Loading...
HomeMy WebLinkAboutChange Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS August 23, 2016 Mr. John A. Yadon Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 PHONE 574,235-9251 FAx 574/235-9171 RE: Change Order No. 5 — South Bend, One -Way to Two -Way Conversion — Division B Project No.116-001 Dear Mr. Yadon: The Board of Public Works, at its meeting held on August 23, 2016, approved the above referenced Change Order for an increase of $305,412.72, bringing the current contract amount to $16,591,778.87. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT DAVID P. RELOS ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: 8/11/2016 PROJECT NO: 116-001 DIV B PROJECT NAME: 116-001 South Bend One-way to Two-way Conversion CONTRACT DATE: 2/26/2016 CHANGE ORDER NO: 5 SUBJECT OF CHANGE ORDER: PCR #5-Traffic Signal Improvment (change order 9) Landscape Revision (Change Order 8) Ramp revision (Change Order 7) The original contract sum $ 16,131,908.36 Net change by previously authorized change orders $ 154,457.79 The contract sum prior to this change order $ 16,286 366.15 By this Change Order, the project amount is _ QX increased Decreased $ 305,412.72 The new contract sum including this change order $ 16,591 778.87 This Change Order represents a total change of 1.88 % Total change for entire project 2.85 % Original contracted completion date/time 6/1/2017 Extension of date/time by previous change orders 0 days Date/time extension by this change order 0 days New completion date/time 6/1/2017 CONTRACTOR RECOMMENDED FOR APPROVAL CONS!— -joN MA-14AGER-- Rieth-Riley Construction CO. INC. Company Name 25200 State Road 23 Address South Bend, Indiana, 46614 City, State, Zip CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Dale: 9 ;2 3/"20 )-u)`C Gary A. Gilot, President '- A �- Therese J. Dora , mber James A. Mueller, Member Change Order No. 07 One- Way to Two -Way Street Conversion Division B Project No. 116-001 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. Patrick K. Wooden, P.E. Professional Engineer No. 10504741 CONTRACTOR: Rieth-Riley Construction PROJECT: One -Way to Two -Way Street Conversion Project No. 116-001 SUBJECT: Revised Southeast quadrant of Main and Monroe ISSUE DATE: June 10, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Structure and curb ramp revision in the southeast quadrant of the intersection of Main and Monroe based on changed field information. Sheet 1 of 3 Change Order No. 07 One- Way to Two -Way Street Conversion Division B The following sections of the Contract �dcumeonts a e revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS- 1. Bid/Proposal Form: Division B: Subtract 2 CYS from Line Item 37: STRUCTURAL BACKFILL, TYPE 1, -2 CYS @ $21.60/CYS for a total deduction of ($43.20) Subtract 1 TON from Line Item 43: WIDENING WITH HMA, TYPE D, -1 TON @ $110.00/TON for a total deduction of ($-110.00) Add 2 SYS to Line Item 44: MILLING, ASPHALT, 1 % IN, 2 SYS @ $1.75/SYS for a total addition of $3,50 Subtract 4 SYS from Line Item 87: CURB RAMP, CONCRETE, A, -4 SYS @ $140.00/SYS for a total deduction of ($-560.00) Add 5 LFT to Line Item 100: CURB, CONCRETE, 5 LFT @ $19.00/LFT for a total addition of $95.00 Add 4 SYS to Line Item 114: SODDING, BURSERY AND TOPSOIL, 4 SYS @ $4.30/SYS for a total addition of $17.20 Subtract 6 LFT from Line Item 160: PIPE, TYPE 2 CIRCULAR 12 IN, -6 LFT @ $24.00/LFT for a total deduction of ($-144.00) Subtract 2 EA from Line Item 187: MANHOLE, C4, -2 EA @ $1,985.00/EA for a total deduction of ($-3,970.00) Add 1 EA to Line Item 191: MANHOLE, H4, 1 EA @ $3,375.00/EA for a total addition of $3,375.00 SPECIFICATIONS: NO CHANGE REQUIRED DRAWINGS: The following sheets have been revised and are issued as new sheets as a part of this Change Order: Sheet 2 —Revision Note No. 10 Added Sheets 68 — Revised Curb Ramp and Structure locations and callouts Sheets 68 — Revised Curb Ramp elevation details Sheet 231 — Revised Structure Data Notes END OF CHANGE ORDER NO. 7 Sheet 2 of 3 Project No. 116-001 Change Order No. 07 - 06/10/16 CITY OF SOUTH BEND PROJECT NAME: One -Way to Two -Way Street Conversion — Division B PROJECT NUMBER: 116-001 Division B: Item No. Description Quantity Unit Unit Price Total Amount 37 STRUCTURAL BACKFILL, TYPE 1 -2 CYS $21.60 ($43.20) 43 WIDENING WITH HMA, TYPE D -1 TON $110.00 ($ 220.00) 44 MILLING, ASPHALT, 1 Y IN 2 SYS $1.75 $3.50 87 CURB RAMP, CONCRETE, A -4 SYS $140.00 ($-560.00) 100 CURB, CONCRETE 5 LFT $19.00 $95.00 114 SODDING, NURSERY AND TOPSOIL 4 SYS $4.30 $17.20 160 PIPE, TYPE 2 CIRCULAR 121N -6 LFT $24.00 (-$144.00) 187 MANHOLE, C4 -2 EA $1,985.00 (-$3,970.00) 191 MANHOLE, H4 1 EA $3,375.00 $3,375.-- OWNER: City of South Bend Signature CONTRACTOR: Rieth-Riley Construction Signature 9-/5- /e Date �I Project No. 116-I�II��)01 Ii1 Iull', ��I Change Order No. 07 - 06/10/16 Change Order No. 08 One- Way to Two -Way Street Conversion Division B Project No. 116-001 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. Patrick K. Wooden, P.E. Professional Engineer No. 10504741 CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Street Conversion, Division B Project No. 116-001 SUBJECT: Landscaping Revisions ISSUE DATE: June 10, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Eliminate planters being installed at the southeast corner of Main & Colfax 2. Revise bike-ped split area north of Colfax & St.Joseph 3. Widen sidewalk to Stiver Park entry 4. Revised Two -Way cycle track centerline marking label The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRA T REQU REMENTS Bid/Proposal Form: Division B: Subtract 10 SYS from Line Item 18: SIDEWALK, CONCRETE, REMOVE, -10 SYS @ $4.75/SYS for a total deduction of ($-47.50) Subtract 6 SYS from Line Item 82: SIDEWALK, CONCRETE, 4", -6 SYS @ $34.00/SYS for a total deduction of ($-204.00) Add 3 SYS to Line Item 116: BRICK, DECORATIVE, 3 SYS @ $113.00/SYS for a total addition of $339.00 Add 2 EACH from Line Item 121: SHRUB, NO, 3 CONTAINER, 2 EACH @ $40.50/EACH for a total addition of $91.00 Subtract 36 EACH from Line Item 122: PERENNIAL, NO. 1 CONTAINER -36 EACH @ $14.50/EACH for a total deduction of ($-522.00) Subtract 21 EACH from Line Item 123: ORNAMENTAL GRASS, NO, 1 CONTAINER -21 EACH @ $18.50/EACH for a total deduction of ($-388.50) Subtract 23 EACH from Line Item 124: GROUNDCOVER, PLUG -23 EACH @ $8.00/EACH for a total deduction of ($-184.00) Add 2 EACH to Line Item 129: BENCH, 2 EA @ $900.00/EACH for a total addition of $1,800.00 I' �; illy bange Order No. 08 One- W4,y tp Two -Way Street Con Division B " 0roject No. 116-001 erston SPEC (FICATIONS: NO CHANGE REQUIRED DRAGS: The fol lowing sheets have been revised and are issued as new shee> *� Sheet 2 -Revision Note No. 10 Added Sheet 51 & 134 - A - Eliminate planters being install& Ly Main & Colfax Sheet 57 & 137 - A - Revise bike-ped split area north of Sheets 85, 116, and 137 - A - Widen Sidewalk to Stier Sheet 136 - A - Modified plan 1 & 2 Sheet 138 - A - Revised plant schedule Sheet 139 - Revised Two -Way Cycle Track centerline END OF CHANGE ORDER NO. 8 iz�* ,�, a part of this Change e southeast corner of Colfax & St.Joseph Parma Entry ��rk��9 /abel Project No. 116-001 Change Order No. 8 — 06/10/2016 CITY OF