Laserfiche WebLink
oo:. <br />PUBLIC AGENDA SESSION JANUARY 19, 2006 <br />The Public Agenda Session of the Board of Public Works was convened at 10:30 a.m. on <br />January 19, 2006 by Board President Gary A. Gilot, with Mr. Carl P. Littrell. Mr. <br />Donald E. Inks was absent. Also present was Board Attorney Thomas Bodnar. Board of <br />Public Works Clerk Angela Jacob presented the Board with a proposed agenda of items <br />presented by the public and by City Staff. <br />ITEM REMOVED FROM AGENDA <br />-Encroachment <br />Mr. Littrell stated the encroachment does not need to be approved by the Board of <br />Works. <br />OPENING OF BIDS -PARKING GA_ RAGE -PROJECT NO. 105-076 (COIT/BOND <br />ISSUE) <br />This was the date set for opening of sealed bids for the above referred to project. The <br />Clerk tendered proof of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. <br />KASER-SPRAKER CONSTRUCTION, INC. <br />25487 West State Road No.2 <br />South Bend, Indiana 46619 <br />1 <br />1 <br />Bid was signed by: Mr. Daniel Kaser <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment form was not included in bid <br />**It was noted the above form was submitted to the Clerk of the Board <br />after the Board adjourned <br />Five percent (5%) Bid Bond was submitted <br />BID: Base Bid - $801,375.00 <br />r <br />,. <br />Alternate 1-Woodward Court Renovations $30,570.00 <br />Alternate 2 -Site Furnishings $16,590.00 <br />Alternate 3 - Landsca ing $10,100.00 <br />Alternate 4 -Irrigation $10,845.00 <br />Alternate 5 - New Garage Pedestrian <br />Access (Stair #7) <br />WI-20 -Protected Pedestrian Access $15,520.00 <br />Route <br />WI-45 -Provide Level 1 Stairway $7,420.00 <br />Access at NE Corner to Colfax <br />Avenue <br />WI-52 -New Canopy $4,180.00 <br />WI-53 - Mullion/Framing Structure $106,295.00 <br />w/Perf Aluminum Panels & Cast <br />Alum Letters <br />Alternate 6 -Cornice Assembly $29,100.00 <br />Alternate 7 -New Fabricated Metal Facade $(1,500.00) <br />Alternate 8 -Interior Signs $44,460.00 <br />Alternate 9 -Replace Overhead Coiling $6,380.00 <br />Gril~'~at South Vehicle Entry Lane <br />Alternate 10 -Interior Painting $250,000.00 <br />Alternate 11 - Lobb Ceiling $8,280.00 <br />Alternate 12 -New Interior Stair (#8) $13,100.00 <br />Alternate 13 -Illuminated Signs $7,160.00 <br />CASTEEL CONSTRUCTION CORPORATION <br />23186 West Ireland Road <br />South Bend, Indiana 46614 <br />