Loading...
HomeMy WebLinkAboutChange Order No. 2 - East Bank Sewer Separation Phase 5 Div B - Proj No 114-062B - Walsh&Kelly1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1 830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS August 23, 2016 Mr. Jason Minne Walsh & Kelly, Inc. 24358 State Road 23 South Bend, IN 46614 PHONE 574/235-9251 FAx 574/235-9171 RE: Change Order No. 2 — East Bank Sewer Separation, Phase 5, Division B — Project No. 114-062B Dear Mr. Minne: The Board of Public Works, at its meeting held on August 23, 2016, approved the above referenced Change Order for an increase of $118,071.00 and the addition of thirty-five (35) days, bringing the current contract amount to $5,253,800.66 and the completion date to November 16, 2016. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure c: Aaron Kobb, Community Investment Roger Nawrot, Engineering Toy Villa, Engineering Beth Leonard, Community Investment Judy Love, Community Investment GARY A. GILOT DAVID P. RELOs ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: The oriqinal contract sum 6/22/2016 114-062B East Bank Sewer Separation - Phase 5 (Division B) 1 /26/2016 180 PCR #4-Headwall Redesign PCR #5-Water Main Repairs PCR #6-Retaining Wall PCR #7-Water Main Add Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR C�actor`Signature 7s>•? fflrnn%vp��iv�cw�ev� Printed Name and Tim Walsh Kelly Inc. Company Name 24358 State Road 23 Address South Bend, IN 46614 City, State, Zip $ 5,080,808.05 $ 54,921.61 $ 5,135,729.66 Increased Decreased $ 118,071.00 (TIF: + $107,071.00) (Sewer Bond: + $11,000.00) $ 5,253,800.66 2.30 % 3.40 % 11/16/2016 20 days 35 days 5/11/2017 RECOMMENDED FOR APPROVAL CO S CTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date9.. Gary A. Gilot, President Therese J. Dofau, Member James A. Mueller, Member Change Order No. 2 East Bank Sewer Separation — Phase 5 114-062 OWNER: City of South Bend ENGINEER: CHA Consulting, Inc. Jay Gibson, P.E. 60920005 Professional Engineer No. PE PROJECT: East Bank Sewer Separation — Phase 5 City Project No. 114-062 SUBJECT: Clarifications and Additions to Construction Documents TO: Contractor ISSUE DATE: July 19, 2016 This Change Order to the Plans and Specifications shall supplement, amend, and become part of these documents. All construction contracts shall incorporate the items addressed in this Change Order. Only the items contained herein are altered. The remainder of the Original Plans and Specifications remain valid in their entirety. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Extend the 12-in water main at the intersection of Northside Boulevard and Notre Dame Avenue to connect at the intersection of Northside Boulevard and St Peter Street. New tee and isolation valves will be included at each intersection. 2. Replace the existing 6-in water main on Parry Street from the Marine Corps League approach to the south and the intersection at the Western Avenue to the north. 3. Replace 3 fire hydrants on Parry Street. 4. Lengthen the approaches to the tabletop intersection at Northside Boulevard and S Notre Dame Avenue from 6-ft to 8-ft. The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS: No Change SPECIAL PROVISIONS: No Change 1 Change Order No. 2 East Bank Sewer Separation - Phase 5 114-062 PLANS: 1. Replace Sheets 21, 24, 33, 34 and 35 with the attached revised sheets. 