Laserfiche WebLink
City of South Bend Project No. <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Blair Bennett <br />CONTRACTOR: JJamco Construction, Inc. <br />PROJECT: Hoffman Hotel <br />Project No. <br />Change Order No. 1— 07/12/16 <br />SUBJECT: Clarifications and Revisions to Contract <br />Documents ISSUE DATE: July 12, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by Change Order 1: <br />1. Increase in final project cost. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />SPECIFICATIONS: <br />Scope of Work: <br />R. Exterior masonry repairs requiring use of 135 ft boom lift <br />