SOUTH BEND PROJECT NAME: One -Way to Two -Way Street Conversion — Division B PROJECT NUMBER: 116-001 Division B: z2 y2: 1865 Item No. Description Quantity Unit Unit Price Total Amount 18 SIDEWALK, CONCRETE, REMOVE -10 SYS $4.75 ($-47.50) 82 SIDEWALK, CONCRETE, 4" -6 SYS $34.00 ($-204.00) 116 BRICK, DECORATIVE 3 SYS $113.00 $339.00 121 SHRUB, NO. 3 CONTAINER 2 EACH $40.50 $91.00 122 PERENNIAL, NO. 1 CONTAINER -36 1 EACH $14.50 (-$522.00) 123 ORNAMENTAL GRASS, NOA CONTAINER -21 EACH $18.50 (-$388.50) 124 GROUNDCOVER, PLUG -23 EACH $8.00 (-$184.00) 129 BENCH 2 EACH $900 $1,800.00 OWNER: City of South Bend Signature Date CONTRACTOR: Rieth-Riley Construction /' c_ -1� Signature ?-r s -/ to Date Chan One- way to TWO -Way Order No• 09 WO -way Street Co Division g nversion OWNER: Project No. 116-001 ENGINEER: City of South Bend C- Ryan American Structurepoint, Inc. Professional Engin an, P.E., PTOE Engin CONTRACTOR: Rieth-Riley Conseer No. 11400171 truction PROJECT: South Send 1One-Way to Tw° WaY Street SUBJECT. Project No. Conversion Strain Poles B ATE; ISSUE p Revision JulY29, 2016 Is anhd Change Order to the Contract incorporated document shall as an Addendum suppieme The following to the Contract. nt, amend, and shall is a summary and become 1. Revise the traffic signal of a Part of, final su the revisions to the Poles. These chap PP' I of the intersections I stedract b Performed changes are detailed in Y this Chan standard per the attached r Revision 9 and below fro ge Order. drawings, evised standards Revision 10. m mast arms to strain pIntersection pecifications All work is to be oseph Street$ L and the attached revised oc ti aSa❑ n 2. 3. 4. 5. H Revise the Station traffic signal plans & South treet. This to retain signal Revise mast change Is detailed i final control at the i at the intersect- callouts Revision 10. intersection of ectint of °f several sheets to Michigan Street Revise pavement Michigan Street & So mimmize the Street from a markings and si out Street. need for mast two-wa 9ning at the inters arm relocations Add permitted/protec edtleftCOntrolled interse ection of Of the Lafayetteturn phasin ction a signal controlled Street &South Blvd & LaSalle qVe • g to the inters mtersection.no�hbound and southbo—ection. Amend intermediate co This work is documents mpletion detailed in approaches to account for dates and liquidated Revision 10. Joseph Street. Chan quidated dams changesin signal support t geS clauses in The followingtypes at several inte secctio s sections of the Contract Documents are revised as a result of the above changes: One- Change Order No. Way to Tavo_ 09 Way Street Conversion Division B �► DiNG Project No. 116-001 AND r pNTRACT n� �cCIN �Tc 1 B'd/Proposal Form Division B: Revise EWq Line Item @ $120.00/E NO' 21: "TRAFFIC ACH to 2>7 EACH SIGNAL EQUIPMENT Revise EW @ $120,00/EACHfor REMOVE" BASE'; from Lin EACH a TOtal Reduction °f ,fry °m 250 EACH Item No. 228: `SIGNPOST SQUA $3,9960,06 ✓ Reduction M 907 50. i $14.50/EACH to RE �'PE 1, 888 EACH REINFORCED ANCHOR Revise E @ '$14.50/EACH fora Total WA Line Item No. 23g: "TESCO CABINET W/R/NG, ETC. " T°tallncrease offs m 21 EAC W/SINGLE S 2_ 5 0 . @ $6, 250. 00/EACH to 22 E q C SERVICE FOND Revise H @ $6,250. NDAT/ON EWA Line Item No. 240: 00/EA CH fora $120. 