Laserfiche WebLink
REGULAR MEETING <br />MAY 10, 2016 170 <br />Bid was signed by: Robert Routine <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Bid: $24,809.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Domu and carried, the above bids were <br />referred to Engineering and Century Center for review and recommendation. <br />OPENING OF BIDS — CENTURY CENTER SERVICE COURT IMPROVEMENTS — PROJECT <br />NO. 116-006 (HOTET /MOTEL TAX) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. The <br />Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News, <br />which were found to be sufficient. The following bid was opened and publicly read: <br />DAYS ELECTRICAL <br />55169 CR 3 North <br />Elkhart, IN 46514 <br />Bid was signed by: Robert Routine <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />BASE BID: <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />TotalAmount <br />Furnish all labor, services, materials, insurance and <br />1 <br />equipment for the Project as described in <br />1 <br />Lump <br />Special Provisions -Project Description Base <br />Sum <br />Bid. <br />ALTERNATE41 <br />I/em <br />o <br />Description <br />Quantity <br />Unit <br />TotalAmoun <br />In <br />In lieu of the masonry screen enclosure wall, <br />I <br />substitute the metal panel screen enclosure wall as <br />I <br />Lump <br />in Drawing Sheet C2, Detail-7. <br />Sum <br />ALTERNATE#2 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Total Amount <br />1 <br />Work as described on Dravnng meet L1, <br />Lump <br />Landscape <br />1 <br />I Sum <br />ALTERNATE#3 <br />Item <br />N <br />Description <br />Quantity <br />UnitEmount <br />1 <br />or c as described on Drawing Sheet C2, Sitc <br />Lump <br />Electrical/LighfingImprovements <br />l <br />g <br />.00 <br />ALTERNATE#4 <br />ItemFEElectrical/Li2btin <br />No. <br />scription <br />Quantity <br />Unit <br />TotalAmoun <br />I <br />ork as escribed on Drawing Sheet C2, Site <br />Lump <br />Im ro_vements. <br />1 <br />cum <br />