2. Replace Sheets 31, 32, 37 and 45 with the attached revised sheets. BID FORM: 1. Modify Line Item No. 11: 'PIPE, REMOVE" 2,823 LFT at $6.00 unit price for a Total Amount of $16, 938.00 2. Modify Line Item No. 109:"FIREHYDRANT, REMOVE AND SALVAGE" 12EAat$350.00unit price for a Total Amount of $4,200.00 3. Modify Line Item No. 110: "FIRE HYDRANT ASSEMBLY (INCLUDES 6 IN. GATE VALVE)" 12 EA at $4000.00 unit price far a Total Amount of $48,000.00 4. Modify Line Item No. 111: 90 DEGREE BEND, 121N., DUCTILE IRON" 3 EA at $1,350.00 unit price for a Total Amount of $4, 050.00 5. Modify Line Item No. 113: 90 DEGREE BEND, 6 IN., DUCTILE IRON" 4 EA at $560.00 unit price for a Total Amount of $2,240.00 6. Modify Line Item No. 115: 22.5 DEGREE BEND, SIN., DUCTILE IRON" 2 EA at$950.00 unit price for a Total Amount of $1,900.00 7. Add Line Item No. 11513: 22.5 DEGREEBEND, 121N., DUCTILEIRON", 2 EA 8. Add Line Item No. 115C: '11.25 DEGREE BEND, 121N., DUCTILE IRON" 2 EA 9. Add Line Item No. 117B: 'TEE, 12 IN. XSIN., DUCTILE IRON" 3 EA 10. Add Line Item No. 117C: "TEE, 6IN. X 6IN., DUCTILE IRON" 4 EA 11. Modify Line Item No. 122: "GATE VALVE, 8IN., DUCTILE IRON (WITH VALVE BOX)" 12 EAat$1,700.00 unit price fora Total Amount of $20,400.00 12. Add Line Item No. 1236: "GATEVALVE, 121N., DUCTILE IRON (WITH VALVEBOX)" 1 EA 13. Modify Line Item No. 124: "121N. XBIN. TAPPING SLEEVE AND 8IN. VALVE(WITHVALVEBOX)'; 1 EA at $6,500.00 unit price for a Total Amount of $6,500.00 14. Modify Line Item No. 12513: "61N. X 61N. TAPPING SLEEVE AND 6IN. VALVE (WITH VALVE BOX)" SEA at $3,600.00 unit price for a Total Amount of $32,400.00 15. Modify Line Item No. 126: "12 IN. X 12 IN. TAPPING SLEEVE AND 12 IN. VALVE (WITH VALVE BOX)" 1 EA at $6,000.00 unit price for a Total Amount of $18,000.00 16. Add Line Item No. 12613: "12 IN. X 61N. TAPPING SLEEVE AND 61N. VALVE (WITH VALVE BOX)" 1 EA 17. Modify Line Item No. 127: "LINESTOP, 6 IN.' 13 EA at $4,700.00 unit price for a Total Amount of $61,100.00 18. Modify Line Item No. 129: "LINESTOP, 12 IN." 5 EA at $6,500.00 unit price for a Total Amount of $32,500.00 19. Modify Line Item No. 127: "WATER MAIN, 6IN., DUCTILE IRON (WITH POLYETHYLENE PIPE WRAP)", 1085 LFT at $40.00 unit price fora Total Amount of $43,400.00 20. Modify Line Item No. 127: "WATER MAIN, 12 IN, DUCTILE IRON (WITH POLYETHYLENE PIPE WRAP)", 906 LFT at $56.00 unit price for a Total Amount of $50,736.00 2 Change Order No. 2 East Bank Sewer Separation — Phase 5 114-062 ATTACHMENTS: • City of South Bend Contractor's Bid Form • Revised Plans Sheets 21, 24, 33, 34 and 35 (5 pages) • Revised Plans Sheets 31, 32, 37 and 45 (2 pages) END OF CHANGE ORDER NO. 2 Change Order No. 3 East Bank Sewer Separation — Phase 5 114-062 OWNER: City of South Bend ENGINEER: CHA Consulting, Inc. Jay Gibson, P. E. 60920005 Professional Engineer No. PE PROJECT: East Bank Sewer Separation — Phase 5 City Project No. 114-062 SUBJECT: Clarifications and Additions to Construction Documents TO: Contractor ISSUE DATE: July 22, 2016 This Change Order to the Plans and Specifications shall supplement, amend, and become part of these documents. All construction contracts shall incorporate the items addressed in this Change Order. Only the items contained herein are altered. The remainder of the Original Plans and Specifications remain valid in their entirety. The following is a summary and description of the revisions to the Contract by this Change Order: 1. Install approximately 320-sft of additional modular block wall between the parking lot and sidewalk south of E Wayne Street between S St