My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2383 contracting the boundaries of the West Washington-Chapin Development Area
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2383 contracting the boundaries of the West Washington-Chapin Development Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 9:26:39 AM
Creation date
7/28/2009 9:26:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mechanical, Systems <br />. The building contains a few radiators but has no heating unit in any level including the basement. The <br />electrical system is inadequate in service fixtures and outlets. Both apartments have only a single <br />receptacle outlet in combination with a wall fixture. There are no wall switches nor light fixtures in any <br />ceilings and the service box in the hallway was removed. Wiring is a combination of old Romex and BX. <br />The plumbing appears to be in reasonably good condition with respect to the main drain lines. However, <br />many of the water. supply lines require replacement and all bath and kitchen plumbing fixtures require <br />complete replacement. <br />Renovation Requirements and Cost Estimates <br />Option 1 <br />Option I is the minimum treatment required to the 1305 portion of the structure as the initial step to utilize <br />this portion of the 3-storefront building. The repairs and improvements are limited to: a) making the <br />building weather-tight, b) returning the first floor store area to a condition suitable for tenant use and c) <br />treating the exterior (particularly the front facade) to a repaired and restored condition to match the <br />adjacent storefronts, if these represent the original facade of the structure. <br />Reconstruction requirements and related cost estimates for Option I are as follows: <br />Work Items Estimate <br />(Exterior) <br />o Roofing repairs $3,500.00 <br />• o West wall repair, painting, cover with appropriate material 4,200.00 <br />o Replace damaged and missing windows and frames on second floor 3,950.00 <br />o Repair and restore fire-damaged frame exterior wall on second level 1,950.00 <br /> (east side) <br />o Replace storefront windows and entry door, repair/rebuild- storefront, 3,030.00 <br /> Bulkheads <br />o Remove unacceptable green paint from front facade, restore masonry, 2,920.00 <br /> repaint window frames and trim <br />o Rebuild rear porch, replace rear entry door and door and canopy to second 1,700,000 <br /> level rear entrance <br /> Exterior Subtotal $21,250.00 <br />(Interior) (Options for numbered items are presented below.) <br />o Removal existing partitions in center area of store $475.00 <br />1) Repair water damaged section of flooring, cover with new flooring <br />(tile or carpet or new wood) <br />2,650.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.