Laserfiche WebLink
Section 6: Sec. 6-36.2 Heating, air conditioning and ventilating licenses be amended by adding (k) <br />as follows: <br />(k) Termination of License Holder <br />1. In the event that the license holder leaves the employment of a business fum, company, <br />or corporation, that business fum, company, or corporation shall have thirty (30) days <br />to secure another license holder. Anew license shall be issued in accordance with the <br />provisions set forth in Section 6-36.2. <br />2. In the event of a death of the license holder, the business firm, company, or <br />corporation shall have until ten (10) days after the next scheduled examination date <br />to secure another license holder. Anew license shall be issued in accordance with <br />the provisions set forth in Section 6-36.2. <br />Section 7: Sec. 6-36.3 c Permits be amended as follows: <br />c Fees. Each application for a permit for installation of heating, ventilating, air conditioning, <br />and refrigeration equipment or systems shall be accompanied by fees in accordance with <br />the scheduled below; with a minimum permit fee beine $15.00. When the total capacity of <br />any system in any single installation is provided by more than one (1) unit, the sum of the <br />capacities of each unit and the total number of such units shall determine the fee. <br />Space heaters, each 30,000 Btu input or more...$15.00 <br />Warm-air furnaces, unit heaters, cabinet heaters, and radiant tube heaters: <br />Up to 300,000 Btu input: <br />First unit...15.00 <br />Second unit...10.00 <br />300,000 Btu input or more...25.00 <br />Oil and gas conversions: <br />Up to 300,000 Btu input: <br />First unit...15.00 <br />Second unit...10.00 <br />300,000 Btu input or more...25.00 <br />Electric furnaces (air handling): <br />Less than 100 kw input: <br />First unit...15.00 <br />Second unit...10.00 <br />100 kw input or more...25.00 <br />Air conditioning: <br />a. central, electric: <br />Less than 5 tons... <br />First unit...15.00 <br />Second unit...10.00 <br />5 to 10 tons .............25.00 <br />Over 10 tons...........40.00 <br />