Louis Boulevard and S St Peter Street. The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS: No Change SPECIAL PROVISIONS: No Change PLANS 1. Replace Sheets 50, 51 and 77A with the attached revised sheets. BID FORM Modify Line Item No. 133: "MODULAR BLOCK WALL" 906 SFT at$55.00 unit price fora Total Amount of $31,350.00 1 Change Order No. 3 East Bank Sewer Separation — Phase 5 114-062 ATTACHMENTS • City of South Bend Contractor's Bid for Public Works • Revised Plans Sheets 50, 51 and 77A (3 pages) END OF CHANGE ORDER NO. 3 BID/PROPOSAL CITY OF SOUTH BEND Project Name EAST BANK SEWER SEPARATION, PHASE 5 Project No. 114.062 For Bids Due AUGUST 25, 2015 DIVISION A Item No. Descri tion P City Unit Unit Price Total Amount 1 CONSTRUCTION ENGINEERING 1 LS $8,500.00 $8,500.00 MOBILIZATION AND 2 DEMOBILIZATION 1 LS $6,500.00 $6,500.00 3 CLEARING RIGHT OF WAY 1 LS $6,500.00 $6,500.00 TREE REMOVAL, 24 IN. AND 4 SMALLER 6 EA $650.00 $3,900.00 5 HYDROMULCH 1,020 SYS $2.00 $2,040.00 6 PLANT, WHITE PINE, 72 IN. TO 96 6 EA $485.00 $2,910.00 TEMPORARY EROSION AND 7 SEDIMENT CONTROL 1 LS $2,500.00 $2,500.00 8 PIPE, TYPE 2, CIRCULAR, 12 IN. 18 LFT $50.00 $900.00 9 TEMPORARY PIPE CONNECTION, 18 IN. 27 LFT $150.00 $4,050.00 10 PIPE, TYPE 2, CIRCULAR, 36 IN. 324 LFT $60.00 $19,440.00 11 PIPE, TYPE 2, CIRCULAR, 48 IN. 10 LFT $135.00 $1,350.00 12 48 IN. PIPE PLUG, TEMPORARY 1 LS $1,000.00 $1,000.00 13 MANHOLE, K4, MODIFIED 1 EA $6,000.00 $6,000.00 14 MANHOLE, L4, MODIFIED 1 EA $12,000.00 $12,000.00 MANHOLE, L4, MODIFIED WITH 15 BAFFLE AND 3 FT. SUMP 1 EA $13,000.00 $13,000.00 16 MAINTAINING TRAFFIC 1 LS $4,500.00 $4,500.00 SIGN AND POST, REMOVE AND 17 RESET 6 EA $100.00 $600.00 TOTAL BID, DIVISION A (SUM ITEMS 1.17) $95,690.00 Bidder's Name Version 5/25/2016 Contractor's Bid for Public Works - 7 CHANGE ORDER NO. 1 DIVISION B Item No. Description Qty Unit Unit Price Total Amount 1 CONSTRUCTION ENGINEERING 1 LS $65,000.00 $65,000.00 2 CPM SCHEDULE 1 LS $500.00 $500.00 3 CPM SCHEDULE, MONTHLY UPDATE 12 EA $100.00 $1,200.00 4 MOBILIZATION AND DEMOBILIZATION 1 LS $100,000.00 $100,000.00 5 CLEARING RIGHT OF WAY 1 LS $55,000.00 $55,000.00 6 TREE REMOVAL, 24 IN. AND SMALLER 73 EA $400.00 $29,200.00 7 TREE REMOVAL, GREATER THAN 241N. 28 EA $500.00 $14,000.00 8 CURB, CONCRETE, REMOVE 12,000 LFT $2.00 $24,000.00 9 CONCRETE, REMOVE 7,129 SYS $4.00 $28,516.00 10 PAVEMENT REMOVAL 16,513 SYS $6.00 $99,078.00 11 PIPE, REMOVE 2,823 LFT $6.00 $16,938.00 12 STRUCTURE, REMOVE 64 EA $200.00 $12,800.00 13 EXISTING TIMBER RETAINING WALL, REMOVE 205 LFT $11.00 $2,255.00 14 COMMON EXCAVATION 18,515 CYS $17.00 $314,765.00 15 B-BORROW, UNDISTRIBUTED 100 CYS $7.50 $750.00 16 TEMPORARY EROSION AND SEDIMENT CONTROL 1 LS $15,000.00 $15,000.00 17 SILT FENCE 1,600 LFT $1.75 $2,800.00 18 EROSION CONTROL BLANKET 260 SYS $3.84 $998.40 19 NO.2 STONE 150 TON $20.00 $3,000.00 20 FLOWABLE BACKFILL, NOW REMOVABLE 12 CYS $120.00 $1,440.00 21 COMPACTED AGGREGATE, NO. 53, BASE 6,231 TON $17.00 $105,927.00 22 CRUSHED CONCRETE 126 TON $27.00 $3,402.00 23 MILLING, ASPHALT, 2.51N 1,144 SYS $4.00 $4,576.00 24 HMA SURFACE, TYPE B 2,697 TON $67.00 $180,699.00 25 HMA INTERMEDIATE, TYPE B 3,726 TON $47.00 $175,122.00 26 HMA BASE, TYPE B 5,962 TON $44.00 $262,328.00 27 HMA WEDGE & LEVEL, TYPE B 61 TON $75.00 $4,675.00 28 HMA FOR PATCHING 62 TONM $4,650.00 29 ASPHALT FOR TACK COAT 14 TON $210.00 30 CURB RAMP, CONCRETE, G 275 SYS $34,375.00 31 CURB RAMP, CONCRETE, H 13 SYS $1,765.00 32 SIDEWALK, CONCRETE, 