Laserfiche WebLink
5 YEAR 25-Jan-06 <br />DARRELL AND MARIANNE CHALSTROM <br />South Bend Centre Township Residential Real Property Tax Abatement Schedule* <br />Estimated Project Cost: <br />Assessed Value: <br />STRUCTURE (assume 85% of project cost) <br />LAND (assume $10,000): <br />Gross Assessed Value: <br />Less Mortgage Exemption: <br />Less Standard Homeowners Deduction <br />Base Assessed Value: <br />$205,500.00 <br />Total Taxes Tax Abated** Tax Paid*** <br />174, 675.00 164,400.00 164,400.00 <br />10,000.00 N/A N/A <br />184,675.00 164,400.00 164, 400.00 <br />(3,000.00) (3,000.00) (3,000.00) <br />(35,000.00) (35,000.00) (35,000.00) <br />$146,675.00 $126,400.00 $126,400.00 <br />Base Assessed Value: $146,675.00 $126,400.00 $126,400.00 <br />Less Maximum Abatement Deduction: N/A N!A ($70,391.20) <br />Less Non-Abated Amount: N/A -56,008.80 N/A <br />Plus Land Assessed Value: N/A N/A 10,000.00 <br />Net Assessed Value: $146,675.00 $70,391.20 $66,008.80 <br />Property Taxes: <br />Assume constant tax rate of: 4.8695% 4.8695% 4.8695°I° <br />Gross Tax (tax rate x net assessed value): $7,142.34 $3,427.70 $3,214.30 <br />Less SRTC (21.6532%): (1,546.55) (742.21) (696.00) <br />Less Homestead Credit (24.4250%): (1,366.77) (655.93) (615.09) <br />Net Tax: 4 229.02 2 029.56 1 903.21 <br />Net Assessed Total <br />Year Value Taxes Due Tax Abated Tax Paid <br />1 $146,675.00 $4,229.02 $2,029.56 $1,903.21 <br />2 146,675.00 4,229.02 2,029.56 1,903.21 <br />3 146,675.00 4,229.02 2,029.56 1,903.21 <br />4 146,675.00 4,229.02 2,029.56 1,903.21 <br />5 146,675.00 4,229.02 2,029.56 1,903.21 <br />5 year totals: $21,145.10 $10,147.80 $9,516.05 <br />*This schedule is for estimation purposes only and assumes constant tax rates. <br />The true tax values wilt ultimately be determined by the actual <br />assessed valuation and the then current tax rates. <br />**Tax Abated is capped at $36,000 of assessed value of structures only <br />and does not include land assessed value. <br />***Tax Paid is calculated using the difference between actual assessed value <br />of structure and maximum abated portion of $36,000 and adding <br />back the land assessed value. <br />