HomeMy WebLinkAboutUpcoming Schedule 9.18-10.1Upcoming Schedule
Sept 18th- Oct 1 st
• The Bartlett St. roundabout fully opened to northbound and southbound traffic
on Thursday morning, September 8, 2016.
• The Marion St. roundabout partially opened to northbound and southbound
traffic starting Thursday morning, September 8, 2016. At this time, northbound
traffic will exit the roundabout only on Michigan St. and southbound traffic will
exit only on Main St.
• The two -way conversion on Main St. and Michigan St. / St. Joseph St. will
continue into the fall of 2016. Main St. is expected to be fully converted to two -
way traffic by October 15, 2016 and Michigan St. / St. Joseph St. is expected to be
fully converted to two -way traffic by November 15, 2016.
• Streetscape work in the downtown area will also continue through the fall
causing partial lane closures throughout the area.
• The Chippewa Ave. roundabout fully opened to northbound and southbound
traffic on Thursday morning, September 8, 2016.
• Washington St. will close on Monday, September 19, 2016 between Lafayette
Blvd. and Main St. for utility work.
Leeper Park
Z
r
n�
m
K
fD �
m
L 0.
P
'race
V Navarre St
Riverside
O,.
Park Ln
.4
d
41e6rtlett St E Bartlett St
►.
W Marion St
Dinan Ct
Z
o
n
E Marion St
Corby l3k
6 Key
■ Lane Closure
■ Lane Restriction
■ Lane Open
o`
McDonalds
in
a�
+
E Madison St
The Pointe at St.
'
0
•
Joseph Apartments
le Ave
W Lasalle
Ave Z
E Lasalle Ave E Lasalle Ave
n
•'
LaSalle Grill Y+
(EE U11
f�Z
Fiddler's Hearth
20
00
H
DoubleTree by Hilton N
Hotel South Bend
d
Century Center A Seitz Park
3
F
v
=°
m
Healthworks
Kids' Museum °
1
Chicory Cafe
L Jeffers(
son Blvd
W
<
a
N
L
CL
°' o
o
e
W'l
W
Wayne St
E