Laserfiche WebLink
06-24-'16 09:46 FROM- TCS Office <br />\Traffic <br />5747727002 T-590 1`0001/0001 F-799 <br />Change Order # 1 Revised <br />Letting Date CO Date Contract Number <br />/Control <br />S Specialists, Inc <br />9/2/201ti5/31/2016 R-37498-A <br />Project Location <br />Attn: Rubin Alvarado <br />Safe School Route <br />Rieth- Riley ( South Bend) <br />Coquillard School, St John School, & Kennedy Center <br />St. Jose h Co. <br />REP I Quote Valid Start Date <br />Completion Datel <br />Closure Date <br />Closure Days <br />Calendar Days <br />TJT 45 Days <br />63 <br />Line Item Number Description <br />Quantity <br />Unit Price <br />Total <br />C01-1 801-06640 Construction Sign, A <br />1 <br />1 <br />14 Ea. <br />$134.00 Ea. <br />$1.876.00 <br />GENERAL NOTES: <br />1 -Above Quote is based on plans and specifications at time of bid. Calendar days maybe adjusted upon request <br />2. Quote Valid for 45 calendar days ONLY. Contracts awarded after 45 days may require a requote. <br />3. Changes by Engineer/Contractor require approved change order. <br />4. Items not paid by owner will be invoiced to contractor at a daily rate, based on adjusted Item unit price. <br />5. Contact TCS, Inc for re -quote if all items are not accepted, <br />6. Bid Bond not included, add 1% of total if required. <br />Signatory Contractor of LIUNA, Certified WBE, Member of ATSSA & BBB <br />305 W. Hamilton Dr. Knox, IN 46534 <br />574-772-7001 Office <br />574-772-7002 Fax <br />219-916-5585 Tracey Cell <br />219-916-4613 Barry Cell <br />tcsinc .tcspecialists net <br />6/24/2016 <br />App ved By: Tra y Triska Date <br />Accepted By: <br />Date <br />Page i of 1 <br />