00/EACH to 2g EACH @ STA $120.00/EACH aND HOLE COVERS" pV fro Revise EWq Line Item No. Total Red ERS" m 38 EACH $1250.00/EACH to 3 EACH 43. SIGNAL PO action of $1 080.00. @ @ $1,250.00/EAC PEDESTAL, 15FT' Revise EWA Line Item No. H for a Total Re frOm 7 EACH $1, 050.00/EAC 250: duction of $5, 000.000 H to 59 EACH HANDHOLE S/GNAL Revise EWq Line Item No. @ $1'050.00/EAC ryPE 1 from 71 H for a Total Reduction of @ @ $185.00/EACH to 37 251' `HANDHOLE SIG 12 600. I. , — Revise @ $185.00/EACH or , A Increase TO GRADE" 34 Revise EWq Line Item No. 257:from $58500/EACH S/G/�AL P of 555.00 EACH to 47EACH @ $58500/EA y oSTAL FO(/NDAT/ONA„ Revise EWq Line Item a Total Reduction of from 57EACH @ $880.00/EACH to 36 EACH 58. SIGNAL POLE P 5 850.00 ✓ @ $880.00/EACH fora Total Reduction of Revise EWq Line Item 'from 42 EACH $5.20/LFT NO 261: -CONDUIT PV $5.280. ✓ @ to 14,252LFT ND C 2/N, S @ $520/LFT fora TOta/ CHEDULE 80,, fro Revise EWq Line Item Reduction of FOUNDATION, TYPE NO. 272: `SIGNAL$3.702.40. m ' 964 LFT @ for a Total Reduction oA ' from 46 EACH CANTILEVER 70.00//EACH to RE $24, 030. 0, ,/ DRILLED SHAFT Revise EWq Line Item No. 274; LFT @ $2 670• 001EACH 37EACH@ $1240.00/EgC SIGNAL CANT/LEV $12,400.00 % Hto27 ERST LFT@ $1,24000/EACHfora TE tRELOCAT Revise H for a Total Reductio of from EWA Line Item No. 275: `PAINTIFF/C $3, 870.00/EACH to 21 EACH @ P IN TING $3,870. N /EACH for SIGNALS'; from 19 EACH @ a Total Increase of IL740.00✓ Change Order No. 09 One- Way to Two -Way Street Conversion Division B Project No. 116-001 Revise EWA Line Item No. 279: "TRAFFIC SIGNAL HEAD, 5-SECTION, 12' RED, AMBER GREE, AMBER ARROW, GREENARROW; from 23 EACH @ $1,450.00/EACH to 24 LFT @ $1,450.00/EACH fora Total Increase of$1,450.00. ✓ Revise EWA Line Item No. 288: `SIGNAL CABLE, CONTROL, COPPER 5C/14",, from 28,703 LFT @ $1.8OLFT to 31,365 LFT @ $1.80/LFT for a Total Increase of $4,791.60. Revise EWA Line Item No. 289: `SIGNAL CABLE, CONTROL, COPPER 7C/14",, froyn 9,204 LFT @ $2.00LFT to 7,495 LFT @ $2.00/LFT for a Total Reduction of $3,418.00. ✓ Revise EWA Line Item No 349: "TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, 24IN" from 3 184 LFT @ $5.00/LFT to 3,280 LFT @ $5.00/LFT for a Total Increase of $480.00. ✓ Add EWA Line Item No. 553: "SIGNAL STRAIN POLE, STEEL, 30FT7, 8 EACH @ $9,374.30/EACH for a Total Increase of $74,994.40. Add EWA Line Item No. 554: "SIGNAL STRAIN POLE, STEEL, 36FT , 6 EACH @ $10, 964.20/EACH for a Total Increase of $65,785.20. Add EWA Line Item No. 555: "SIGNAL STRAIN POLE, STEEL, INSTALL", 2 EACH @ $1, 619.80/EACH for a Total Increase of $3,239.60. Add EWA Line Item No. 556: "SPAN, CATENARY & TETHER", 14 EACH @ $4, 368.00/EACH for a Total Increase of $61,152.00. Add EWA Line Item No. 557: `DISCONNECT HANGER", 14 EACH @ $886.60/EACH for a Total Increase of $12,412.40. Add EWA Line Item No. 558: "SIGNAL POLE FOUNDATION, 36INX 1441N" 16 EACH @ $4, 921.80/EACH for a Total Increase of $78,748.80. Add EWA Line Item No. 559: "Luminaire Arm, 30ft ; 1 EACH @ $2, 646.80/EACH for a Total Increase of $2, 646.80, Add EWA Line Item No. 560: "Luminaire Arm, 15ft" 7 EACH @ $1,935.70/EACH for a Total Increase of $13,549.90. Total Change of $256,199.80 SPECIFICATIONS: The following special provisions have been amended or added to the Contract Documents and are issued as a part of this Change Order: XIV PROSECUTION AND PROGRESS (REVISED) A. Prevailing Specifications: 2016, INDOT Standard Specifications Sec. 108 B. Additions: Change Order No. 09 One- Way to Two -Way Street Conversion Division B Project No. 116-001 The project, both Division A and Division B, will have a completion date of June 1, 2017. The contract time will start when the Notice to Proceed is delivered and signed. 