: A. Construction Documents I. Identify the locations requiring repairs to the pavement and adjacent shoulder section. 2. Develop quote package with repairs and limits indicated on an aerial drawing and in supplemental figures as required. 3. Deliver 10 copies of the complete quote package to the City for solicitation of quotes. 4. Provide a Construction Cost Estimate to the City. B. Construction Administration l . Coordinate kickoff meeting 2. Perform utility coordination through construction 3. Daily inspection as required (assumed 4 hrs/day for 1 week) 4. Review and process pay estimates and change orders 5. Coordinate final walk through 6. Develop punch list 7. Complete Project closeout PARTII. SCHEDULE, FEEAND CONDITIONS A. Schedule Time is of the essence due to the nature of the work and shall be completed measured in calendar days as described below: 1. Construction Documents as described in Part 1 will be complete within 15 days of Notice to Proceed or sooner. Appendix 2, Scope of Work EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. Copyright CO2009 National Society of Professional Engineers for EJCDC. All rights reserved. Pace 1 2. Quotes will be solicited by the Owner once construction documents are complete. Construction is anticipated to begin directly with an expected construction duration is 30 days. B. Fee 1. LFA proposes to provide the described Scope of Services on an hourly basis with an estimated budget of $9,000. A man-hour justification has been prepared for review of anticipated effort supporting this estimate. Allocated hours are not tied to specific tasks for fees. 2. If prior to the satisfactory completion of the professional services described, the total costs incurred is within 20% of estimated budget, LFA will notify the City and development status will be evaluated. C. Conditions The following items will be provided by the City or are otherwise considered an additional service not included with the described professional services: 1. It is understood that LFA shall have access to all City files and documents in its possession and at its disposal pertaining to this work. 2. Property acquisition transfer and payment will be provided by the City. 3. Quotes will be solicited by and an award made through the City. 4. LFA will invoice for the work completed on a monthly basis. Appendix 2, Scope of Work EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. Copyright Cci2009 National Society of Professional Engineers for EJCDC. All rights reserved. L.AWSON-FISHER. ASSOCIATES P.C. 525 WEST WASHINGTON AVENUE SOUTH BEND, INDIANA 4660I STAFF HOUR JUSTIFICATION - PROJECT DESIGN DEVELOPMENT PROJECT'. Ireland Road Pavement Edge Repair South Bend, Indiana August 24, 2016 Page I of I No. Work Element No. Slits STAFF HOURS BY CLASSIFICATION Total Hours Principal Civil Eng. IV Civil En _ III Civil En If CAD Tech, 11 CAD Tech. I Clerical Pavement Edge Repair Construction Documents Description of work and drawin s as required 2 4 8 2 2 18 Special Provisions 1 2 6 5 14 Quantities, Estimate and proposal Form 1 1 2 1 5 Utility Coordination 2 2 4 QA,/QC Check and Plan Revisions 2 2 1 I 1 7 Submission to City 1 2 1 4 Construction Adminishation Field Construction Inspection (41irs/da x 5 days) 20 20 TOTAL HOURS 0 7 7 42 5 1 3 8 72 BILLING RATE $20000 $175.00 $135.00 $125.00 $12500 1 $85.00 $115.00 ESTIMATED FEE 1,225.00 945.00 5,250.00 1 625.00 1 255.00 920.00 $ 9,300.00 LAWSON-FISHER ASSOCIATES P.C. 525 WEST WASHINGTON AVENUE SOUTH BEND, INDIANA 46601 Job#: Designed by: BPH Checked by: Sheet: Date: Date: Project: South Bend - Pavement Edge Repair of Ireland Rd. Subject: Conceptual Cost Estimate Project Description: Pavement Edge Repair of Ireland Road Storm Event Damage 08/23/16 No. Item Quantity Unit Unit Cost Total Cost 1 Mobilization - Demobilization 1 LSUM 2,500.00 $ 2,500.00 2 Construction Engineering 1 LSUM 1,500.00 1,500.00 3 Maintenance of Traffic 1 LSUM 1,500.00 1,500.00 4 Clearing Right -of -Way 1 LSUM 500.00 500.00 5 Flowable Fill, Removable 8 CYS 200.00 1,600 000 6 Compacted Aggregate, No. 53, Base 4 Ton 125.00 500.00 7 Miscellaneous Items (20%) 1 LSUM 500.00 500.00 Subtotal $ 8,600.00 + 15% Contingency Is 1290.00 Total (Rounded to nearest$1,000) 10:000.00 U. Ylom" Wt128. n2 - SOUTH BEND- EMERGENCY REPAIR OF IRELAND ROAD%ENG\[Ireland RzpaitsConst, Estimate, 8-22-16xls]She h (Road Repay only)