4 IN. 6,956 SYS $208,680.00 33 CURB, CONCRETE 13,996 LFT $209,940.00 Bidder's Name Version 5/25/2016 Contractor's Bid for Public Works - 8 CHANGE ORDER NO. 1 34 CURB, MODIFIED, CONCRETE 423 LFT $24.00 $10,152.00 35 PCCP FOR APPROACHES, 6 IN. 680 SYS $45.00 $30,600.00 36 PCCP FOR APPROACHES, 8 IN. 1,266 SYS $52.00 $65,832.00 37 PCCP PATCHING, 12 IN. 79 SYS $110.00 $8,690.00 38 PCCP, STAMPED, COLORED, 11 IN. 45 SYS $225.00 $10,125.00 39 CONCRETE, HEADER, 6 IN. 162 LFT $30.00 $4,860.00 40 PCCP, COLORED, 11 IN, 400 SYS $85.00 $34,000.00 41 VARIABLE DEPTH PCCP, COLORED, 8 IN. TO 11 IN. 56 SYS $85.00 $4,760.00 42 SODDING 12,659 SYS $4.52 $57,218.68 43 HYDROMULCH 5,813 SYS $0.86 $4,999.18 44 PLANT, DECIDUOUS TREE, 3 IN. 206 EA $545.00 $112,270.00 45 of n eir W o u rc n e rn n rn 06 €A DELETED DELETED 46 PIPE TVOC o GIRG n no 19 IN. LFT DELETED DELETED 47 PIPE, TYPE 2, CIRCULAR, 12 IN. 2,423 LFT $22.00 $53,306.00 48 PIPE, TYPE 2, CIRCULAR, 12 IN., WATERGRADE 392 LFT $25.00 $9,800.00 49 PIPE, TYPE 2, CIRCULAR, 15 IN. 270 LFT $23.00 $6,210.00 50 PIPE, TYPE 2, CIRCULAR, 18 IN. 365 LFT $27.00 $9,855.00 51 PIPE, TYPE 2, CIRCULAR, 18 IN., WATERGRADE 84 LFT $45.00 $3,780.00 52 TEMPORARY PIPE CONNECTION, 18 IN. 14 LFT $125.00 $1,750.00 53 PIPE, TYPE 2, CIRCULAR, 24 IN. 918 LFT $37.00 $33,966.00 54 PIPE, TYPE 2, CIRCULAR, 30 IN. 1,516 LFT $50.00 $75,800.00 55 PIPE, TYPE 2, CIRCULAR, 30 IN., WATERGRADE 428 LFT $85.00 $36,380.00 56 PIPE, TYPE 2, CIRCULAR, 36 IN. 870 LFT $55.00 $47,850.00 57 PIPE, TYPE 2, CIRCULAR, 36 IN., WATERGRADE 425 LFT $115.00 $48,875.00 58 PIPE, TYPE 2, CIRCULAR, 48 IN. 66 LFT $80.00 $5,280.00 59 ADJUST CASTING TO GRADE 23 LFT $350.00 $8,050.00 60 ADJUST VALVE BOX TO GRADE 7 EA $35.00 $245.00 61 PIPE PLUG, CONCRETE 58 EA $300.00 $17,400.00 62 CATCH BASIN C-15 4 EA $3,200.00 $12,800.00 63 INLET B-15 33 EA $3,200.00 $105,600.00 64 INLET C-15 2 EA $3,100.00 $6,200.00 65 CATCH BASIN C-15, MODIFIED 1 EA $3,300.00 $3,300.00 66 INLET, B15, MODIFIED 1 EA $3,000.00 $3,000.00 67 INLET, C15, MODIFIED 3 EA $3,300.00 $9,900.00 68 MANHOLE, C2, MODIFIED 1 EA $4,600.00 $4,600.00 69 MANHOLE, C4, MODIFIED 3 EA $2,800.00 $8,400.00 70 MANHOLE, J2, MODIFIED 1 EA $5,000.00 $5,000.00 Bidder's Name Version 5/25/2016 Contractor's Bid for Public Works - 9 CHANGE ORDER NO. 1 71 MANHOLE, J4, MODIFIED 2 EA $4,000.00 $8,000.00 72 MANHOLE, J15, MODIFIED 25 EA $5,100.00 $127,500.00 73 MANHOLE, K2, MODIFIED 1 EA $6,000.00 $6,000.00 74 MANHOLE, K4, MODIFIED 4 EA $5,200.00 $20,800.00 75 MANHOLE, K15, MODIFIED 4 EA $6,600.00 $26,400.00 76 MANHOLE, L4, MODIFIED 1 EA $11,000.00 $11,000.00 MANHOLE, K4, MODIFIED WITH 77 BAFFLE AND 3 FT. SUMP 1 EA $5, 500.00 $5,500.00 7-8 MANHOLE, i n MOD o cn WITH RAvo F AND o yr SUMP FA DELETED DELETED 79 STRUCTURE RECONSTRUCTION 3 EA $5,000.00 $15,000.00 80 OUTFALL, STRUCTURE NO. 1, 30 IN, 1 EA $76,000.00 $76,000.00 81 OUTFALL, STRUCTURE NO. 2,48 IN. 1 EA $82,000.00 $82,000.00 82 RIP -RAP, REVETMENT 39 TON $125.00 $4,875.00 $.3 RQGK WALL,HAND n ORTA RFD &T DELETED DELETED 84 GEOTEXTILE FABRIC 59 SYS $4.00 $236.00 85 SANITARY MANHOLE, REMOVE 14 EA $205.00 $2,870.00 SANITARY SEWER, 8 IN. PVC SDR- 86 35 2,380 LFT $23.00 $54,740.00 SANITARY SEWER, 10 IN. PVC SDR- 87 35 290 LFT - $24.99 $7,247.10 SANITARY SEWER, 12 IN. PVC SDR- 88 35 298 LFT $26.00 $7,748.00 SEWER, 15 IN. PVC SDR- 89 35SANITARY 8 LFT $100.00 $800.00 SANITARY SEWER, 18 IN. PVC SDR- 90 35 32 LFT $85.00 $2,720.00 SANITARY SEWER LATERAL, 6 IN, 91 NEW CONNECTION 