HomeMy WebLinkAboutUpcoming Schedule 8.21-9.3Upcoming '•
,�t August
O •
o -o ��w
SMART STREETS SOUTH BEND f
• Michigan St. will remain closed between LaSalle Ave. and
Riverside Dr. while construction on the Marion St. and Bartlett
St. roundabouts continues.
• The expected completion date of the Marion St. and Bartlett St.
roundabouts is Thursday, September 7, 2016.
• Access to all businesses in the downtown area will be maintained
during construction.
• Bartlett St. will remain closed between Michigan St. and N. St.
Joseph St. until Thursday, September 7, 2016.
• The sidewalks on both sides of Bartlett St. will be closed between
Michigan St. and N. St. Joseph St. during this time.
• Main St. will be closed between Marion St. and LaSalle Ave.
during roundabout construction.
• Main St. and St. Joseph St. will experience partial lane closures
through the downtown area through the Fall as streetscape work
is completed.
• Michigan St. will be reduced to one lane in each direction of
travel between Bartlett St. and Angela Blvd.
,qq Angella Blvd E Angela Blvd
3s ` Key
mo PI°-� m o
■ Lane Closure
arkovash Ave 3 "'
Ton#r ' ■ Lane Restriction.
A+e I Q
w aka
Ave I
St Vincent 5#
orth'oSe 4r Hgward Si
#2iv CQrhy Blvd
Leeper Park ors# —i
m Park Ln r c
Nav2�rre S#
NOR
ion z UV so U
a Pointe at St. _
Jo h Apartments G
se11o. Ave 'L sal Ie Ave
z z
€ CD CD
St S out Bend
South Bend
Museum of Art
4 E Jefferson Blwd
Howard Park
CU t � �
cr, ca
Upcoming Schedule
August 21st - September 3rd
• The Chippewa Ave. roundabout opened to northbound traffic
Friday, August 5, 2016.
• Main St. converted back to 1 -way traffic between Sherwood St.
& Chippewa Ave. and will remain this way until construction
on the Chippewa Ave. roundabout is complete.
• Bronson St. and South St. closed between Main St. and
Michigan St. on July 28, 2016 causing partial lane closures on
both Main St. and Michigan St.
W Wayne St
(n
Cl) E
3
,
m
N
^
E Western Pve
N
r
m
A
A
°—'
—
E Monroe St
a
N
0
°i
Monroe St
o
o
— 3
H
N
?2
■ Monroe Park Apartn,!
N
South St
E South St
E South St
c =
'!' License Branch -BMV
Key
N
A
n
d
Lane Closure
r
C.
d
d
N
O
M
Lane Restriction
�o
0
a
=r E Tutt St
E T�
Work One ■
and Mattress Showroom
E 0aK
Key
■ Lane Closure
r:
Lane Restriction
UP
1 "! Eckman St DOrnirI ayt. I
i Monroe Primary C
c
ar E Farneman Ave
L
c_U
G
Paul's Auto Yard & e
Roll -off Containers
:W
Sher St
N
N
ningsS 0
CL o
N 3 ryn
0 ac E
N D
St
a,
Q'
a
E
o
Chippewa Bowl ■ ai .A. SouftGate Church
W Chippewa Ave Chippewa Ave s'
0
CL
D
c a
o
c
rr ch
DO Grill &
Chill Restaurant
a Discount Tire Store
- South Bend, IN
US Post Office
Barbie St
c
CL
d
H
5
OC
Ga
Luelde5'
Teri,,
Barbie St