My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.C.(3) Resolution No. 2590
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2009
>
07/10/09 Meeting
>
6.C.(3) Resolution No. 2590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2009 8:05:27 AM
Creation date
7/8/2009 8:05:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit "A" <br />Mayflower Road Trunk Sanitary Sewer Project -Design Phase <br />Project: Mayflower Road Trunk Sanitary Sewer Project -Design Phase <br />Description: The overall project will consist of the extension of sanitary sewer service <br />from the Nimitz Parkway lift station through the Blackthorn Development to the Indiana <br />Toll Road, crossing the Indiana Toll Road to Mayflower Road, and in the Mayflower <br />Road right-of--way to the Portage Prairie Development, just south of Adams Road. The <br />project will likely involve approximately 11,500 linear feet of new sanitary sewer system, <br />which will include two (2) lift stations, forcemain, gravity main and sewer leads. The <br />project will be designed in accordance with the "Mayflower Road Trunk Sanitary Sewer <br />Study' prepared by Abonmarche Consultants of Indiana. LLC. dated March. ?009. The <br />Design Phase shall consist of the following Tasks: <br />Task #l : Field Survey <br />Task #2: Design Development <br />Task #3: Geotechnical Investigation <br />Task #4: Final Design <br />Task #5: Right-ol=Way Engineering <br />Task #6: Bid Period Services <br />Task #7: Construction Period Services <br />Budget: The Design Phase budget shall not exceed Three Hundred Thousand Dollars <br />($300,000.00). Money for the Design Phase comes fi-om the Airport Economic <br />Development Area TIF. <br />Proposed Schedule: <br />Completion Date <br />Task #1: Field Survey <br />Task #2: Design Development <br />Task #3: Geotechnical Investigation <br />Task #4: Final Design <br />60 days after Notice to Proceed <br />l 20 days after Notice to Proceed <br />60 days after Preliminary Plan <br />submission to the City <br />75 days after City review of the <br />Preliminary Plans <br />
The URL can be used to link to this page
Your browser does not support the video tag.