1571 LFT $28.00 $43,988.00 92 ennnrn ov conivo i nrooni c IN, o TAIR ooi ACEM&IT LET DELETED DELETED CIPP LINING, 10 IN., LESS THAN 10 93 FT. DEEP 647 LFT $33.09 $21,409.23 CIPP LINING, 12 IN., LESS THAN 10 94 FT. DEEP 457 LFT $49.38 $22,566.66 CIPP LINING, 15 IN., LESS THAN 10 95 FT.DEEP 243 LFT $57.23 $13,906.89 CIPP LINING, 12 IN., 10 FT. TO 15 96 FT. DEEP 1,683 LFT $54.25 $91,302.75 CIPP LINING, 15 IN., 10 FT. TO 15 97 FT. DEEP 460 LFT $57.35 $26,381.00 CIPP LINING, 18 IN., 10 FT. TO 15 98 FT, DEEP 1,382 LFT $62.45 $86,305.90 Bidder's Name Version 5/25/2016 Contractor's Bid for Public Works - 10 CHANGE ORDER NO. 1 SEWER, LATERAL 99 REINSTATEMENT WITH CIPP, 6 IN. g4 EA $85.00 $7,140.00 SEWER COUPLING, 10 100 SANITARY 2 EA $650.00 $1,300.00 SANITARY SEWER COUPLING, 12 101 IN. 3 EA $750.00 $2,250.00 S`ANITARYSEWERCOUPLING,15 102 2 EA $775.00 $1,550.00 SEWER COUPLING, 18 103 SANITARY 1 EA $825.00 $825.00 104 SANITARYMANHOLE 14 EA $3,400.00 $47,600.00 105 SANITARY DROP MANHOLE 2 EA $4,000.00 $8,000.00 106 TRANSITION COUPLING 40 EA $200.00 $8,000.00 WATER SERVICE, 1 IN, TYPE K 107 COPPER 3,862 LFT $32.00 $123,584.00 WATER SERVICE, 2 IN, TYPE K 108 COPPER 296 LFT $47.00 $13,912.00 FIRE HYDRANT, REMOVE AND 109 SALVAGE 12 EA $350.00 $4,200.00 FIRE HYDRANT ASSEMBLY 110 (INCLUDES 6 IN. GATE VALVE) 12 EA $4,000.00 $48,000.00 90 DEGREE BEND, 12 IN., DUCTILE 111 IRON 3 EA $1,350.00 $4,050.00 90 DEGREE BEND, 8 IN., DUCTILE 112 IRON 11 EA $530.00 $5,830.00 90 DEGREE BEND, 6 IN., DUCTILE 113 IRON EA $560.00 $2,240.00 45 DEGREE BEND, 8 IN., DUCTILE 114 IRON 81 EA $725.00 $58,725.00 22.5 DEGREE BEND, 8 IN., DUCTILE 115 IRON 2 EA $950.00 $1,900.00 115B 22.5 DEGREE BEND, 12 IN.. DUCTILE IRON 2 EA 115C 11.25 DEGREE BEND, 12 IN., DUCTILE IRON 2 EA 116 TEE, 8 IN. X 8 IN., DUCTILE IRON 5 EA $1,100.00 $5,500.00 117 TEE, 8 IN. X 6 IN., DUCTILE IRON 14 EA $1,050.00 $14,700.00 117B TEE, 12 IN. X 8 IN., DUCTILE IRON 3 EA 117C TEE, 6 IN, X 6 IN., DUCTILE IRON 4 EA 118 CROSS, 8 IN. X 8 IN., DUCTILE IRON 2 EA $2,000.00 $4,000.00 REDUCER, 8 IN. X 4 IN., DUCTILE 119 IRON 1 EA $925.00 $925.00 REDUCER, 8 IN. X 6 IN., DUCTILE 120 IRON 7 EA $925.00 $6,475.00 121 REDUCER. 12 IN X 8 IN, DUCTILE 2 EA $1,000.00 $2,000.00 IRON Bidder's Name Version 5/25/2016 Contractor's Bid for Public Works - 11 CHANGE ORDER NO. 1 GATE VALVE, 8 IN., DUCTILE IRON 122 (WITH VALVE BOX) 12 EA $1,700.00 $20,400.00 GATE VALVE, 6IN., DUCTILE IRON 123 (WITH VALVE BOX) 2 EA $1,450.00 $2,900.00 GATE VALVE, 12 IN., DUCTILE IRON 1236 (WITH VALVE BOX) 1 EA 124 12 IN. X 8 IN. TAPPING SLEEVE AND 1 EA $6,500.00 $6,500.00 8 IN. VALVE (WITH VALVE BOX) 4 IN. X 4 IN. TAPPING SLEEVE AND 125 4 IN. VALVE (WITH VALVE BOX) 1 EA $3,300.00 $3,300.00 126B 6 IN. X 6 IN. TAPPING SLEEVE AND 9 EA $3,600.00 $32,400.00 6 IN. VALVE (WITH VALVE BOX) 12 IN. X 12 IN. TAPPING SLEEVE 126 AND 12 IN. VALVE (WITH VALVE 3 EA $6,000.00 $18,000.00 BOX) 1266 12 IN. X 6 IN. TAPPING SLEEVE AND 6 IN. VALVE (WITH VALVE BOX) 1 EA 127 LINESTOP, 6 IN. 13 EA $4,700.00 $61,100.00 128 LINESTOP, 4 IN. 1 EA $4,300.00 $4,300.00 129 LINESTOP, 12 IN 5 EA $6,500.00 $32,500.00 130 WATER MAIN, 6 IN., DUCTILE IRON 1085 LFT $40.00 $43,400.00 (WITH POLYETHYLENE PIPE WRAP). 