Laserfiche WebLink
This is EXHIBIT C, consisting of 4 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />U. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $280,270 based on the following estimated distribution of <br />compensation: <br />a. Topographic Survey $7.170.00 <br />b. Geotechnical Investigation $3,950.00 <br />c. Conceptual Design (Previously Billed) <br />$18,790.00 <br />d. Schematic Design (30% Submittal) <br />$35,250.00 <br />e. Design Development (60% Submittal) <br />$47,000.00 <br />f. Construction Documents (90% & 100% Submittal) <br />$105,750.00 <br />g. Bidding and Negotiation <br />$11,750.00 <br />h. Construction Administration <br />$35,250.00 <br />i. "Rule 5" Erotiosn Control Permitting $3,750.00 <br />j. Project Cost Estimation $10,635.00 <br />k. Asbestos Inspection $975.00 <br />2. Engineer may alter the distribution of compensation between individual phases noted herein <br />to be consistent with services actually rendered, but shall not exceed the total Lump Sum <br />amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period. <br />Page 1 <br />Exhibit C—Compensation Packet BC-1: Basic Services (other than RPR) — Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright O 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />