Laserfiche WebLink
REGULAR MEETING NOVEMBER 27.2006 <br />BOWEN ENGINEERING CORPORATION <br />1110 Arrowhead Court, Suite B <br />Crown Point, Indiana 46307 <br />Bid was signed by: Mr. Todd Lemen <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $293,000.00 <br />Upon a motion made by Mr. Gilot, seconded by Mr. Littrell, and carried, the above bid <br />was referred to Environmental Services for review and recommendation. After reviewing <br />the bid, Mr. Patrick Henthorn, Environmental Services, recommended that the Board <br />award the contract to the lowest, responsive and responsible bidder, Bowen Engineering <br />Corporation, in the amount of $293,000.00. Therefore, Mr. Gilot made a motion that the <br />recommendation be accepted and the bid be awarded as outlined above. Mr. Littrell <br />seconded the motion, which carried. <br />OPENING OF QUOTATIONS -ARGYLE DRIVE WALKWAY AT ERSKINE <br />VILLAGE - PROJECT NO. 106-086 (GENERAL FUND) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed <br />Quotations for the above referenced project. The following Quotations were opened and <br />read: <br />Quotation was submitted by: <br />ORTIZ CONCRETE <br />530 Pulaski Street <br />South Bend, Indiana, 46619 <br />Quotation was signed by: Mr. Jose Ortiz <br />Non-Discrimination commitment form was completed <br />QUOTE: $34,775.00 <br />Quotation was submitted by: <br />L.L. GEANS CONSTRUCTION, INC. <br />1923 North Home Street <br />Mishawaka, Indiana, 46545 <br />Quotation was signed by: Mr. Mike Glenn <br />Non-Discrimination commitment form was completed <br />QUOTE: $56,504.00 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above <br />Quotations were referred to the Engineering Department for review and recommendation. <br />OPENING OF QUOTATIONS -SEWER AND WATER LATERAL_INS_TALLATION <br />- 701 PENNSYLVANIA AVENUE - PROJECT NO. 106-090 (CIP) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed <br />quotations for the above referenced project. The following quotations were opened and <br />read: <br />NIEZGODSKI PLUMBING, INC. <br />Post Office Box 3096 <br />South Bend, Indiana 46619 <br />Quotation was Submitted by Mr. David Niezgodski <br />1 <br />1 <br />1 <br />QUOTATION: <br />