131 WATER MAIN, 8 IN., DUCTILE IRON 5,182 LFT $36.00 $186,652.00 (WITH POLYETHYLENE PIPE WRAP) WATER MAIN, 12 IN, DUCTILE IRON 132 (WITH POLYETHYLENE PIPE WRAP) g06 LFT $56.00 $50,736.00 133 MODULAR BLOCK WALL 250 SFT $55.00 $13,750.00 134 MAINTAINING TRAFFIC 1 LS $54,700.00 $64,700.00 135 BARRICADE, TYPE III -A 168 LFT $18.00 $3,024.00 136 BARRICADE, TYPE III-B 144 LFT $18.00 $2,592.00 137 CONSTRUCTION SIGN, TYPE A 24 EA $129.00 $3,096.00 138 CONSTRUCTION SIGN, TYPE B 6 EA $50.00 $300.00 139 CONSTRUCTION SIGN, TYPE C 2 EA $139.00 $278.00 140 ROAD CLOSURE SIGN ASSEMBLY 11 EA $250.00 $2,750.00 DETOUR ROUTE MARKER 141 ASSEMBLY 17 EA $89.00 $1,513.00 SIGN POST, SQUARE, TYPE 2, 142 REINFORCED ANCHOR BASE 391 LFT $9.72 $3,800.52 143 SIGN, SHEET, WITH LEGEND 0.080" 235 SFT $16.75 $3,936.25 Bidder's Name Version 5/25/2016 Contractor's Bid for Public Works - 12 CHANGE ORDER NO. 1 144 SIGN, SHEET, WITH LEGEND 0.100" 18 SFT $34.00 $612.00 145 SIGN AND POST, REMOVE 46 EA $85.00 $3,400.00 SIGN AND POST, REMOVE AND 146 RESET 45 EA $150.00 $6,750.00 147 CONDUIT, HDPE, 2 IN 140 LFT $17.00 $2,380.00 148 UTILITY HANDHOLE 2 EA $950.00 $1,900.00 149 LINE, LIQUID THERMOPLASTIC 500 LFT $0.60 $300.00 PAINT, SOLID, WHITE, 4 IN. TRANSVERSE PAVEMENT 150 MARKING, LIQUID THERMOPLASTIC 972 LFT $1.24 $1,205.28 PAINT, CROSSWALK LINE, 6 IN. TRANSVERSE PAVEMENT 151 MARKING, LIQUID THERMOPLASTIC 174 LFT $4.94 $859.56 PAINT, STOP LINE, 24 IN. PAVEMENT MESSAGE MARKING, 152 LIQUID THERMOPLASTIC PAINT, 6 LFT $65.00 $390.00 LANE INDICATION ARROW 153 LINE, LIQUID THERMOPLASTIC 2.g50 LFT $0.60 $1,770.00 PAINT, SOLID, YELLOW, 4IN. 154 VIDEO RECORD 1 LS $2,000.00 $2,000.00 155 PROJECT INFORMATION SIGN, 24 5 EA $650.00 $3,250.00 IN. X 18 IN. PROJECT INFORMATION SIGN, 36 156 IN. X 36 IN. 2 EA $850.00 $1,700.00 157 UTILITY ALLOWANCE 1 ALLOWANCE $25,000.00 $25,000.00 158 REMOVE, PACKAGE AND 1 LS $15,000.00 $15,000.00 TRANSPORT CSO 30 159 SPRINKLER ALLOWANCE 1 ALLOWANCE $5,000.00 $5,000.00 460 RIVER RGGK SYS DELETED DELETED 161 SHRUB, 3 GALLON 72 EA $60.00 $4,320.00 162 CONCRETE FILL, 18 IN. PIPE 2 CYS $288.92 $577.84 163 CORE MANHOLE, 12 IN. 2 EA $1,100.00 $2,200.00 164 CORE MANHOLE, 18 IN. 2 EA $1,100.00 $2,200.00 PCCP DUMPSTER PAD, 12 FT. X 10 165 FT. X 6 IN. 120 SFT $12.50 $1,500.00 EXISTING LIGHT POLE & 166 FOUNDATION, REMOVE 4 EA $600.00 $2,400.00 NEW LIGHT POLE FOUNDATION, 36 167 IN. X 120 IN. 4 EA $1,000.00 $4,000.00 RELOCATE EXISTING POLE TO 168 NEW FOUNDATION 3 EA $1,500.00 $4,500.00 NEW LIGHT POLE, 40 FT. WITH 169 TWO 150W HPS 16 IN. SHOEBOX 1 EA $4,800.00 $4,800.00 170 4-1C NO. 4 COPPER CABLE 100 LFT $9.00 $900.00 171 CONCRETE PAVED SIDE DITCH 20 LFT $75.00 $1,500.00 Bidder's Name Version 5/25/2016 Contractor's Bid for Public Works - 13 CHANGE ORDER NO. 1 172 PIPE, TYPE 2, CIRCULAR, 15 IN., 23 LFT $54.80 $1,260.40 WATERGRADE C01-1 DETERMINE ELEVATIONS OF LATERALS ON FRANCES 1 EA $14,400.00 $14,400.00 C01-2 LOWER INSTALL ELEVATION OF 1 EA $27,000.00 $27,000.00 STORM SEWER STR30A TO STR30 TOTAL BASE BID (SUM ITEMS 1-172) $4,677,228.64 Total Base Bid A $4,772,918.64 Bidder Credit (Choose 1) None (Enter $0) B -$10,000.00 o Local (Enter Least of 3 /o or $30,000) Regional (Enter Least of 1% or $10,000) Workforce Credit (Choose 1) None (Enter $0) C -$10,000.00 o Local (Enter Least of 2 /o or $20,000) Regional (Enter Least of 1 % or $10,000) Total Base Bid Including Credits (A-B-C) $4,752,918.64 Bidder's Name Version 5/25/2016 Contractor's Bid for Public Works - 14 CHANGE ORDER NO. 1 ADD ALTERNATE A: JEFFERSON BOULEVARD Item. No. Description Oty Unit Unit Price Total Amount Al CONSTRUCTION ENGINEERING 1 LS $6,500.00 $6,500.00 A2 MOBILIZATION AND DEMOBILIZATION 1 LS $7,500.00 $7,500.00 A3 CLEARING RIGHT OF WAY 1 LS $5,500.00 $5,500.00 