Laserfiche WebLink
Project No. 11B-001 Change Order No. 12 — 6/10/16 <br />tipU PH b� <br />CITY OF SOUTH BEND ` <br />w <br />m r <br />PROJECT NAME: One -Way to Two -Way Street Conversion —Division A <br />PROJECT NUMBER: 116-001 <br />Division A: <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />127 <br />SIGN POST, SQUARE, TYPE 1, UNREINFORCED ANCHOR BASE <br />-113 <br />LFT <br />$11.50 <br />($-1,299.50) <br />128 <br />SIGN POST, SQUARE, TYPE 2, UNREINFORCED ANCHOR BASE <br />226 <br />LFT <br />$18.00 <br />$4,068.00 <br />OWNER: City of South Bend CONTRACTOR: Rieth-Riley <br />Construction <br />Signature <br />Date <br />Sig t e <br />to -It. <br />Date <br />$2,768.50) <br />Sheet 3 of 3 <br />