My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2456 expanding the boundaries of the Airport Economic Development Area, expanding the allocation area for purposes of tax increment financing and amending the Airport Economic Development Area Development Plan (Portage Prairie)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2456 expanding the boundaries of the Airport Economic Development Area, expanding the allocation area for purposes of tax increment financing and amending the Airport Economic Development Area Development Plan (Portage Prairie)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2009 10:50:11 AM
Creation date
7/27/2009 10:34:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Members of this Committee shall serve without pay for two year terms. Appointed members <br />shall serve at the pleasure of the Commission. Vacancies occurring through death, resignation or <br />other causes shall be filled for the unexpired term in the same manner as the original <br />appointments. <br />Rules <br />The Committee shall adopt such rules and procedures as are necessary to conduct its business, <br />including the dates and times of meetings and hearings. <br />Powers and Duties <br />The Committee shall function in an advisory capacity to the Redevelopment Commission. It <br />shall review the plans and specifications for all projects located within the Area that involve new <br />construction, exterior renovation or site work. This Review will include design, site planning, <br />open space and other applicable considerations pertaining to compliance with the standards set <br />forth in the Airport Economic Development Area Design Guidelines. In exercising these duties <br />the Committee shall follow the procedures and act within the limitations established in this <br />section. <br />Design Guidelines <br />The Redevelopment Commission shall, by Resolution, adopt Design Guidelines for use by <br />developers on all projects within the Area. The Committee will base their approval of plans on <br />how well the proposals have followed these guidelines. The Design Guidelines may be reviewed <br />and revised as necessary by Redevelopment Commission action. <br />Permits <br />No permit shall be issued for construction, reconstruction, alteration, or rehabilitation of any <br />building in the Area until the plans and specifications for the building have been approved by the <br />Committee. <br />Review <br />All proposals filed with the Committee for review and approval shall be accompanied by <br />architectural plans and/or engineering drawings and specifications for the work involved. Such <br />plans shall be review for compliance with the standards and objectives of the Plan and Design <br />Guidelines. Upon receipt of the plans the staff of the Department of Community & Economic <br />Development will review them, prepare a staff report, and schedule a meeting of the Committee <br />with the developer, generally within two weeks from receipt of the plans. <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.