2. The project will have intermediate completion dates as listed in the table below for roads open to bi-directional traffic and substantial completion of all traffic control devices complete and in place. This includes all travel and parking lane asphalt and concrete work, structures, curb, lighting, and permanent pavement markings complete and in place. Roadway Intermediate Completion Date Intersection of Main Street and Chippewa September 7, 2016 Avenue Main Street between Chippewa Avenue and September 7, 2016 Sample Street and between LaSalle Street and Marion Street Intersection of Michigan Street and Chippewa September 7, 2016 Avenue Michigan Street between Chippewa Avenue September 7, 2016 and Sample Street and between LaSalle Street and Angela Blvd. Main Street between Sample Street and October 15, 2016 LaSalle Avenue St Joseph/Michigan Street between Sample _November 15, 2016 Street and LaSalle Avenue a. A minimum of one travel lane in each direction on each corridor street shall be open to traffic on or before the specified date. Once bi-directional traffic is established on each corridor street, bi-directional traffic shall be maintained on each corridor street for the duration of the project. b. A minimum of one travel lane shall be open to traffic during construction except whereas noted in the full closure construction period. c. Two (2) northbound travel lanes must be open for the duration of Saturdays on which there is a home Notre Dame football game. This can be achieved either through two (2) northbound travel lanes on Michigan/St. Joseph or one (1) northbound travel lane on both Michigan/St. Joseph and Main St. after Main St. has been converted to bi- directional traffic. The dates of concern are provided below. (REVISED) (i) September loth, 2016 (ii) September 171h, 2016 (iii) September 24th, 2016 (iv) October 151h, 2016 (v) October 29th, 2016 Change Order No. 09 One- Way to Two -Way Street Conversion Division B Project No. 116-001 d. The Contractor shall coordinate maintenance of traffic with the City for any sidewalk, streetscape, trees, pavers, and/or landscaping activities following the intermediate completion date for any subsequent work. 3. The table below lists the dates by which the identified roads shall be available to begin full closure and the intermediate completion dates for full road closure. Roadwav Starting Date for Full Intermediate Completion Date for Closure Full Road Closure Intersection of Michigan Street and June 6. 2016 August 5, 2016 Chippewa Avenue Intersection of Michigan Street and May 17,201 September 7. 2016 Bartlett Street Intersection of Michigan Street and Mav 17, 2016 September 7, 2016 Marion Street a. The identified roads shall not be closed before the starting date and shall maintain a minimum of two travel lanes prior to such date. b. The work specified shall be arranged and prosecuted such that these roads are open to traffic on or before the specified intermediate completion date. 4. The City, Engineer, and Contractor will hold a pre -construction meeting following award of the contract. The date of the Notice to Proceed will be agreed upon at that meeting. 5. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. CLXIX. PAINTING OF TRAFFIC SIGNAL EQUIPMENT (REVISED) A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 805. B. Additions: 1. All existing and proposed pedestrian crossing poles, pedestrian pedestals, mast arms, mast arm poles, strain poles, traffic signal heads, and pedestrian signal indications identified herein that are to remain shall be painted black with a Sherwin Williams two step paint process. a. The two application painting procedure shall include "Macropoxy 646" for the first application and "Acrolon 218HS" for the second application. b. All work shall be in accordance with the recommendations and equipment as per Sherwin Williams guidelines. c. The Contractor shall provide an authorized Sherwin Williams Representative on site to ensure proper paint mixing, application, weather conditions, etc. Change Order No. 09 One- Way to Two -Way Street Conversion Division B Project No. 116-001 d. The Contractor shall use a wire brush or other approved equipment to remove any rust or loose coatings prior to painting. 