A4 CURB, CONCRETE, REMOVE 2,075 LFT $2.00 $4,150.00 A5 CONCRETE, REMOVE 590 SYS $4.00 $2,360.00 A6 PAVEMENT REMOVAL 1,510 SYS $6.00 $9,060.00 A7 PIPE, REMOVE 445 LFT $7.00 $3,116.00 A8 STRUCTURE, REMOVE 8 - EA $225.00 $1,800.00 A9 COMMON EXCAVATION 470 CYS $22.00 $10,340.00 A10 B-BORROW 310 CYS $7.50 $2,325.00 All TEMPORARY EROSION AND SEDIMENT CONTROL 1 LS $2,200.00 $2,200.00 Al2 FLOWABLE BACKFILL, NON- REMOVABLE 2 CYS $200.00 $400.00 A13 COMPACTED AGGREGATE, NO. 53, BASE 365 TON $23.00 $8,395.00 A14 MILLING, ASPHALT, 2.5 IN 6.090 SYS $2.00 $12,180.00 A15 HMA SURFACE, TYPE B 595 TON $65.00 $38,675.00 A16 HMA INTERMEDIATE, TYPE B 145 TON $60.00 $7,250.00 A17 HMA BASE, TYPE B 340 TON $47.00 $15,980.00 A18 HMA FOR PATCHING 35 TON $75.00 $2,625.00 A19 HMA WEDGE AND LEVEL, TYPE B 336 TON $60.00 $20,160.00 A20 ASPHALT FOR TACK COAT 2 TON $15.00 $30.00 A21 CURB RAMP, CONCRETE, G 90 SYS $145.00 $13,050.00 A22 SIDEWALK, CONCRETE, 4 IN. 200 SYS $30.00 $6,000.00 A23 CURB, CONCRETE 485 LFT $17.00 $8,246.00 A24 CURB, MODIFIED, CONCRETE 1,720 LFT $21.00 $36,120.00 A25 PCCP FOR APPROACHES, 8 IN. 305 SYS $55.00 $16,775.00 A26 SODDING 1,090 SYS $4.52 $4,926.80 A27 PIPE, TYPE 2, CIRCULAR, 12 IN. 80 LFT $32.00 $2,560.00 A28 ADJUST CASTING TO GRADE 5 LFT $350.00 $1,750.00 A29 ADJUST VALVE BOX TO GRADE 5 EA $35.00 $175.00 A30 PIPE PLUG, CONCRETE 8 EA $385.00 $3,080.00 A31 MANHOLE, J15, MODIFIED 3 EA $4,750.00 $14,250.00 A32 INLET B-15 1 EA $4,000.00 $4,000.00 A33 INLET C-15 2 EA $3,500.00 $7,000.00 A34 INLET, B15, MODIFIED 3 EA $3,500.00 $10,500.00 A35 INLET, C15, MODIFIED 1 EA $3,500.00 $3,500.00 Bidder's Name Version 5/25/2016 Contractor's Bid for Public Works - 15 CHANGE ORDER NO. 1 A36 MAINTAINING TRAFFIC 1 LS $1,500.00 $1,500.00 A37 CONSTRUCTION SIGN, TYPE A 2 EA $129.00 $258.00 SIGN POST, SQUARE, TYPE 2, A38 REINFORCED ANCHOR BASE 198 LFT $9.72 $1,924.56 A39 SIGN, SHEET, WITH LEGEND 0.080" 111 SFT $16.75 $1,859.25 SIGN AND POST, REMOVE AND A40 RESET 1 EA $150.00 $150.00 LINE, LIQUID THERN40PLASTIC A41 PAINT, SOLID, WHITE, 4IN. 878 LFT $0.60 $526.80 TRANSVERSE PAVEMENT A42 MARKING, LIQUID THERMOPLASTIC 675 LFT $1.24 $837.00 PAINT, CROSSWALK LINE, 6IN. TRANSVERSE PAVEMENT A43 MARKING, LIQUID THERMOPLASTIC 90 LFT $4.94 $444.60 PAINT, STOP LINE, 24 IN. PAVEMENT MESSAGE MARKING, A44 LIQUID THERMOPLASTIC PAINT, 8 EA $15.00 $120.00 SHAREDLANE A45 LINE, LIQUID THERMOPLASTIC PAINT, BROKEN, YELLOW, 4 IN. 335 LFT $0.70 $234.50 PAVEMENT MESSAGE MARKING, A46 LIQUID THERMOPLASTIC PAINT, 9 EA $65.00 $585.00 LANE INDICATION ARROW PAVEMENT MESSAGE MARKING, A47 LIQUID THERMOPLASTIC PAINT, 7 EA $65.00 $455.00 ONLY A48 LINE, LIQUID THERMOPLASTIC PAINT, SOLID, YELLOW, 4IN. 2,085 LFT $0.60 $1,251.00 A49 VIDEO RECORD 1 LS $500.00 $500.00 A50 PIPE, TYPE 2,E CIRCULAR, 12 IN., WATERGRAD 41 LFT $60.00 $2,460.00 A51 PIPE, TYPE 2, CIRCULAR, 15 IN. 50 LFT $37.00 $1,850.00 A52 PIPE, TYPE 2, CIRCULAR, 15 IN., WATERGRADE 162 LFT $45.00 $7,290.00 A53 PIPE, TYPE 2, CIRCULAR, 18 IN, 37 LFT $51.00 $1,887.00 PIPE, TYPE 2, CIRCULAR, 18 IN., A54 WATERGRADE 52 LFT $51.00 $2,652.00 A55 PIPE, TYPE 2, CIRCULAR, 24 IN. 42 LFT $53.00 $2,226.00 TOTAL ALTERNATE A: JEFFERSON BOULEVARD (SUM ITEMS Al-A55) $321,487.51 Bidder's Name Version 5/25/2016 Contractor's Bid for Public Works - 16 CHANGE ORDER NO. 1 ADD ALTERNATE B: ST. LOUIS BOULEVARD AND PART OF WAYNE STREET Item No. Description Qty Unit Unit Price Total Amount B1 CONSTRUCTION ENGINEERING 1 LS $4,500.00 $4,500.00 B2 MOBILIZATION