Laserfiche WebLink
REGULAR MEETING <br />JULY 12, 2016 225 <br />SNIDER RECREATION INC <br />10139 Royalton Road, Suite K <br />North Royalton, OH 44133 <br />Bid was signed by: James C. Snider <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: 2016-2706A $120,000.00 <br />2016-2706B $120,000.00 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Relos and carried, the above bids were <br />referred to the Park Department for review and recommendation. <br />AWARD BID — THREE (3)MORE OR LESS, 2016 OR NEWER, COMPACT FOUR DOOR <br />SEDAN AUTOMOBILES - SPEC Y (BUILDING DEPARTMENT CAPITAL LEAS <br />Mr. Jeffrey Hudak, Central Services, advised the Board that on June 14, 2016, bids were <br />received and opened for the above referenced vehicles. After reviewing those bids, Mr. Iludak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Jordan Motors, Inc., 609 East Jefferson Boulevard, Mishawaka, Indiana 46545, in the unit price <br />amount of $16,735.00 for a total of $66,940.00 for four (4) vehicles. Therefore, Ms. Maradik <br />made a motion that the recommendation be accepted and the bid be awarded as outlined above. <br />Mr. Relos seconded the motion, which carried. <br />APPROVE AMENDMENT TO BID AWARD MEMO MARRIOTT HOTEL SITE <br />DEVELOPMENT AT IIALL OF FAME PHASE.I — PROJECT NO. 116-021 <br />In a Memo to the Board, Mr. Richard Estes, Engineering, stated on June 28, 2016, he submitted a <br />Memo to the Board recommending the award of the above project to Majority Builders. Included <br />in that Memo was a bid tab. Mr. Estes stated he is now requesting to revise that bid tab showing <br />that Rieth Riley's total be corrected from $897,806.32 to $3,979,610.00 due to an error on their <br />part in listing the unit price total rather than the multiple unit's column total. He noted the <br />correction to the math error does not affect the bid award. Upon a motion by Ms. Maradik, <br />seconded by Mr. Relos and carried, the corrected Memo and bid tabulation was approved for the <br />record. <br />AWARD QUOTATION — 2016 DOWNSPOUT DISCONNECT PROGRAM PROJECT NO <br />115-098 (WASTEWATER OTHER CONTRACTUAL) <br />Ms. Hana Parkhill, Engineering, advised the Board that on June 28, 2016, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Parkhill recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Acorn Landscaping, LLC, 3680 West Sample Street, South Bend, Indiana <br />46619, in unit prices not to exceed the amount of $48,355.00. Therefore, Ms. Maradik made a <br />motion that the recommendation be accepted and the quotation be awarded as outlined above. <br />Mr. Relos seconded the motion, which carried. <br />AWARD QUOTATION —NORTH STATION FILTRATION PLANT VESSEL NO 5 RAW <br />WATER STAINLESS STEEL PIPE REPI ACEMENT (WATFR WORKS OPERATIONS) <br />Mr. Matthew Bussell, Water Works, advised the Board that on June 28, 2016, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Bussell recommended that the Board award the contract to the sole bidder, Zimmerman <br />Industrial Piping, Inc., 117 North Clay St, Mishawaka, Indiana 46545, in unit prices not to <br />exceed the amount of $31,885.50. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Mr. Relos <br />seconded the motion, which carried. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS - MARTIN <br />LUTHER KING, JR. CENTER HVAC REVISIONS — PROJECT NO 116-064 (PARK BOND) <br />In a memorandum to the Board, Ms. Nadia Correa, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Therefore, upon a motion made <br />by Ms. Maradik, seconded by Mr. Relos and carried, the above request was approved. <br />