2. Painting shall be performed on the above mentioned traffic signal equipment at the following signalized intersections: a. Division A (i) Main Street & Chippewa Avenue (ii) Main Street & Ewing Avenue (iii) Michigan Street & Donmoyer Avenue (iv) Michigan Street & Ewing Avenue Division B (i) Main Street & Indiana Avenue (ii) Main Street & Bronson Street (iii) Main Street & South Street (iv) Main Street & Monroe Street (v) Main Street & Western Avenue (vi) Main Street & Wayne Street (vii) Main Street & Jefferson Boulevard (viii) Main Street & Washington Street (ix) Main Street & Colfax Avenue (x) Michigan Street & Indiana Avenue (xi) Michigan Street & Bronson Street (xii) Michigan Street & Monroe Street (xiii) St Joseph Street & Western Avenue (xiv) St Joseph Street & Wayne Street (xv) St Joseph Street & Jefferson Boulevard (xvi) St Joseph Street & Washington Street (xvii) St Joseph Street & Colfax Avenue (xviii) St Joseph Street & LaSalle Avenue (xix) Michigan Street & South Street (NEW) (xx) Michigan Street & Central Fire Station (NEK9 3. Painting of pedestrian crossing poles, pedestrian pedestals, mast arms, mast arm poles, traffic signal heads and pedestrian signal indications will be paid for at the contract unit price for each intersection, complete and in place. The cost of all labor, material, and equipment necessary to complete the Work shall be included in the contract unit price for PAINTING TRAFFIC SIGNALS (Each) measured on a per intersection basis. CL)OO(ll. STRAIN POLES (NEK9 A. Prevailing Specification: 2016, INDOT Standard Specifications Sections 805 and 922 B. Additions: 1. All new strain poles shall be per current INDOT Standard Drawings and shall have a painted black finish per Specification CLXIX. Strain pole foundations shall be provided per the current INDOT Standard Drawings. 2. New strain poles shall provide 15ft luminaire arm as indicated in the plans for purposes of supporting traffic detection cameras. Said arm shall be per current INDOT Standard Drawings and shall be finished to match the strain pole. Change Order No. 09 One- Way to Two -Way Street Conversion Division B Project No. 116-001 DRAWINGS: The following sheets have been revised or issued as new sheets. Revision 9 Sheet 2 — Revision Note No 9 Added Sheet 169-A Replaced Sheet, Replaced Mast Arms with Strain Poles Sheet 170-A Replaced Sheet, Replaced Mast Arms with Strain Poles Sheet 177-1-A Replaced Sheet, Replaced Mast Arms with Strain Poles Revision 10 Sheet 2 —Revision Note No 10 Added Sheet 154 Revised Mast Arm Callout Sheet 163-A Replaced Sheet, Traffic Signal to Remain & Utilize Mast Arms Sheet 165 Revised Mast Arm Callout Sheet 166 Revised Mast Arm Callout Sheet 167-A Replaced Sheet, Replaced Mast Arms with Strain Poles Sheet 168-A Replaced Sheet, Replaced Mast Arms with Strain Poles Sheet 175-A Added NBLT & SBLT 5-Section Heads and Phasing Sheet 201 Removed Stop Signs and Added Stop Bars Sheet 208 Removed Stop Signs and Added Stop Bars Sheet 223 Revised Sign and Totals The following INDOT Standard Drawings are applicable to strain poles and are attached to this change order. E 805-SGSC01 Guy Alignment and Anchor Bolt Orientation (rev. 