Laserfiche WebLink
Change Order No. 12 <br />One- Way to Two -Way Street Conversion <br />Division A <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. 10504741 <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion, Division A <br />Project No. 116-001 (114-045) <br />SUBJECT: Sign Post Revisions <br />ISSUE DATE: June 10, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Revision 5 — The Sheet Sign and Post Summary has been revised to include 2 <br />posts for ground mounted sheet signs with widths of 48 inches or greater. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />1. Bid/Proposal Form: <br />Subtract 113 LFT from Line Item 127: SIGN POST, SQUARE, TYPE 1, <br />UNREINFORCED ANCHOR BASE, -113 LIFT @ $11.50/CYS for a total deduction of <br />($-1,299.50) <br />Add 226 LIFT to Line Item 128: SIGN POST, SQUARE, TYPE 2, UNREINFORCED <br />ANCHOR BASE, 226 LIFT @ $18.00/LFT for a total addition of $4,068.00 <br />•_ ou <br />NO CHANGE REQUIRED <br />Sheet 1 of 3 <br />