AND DEMOBILIZATION 1 LS $6,500.00 $6,500.00 B3 CLEARING RIGHT OF WAY 1 LS $4,500.00 $4,500.00 64 EXCAVATION, COMMON 80 CYS $22.00 $1,760.00 B5 CURB, CONCRETE, REMOVE 1,130 LFT $2.00 $2,260.00 B6 CONCRETE, REMOVE 1,360 SYS $4.00 $5,440.00 B7 PAVEMENT REMOVAL 315 SYS $6.00 $1,890.00 B8 STRUCTURE, REMOVE 1 EA $250.00 $250.00 B9 B BORROW 230 CYS $7.50 $1,725.00 B10 TEMPORARY EROSION AND SEDIMENT CONTROL 1 LS $4,500.00 $4,500.00 B11 FLOWABLE BACKFILL, NON - REMOVABLE 2 CYS $250.00 $500.00 B12 COMPACTED AGGREGATE, NO. 53, BASE 30 TON $20.00 $600.00 B13 MILLING, ASPHALT, 2.5 IN 2,950 SYS $2.00 $5,900.00 B14 HMA SURFACE, TYPE B 250 TON $68.00 $17,000.00 B15 HMA FOR PATCHING 50 TON $75.00 $3,750.00 B16 HMA WEDGE AND LEVEL, TYPE B 162 TON $65.00 $10,530.00 B17 ASPHALT FOR TACK COAT 1 TON $15.00 $15.00 B18 CURB RAMP, CONCRETE, G 30 SYS $145.00 $4,350.00 B19 SIDEWALK, CONCRETE, 4 IN. 1,315 SYS $30.00 $39,450.00 B20 CURB, MODIFIED, CONCRETE 934 LFT $22.00 $20,548.00 B21 PCCP FOR APPROACHES, 6 IN. 35 SYS $50.00 $1,750.00 B22 PCCP FOR APPROACHES, 8 IN. 934 SYS $52.00 $48,568.00 B23 SODDING 1,320 SYS $4.52 $5,966.40 B24 PIPE, TYPE 2, CIRCULAR, 12 IN. 53 LFT $34.00 $1,802.00 B25 ADJUST CASTING TO GRADE 5 LFT $350.00 $1,750.00 B26 ADJUST VALVE BOX TO GRADE 10 EA $35.00 $350.00 B27 INLET B-15 1 EA $2,800.00 $2,800.00 B28 MANHOLE, C4, MODIFIED 1 EA $2,600.00 $2,600.00 B29 MANHOLE, J15, MODIFIED 1 EA $4,800.00 $4,800.00 B30 MAINTAINING TRAFFIC 1 LS $3,500.00 $3,500.00 B31 SIGN POST, SQUARE, TYPE 2, REINFORCED ANCHOR BASE 15 LFT $9.72 $145.80 B32 SIGN, SHEET, WITH LEGEND 0.080" 12 SFT $16.75 $201.00 B33 SIGN AND POST, REMOVE 2 EA $85.00 $170.00 Bidder's Name Version 5/26/2016 Contractor's Bid for Public Works - 17 CHANGE ORDER NO. 1 SIGN AND POST, REMOVE AND B34 RESET 4 EA $150.00 $600.00 TRANSVERSE PAVEMENT B35 MARKING, LIQUID THERMOPLASTIC 44 LFT $4.94 $217.36 PAINT, CROSSWALK LINE, 6 IN. TRANSVERSE PAVEMENT B36 MARKING, LIQUID THERMOPLASTIC 11 LFT $4.94 $54.34 PAINT, STOP LINE, 24 IN. LINE, LIQUID THERMOPLASTIC B37 PAINT, SOLID, YELLOW, 4 IN. 925 LFT $0.60 $555.00 TOTAL ALTERNATE B: ST. LOUIS BOULEVARD AND PART OF WAYNE STREET (SUM ITEMS B1-A37) Bidder (Firm): Walsh & Kelly, Inc. Address: 24358 State Road 23 City/State/Zip: South Bend, IN 46614 By Bidder's Name $211,797.90 Telephone Number: ( 574 ) 288-4811 (Signature) Dustin Hilary, Area Manager (Printed Name of Person Signing) Version 5/25/2016 Contractor's Bid for Public Works - 18 CHANGE ORDER NO. 1 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 08/06/16 Name Toy Villa fw�p Department Engineering BPW Date 08/23/16 Phone Extension 5920 Required Prior to Submittal to Board Legal ❑ Attorney Name Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type —Required for All Submissions ❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ® Change Order No. 2 ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control ❑ Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Amount of Required In Walsh & Kelly, Inc. If Yes ❑ No U Yes Name of Company East Bank Sewer Separation — Phase 5 (Division B) Sewer Bond 114-062A Sewer Bond 1050.460.31.02 Approval of Change Order #2 ❑ Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment. E-Verifv. Iran. etc. Increase $ 118,071.00 Decrease $ Previous Amount Current Percent of Change New Amount Total Percent of Change: Copy Original ❑ ❑ ® ❑ ® ❑ 2.30% $ 5,253,800.66 3.40% Dispersal After Approval Aaron Kobb, Judy Love, Beth Leonard Roger Nawrot Tov Villa