09/03/13, editorial only) E 805-SGSCO2 Signal Strain Pole, Steel, Foundation Details (rev. 09/03/13) E 805-SGSC03 Span and Catenary Attachment (rev. 09/03/13) E 805-SGSC04 Span, Catenary & Tether Detail (rev. 09/01/15) E 805-SGSP-01 30 ft & 36 ft Signal Steel Strain Poles (eff. 09/01/05) E 805-SGSP-02 Top Cover & Metal Skirt of Signal Steel Strain Pole (rev. 11/15199) E 805-SGSP-03 Pole Band for Signal Steel Strain Pole (rev. 11/15/99) E 805-SGSP-04 Base Plate for Signal Steel Strain Pole (rev. 09/03/13) E 805-SGSP-05 Anchor Bolt Detail Signal Steel Strain Poles (eff. 03/01/04) END OF CHANGE ORDER NO. 9 OWNER: City of South Bend Signature Date CONTRACTOR: Rieth-Riley Construction /_4WA - Signature Date Change Order No. 16 O 1e- ay to Two -Way Street Conversion Division B Project No. 116-001 OWNER: City of South Bend ENGINEER: American Structurepoint, Inc. Patrick K. Wooden, P.E. Professional Engineer No. 10504741 CONTRACTOR: Rieth-Riley Construction PROJECT: South Bend One -Way to Two -Way Conversion Division B Project No. 116-001 SUBJECT: EWA 012 Grooving for Pavement Markings ISSUE DATE: July 10, 2016 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Add pay item 'GROOVING FOR PAVEMENT MARKINGS' per INDOT Design Memo 15-19 requested on Division B of Contract 116-001. Work to be performed according to INDOT RSP 808-T-210. This results in a $49,775.42 cost change for Division B. The following sections of the Contract Documents are revised as a result of the above changes: IfIDDDIING AND CONTRACT REQUIREMFuTS 1. Bid/Proposal Form: Division B: Add 29,675 LFT to Line Item 464: GROOVING FOR PAVEMENT MARKINGS, 29,850 LFT @ $1.39/LFT for a total addition of $41,491.5 Add 1 ea. to line Item 465: ADDITIONAL MOBILIZATION, (for grooving) 1 LSM @ $8,283.92 SPECIFICATIONS:__ NO CHANGE REQUIRED Sheet 1 of 3 DRAWINGS: Change Order No. 16 One- Way to Two -Way Street Conversion Division B Project No. 116-001 NO CHANGE REQUIRED END OF CHANGE ORDER NO. 16 Sheet 2 of 3 Project No. 116-001 Change Order No. 16 — 7/10/16 L CITY OF SOUTH BEND = , s 2 a2 PROJECT NAME: One -Way to Two -Way Street Conversion — Division B PROJECT NUMBER: 116-001 Division A: Item No. Description Quantity Unit Unit Price Total Amount 464 GROOVING FOR PAVEMENT MARKINGS 29,850 LFT $1.39 $41,491.5 465 ADDITIONAL MOBILIZATION ( for grooving) 1 LSM $8,283.9 $8,283.92 OWNER: City of South Bend CONTRACTOR: Rieth-Riley Construction Signature Date Signature y is —/A Date $49,775.42 Sheet 3 of 3 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 08/15/16 Name Toy Villa Department Engineering BPW Date 08/23/16 Phone Extension 5920 L Required Prior to Submittal to Board Legal ® Attorney Name Michael Schmidt Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑ Contract ❑ Proposal ❑Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ® Change Order No. 5 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control ❑ Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Required Information Reith Riley Construction Co., Inc. Yes ®No ❑ If Yes, Approved by Purchasing ❑ MBE ❑ WBE ❑ No ❑ Yes Name of Company South Bend One Way to Two Way Conversion — Division B 116-001 2015 TIF Approval of Change Order #5 ❑ Required Contractor's Certification Form Attached (Non - Collusion Non -Discrimination Non -Debarment E-Verify, Iran etc.) Required For Change Orders Only Amount of ® Increase $ 305,412.72 ❑ Decrease $ Previous Amount $ 16,286,366.15 Current Percent of Change: 1.88% New Amount $ 16,591,778.87 Total Percent of Change: 2.85% Dispersal After Approval Copy Original ® ❑ Michael Divita ® ❑ Toy Villa ® ❑ Beth Leonard, Judy Love