My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amending certain sections of Chapter 6, Building
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1998
>
Amending certain sections of Chapter 6, Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2009 2:33:48 PM
Creation date
6/23/2009 2:33:47 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
8/24/1998
Ord-Res Number
8931-98
Bill Number
63-98
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~1~ The permit holder shall fill to grade level and grade the lot with three (3) inches of top soil. <br />Seeding must be done at the time the lot is graded; provided, however, that seeding shall not <br />be required if a new building is scheduled to be constructed on the demolition site within six <br />(6) months after completion of the demolition. <br />Section 3: Sec. 6-10 c Fees, registration and permits for plumbing services be amended as <br />follows: <br />c Schedule of permit fees. Permits issued for plumbing work within the City shall be subject <br />to the following fee schedule; with a minimum permit fee being S 15.00. <br />Each plumbing fixture or trap or set of fixtures on one trap, including water and drainage piping <br />therefor...4.00 <br />Each backflow protection...5.00 <br />Each building sewer: <br />Under 100'...10.00 <br />100' or over...20.00 <br />Each building water: <br />Under 100'...10.00 <br />100' or over...20.00 <br />Each water softener...6.00 <br />Each trailer park sewer...9.00 <br />Each drain within building for rainwater systems...4.00 <br />Each water heater and/or vent...6.00 <br />Each ~as reconnection...15.00 <br />Each gas piping system of 1 to 4 outlets...3.00 <br />Each gas piping system of 5 or more, per outlet...1.00 <br />Each industrial waste pretreatment interception, including its trap an vent, excepting kitchen-type <br />grease interceptors functioning as fixture traps...7.00 <br />Installation, alteration or repair of water piping and/or water treating equipment...5.00 <br />Repair or alteration of drainage or vent piping...5.00 <br />Each drywell...10.00 <br />Each lawn sprinkler system on any one (1) meter, including backflow protection devices thereof...5.00 <br />Fire protection sprinkler system: <br />Up to 30 heads...20.00 <br />Plus each additional 10 heads thereafter up to 500...5.00 <br />Plus each additional 50 heads over 500...5.00 <br />Gas tanks and pumps...10.00 <br />Each re-inspection...25.00 <br />Each additional final inspection...50.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.